1.    Introduction
 
 
1.2.  This report reviews action taken since the launch of the
      Council's Corporate Strategy in October 1995 and suggests how
      the strategy can be developed to reflect current needs.
 
 
1.3.  A report to Policy and Resources Committee meeting on 22
      December setting out short/medium term objectives is included
      at Appendix 4.  These objectives are in line with current
      service strategies and will inform the strategy review
      process.
 
 
2.    The Corporate Strategy
 
 
2.1.  The Corporate Strategy set out in Charting a Course has
      provided an extremely useful focus for action through an
      exceptionally volatile time of change.  The Strategy gives
      direction and core values to inform the service planning
      process.  The fundamental aims in the strategy hold good.
      These are:-
 
      *   Developing the Quality of Life in Hampshire
 
      *   Caring for the Environment
 
      *   Achieving economic prosperity through sustainable
      development
 
      *   Encouraging participation in public affairs
 
      *   Encouraging  involvement in local communities.
 
 
2.2.  Appendix 1 sets out the key objectives identified under each
      strategic aim.  Actions have been taken in most of the areas
      identified.  The objectives will be re-visited and amended
      appropriately as part of the review.
 
 
2.3.  Linked to those fundamental aims a number of key strategic
      challenges were identified.  An indication of achievement in
      relation to these challenges is set out in Appendix 2.
                              1
 
 
2.4.  It is recommended that members revisit the fundamental aims
      and revalidate or amend them.  In doing this, particular
      regard should be paid to the proposals emerging for "Best
      Value".  The Best Value framework requires:-
 
      *   Corporate objectives to prioritise services and to set
      expected
        performance levels for services.
 
      *   Improvement targets for all services in the form of action
      plans, including
        a rigorous approach to benchmarking and reference to open
      competition
        to improve performance.
 
      *   Each service to be thoroughly reviewed every five years.
 
      *   Community and users views to be sought.
 
 
2.5.  Charting a Course and the "Measuring Corporate Impact" (MCI)
      exercise, previously reported fits well with the concept of
      Best Value and the
      Sub-Committee has already adopted outputs from the latter
      exercise relating to benchmarking/Performance Indicators under
      the strategic objective for Developing the Quality of Life
      (Protecting the Community) - see paragraph 3.2 below.
 
 
3.    Revalidation or amendment of Corporate Objectives?
 
 
3.1.  Fundamental change to the corporate objectives may be
      considered unnecessary but should be left open for re-
      examination as part of the review process.  Members may wish
      to consider combining the last two heads and add a specific
      objective relating to services and staff.  The MCI exercise
      identified an artificial distinction between the final two
      corporate aims.  Revised corporate aims along the following
      lines could be used as a basis for discussion, in order that
      members views can be used to inform the process at an early
      stage.
 
      *   Developing the Quality of Life in Hampshire
 
      *   Caring for the Environment
 
      *   Achieving Economic prosperity through sustainable
      development
 
      *   Promoting community involvement and participation by
      helping
        communities to help themselves
 
      *   Providing quality services through well trained, managed
      and
        motivated staff.
                              2
 
 
3.2.  Subject to agreement or revision of the above, the committee
      will wish to continue building on the work already started and
      referred to in 2.5 .
 
      The Protection of the Community work is now under active
      development via the Public Safety and Crime Prevention Panel.
      The work of the Panel will examine and develop the principles
      of a Community Safety Strategy in accordance with the
      proposals likely to be included in the Crime and Disorder Bill
      due to be published shortly.  This committee has already
      commissioned a study into the correlation between youth crime
      and truancies and exclusions - this is also an area that will
      be covered in the Bill.
 
 
3.3.  A synopsis of suggested performance indicators from the MCI
      Groups is set out in Appendix 3.1.  These provide a sound
      starting point to express policy in terms of objectives
      against which performance can be monitored.
 
 
3.4.  Paragraph 2.5 indicated that there are already examples of
      indicators proposed by MCI Groups being used as the basis for
      assessment of corporate performance.  Appendix 3.2 sets out
      Road Safety Performance Indicators, agreed at the last meeting
      of this Sub-Committee, which have developed from indicators
      proposed by the Protecting the Community MCI Group.
      Individual services are also incorporating defined performance
      indicators into service plans which would allow better
      informed assessment of performance in achieving defined
      objectives.  An example is attached (Appendix 3.3) from the
      Education Development Plan, adopted by Education Committee on
      1 July 1997, setting out service performance indicators.
 
 
3.5.  The next step is to bring these component parts together to
      achieve corporate coherence.  Emphasis needs to be placed on
      continuing to develop performance indicators which transcend
      service boundaries and provide consistent information across
      all our activities, for example, our collective impact on
      youth crime through the youth services, education and social
      services, working with external agencies.
 
 
4.    Next Steps
 
 
4.1.  The Head of the Policy Unit will be working with a small group
      of senior managers drawn from different departments to develop
      the matrix of Performance Indicators and the monitoring
      routines which will enable the Sub-Committee to receive
      reports on overall performance, by reference to the corporate
      strategy and individual service objectives, in moving towards
      targets.  It is suggested that this work is developed over the
      next three months and that a major seminar for members is
      arranged during April 1998 to consider:-
 
                              3
      *   the contents of the detailed forward corporate strategy
 
      *   service plans in context
       *   a complete set of corporate and service performance
      indicators
 
      *   targets, including short term objectives
 
 
Recommendations
 
 
1. To endorse the approach to the review of the strategy in
   paragraph 3 as the basis of work between now and a seminar for
   members in April 1998.
 
 
2. To endorse the synopsis of Performance Indicators developed by
   the MCI Groups (some already adopted by Minute 10/97) set out in
   Appendix 3.1
 
 
3. To approve arrangements for a seminar in April 1998 involving all
   members of the County Council, to adopt a revised forward
   corporate strategy, to be organised by the Chief Executive.
 
 
4. The programme and detailed arrangements for the seminar to be
   approved by this Sub-Committee.
 
 
5. Reports on progress between now and the seminar to be reported as
   appropriate to this Sub-Committee.
 
 
                              4
                                              APPENDIX 1
 
 
Key aims and objectives related to the key aims.
 
 
1. Developing the quality of life in Hampshire
 
   1.   A caring community: ensuring appropriate care for all who
   need it.
 
   2.   Education for life: working with schools, governors,
   parents, colleges
      and the public to enable individuals to gain knowledge,
   skills, civic and
      moral values and a capacity for learning, work and leisure.
 
   3.   Protecting the community: ensuring the safety and security
   of those
      living, working and trading in Hampshire.
 
   4.   Ensuring safe and efficient transportation in Hampshire.
 
   5.   Promoting attractive living and working environments.
 
   6.   Leisure and pleasure: providing opportunities for leisure
   activities
      and tourism.
 
   7.   Providing responsive and effective local government.
 
   8.   Providing and managing services in line with the agreed
   corporate
      values and with a clear corporate identity.
 
   9.   Establishing and analysing the needs of Hampshire's people,
      determining priorities for services and allocating resources
   accordingly.
 
 
2. Caring for the Environment
 
   1.   Ensuring that environmental considerations are at the heart
   of all
      policy formulation.
 
   2.   Conserving, protecting and enhancing the county's natural
   environment.
 
   3.   Conserving, protecting and enhancing the built environment.
 
 
3. Achieving economic prosperity through sustainable development
 
   1.   Encouraging and promoting the county's economy.
 
   2.   Ensuring that the Council's own activities contribute to the
   county's
                              5
      economic well-being.
 
 
4. Encouraging participation in public affairs
 
   1.   Implementing a commitment to open government and access to
      information.
 
   2.   Making information widely available to citizens, businesses,
      students and others.
 
   3.   Developing partnerships with other service providers and
      representatives bodies in Hampshire.
 
   4.   Involving users in the development of services.
 
   5.   Promoting civic education to raise awareness of and increase
      involvement in local government.
 
 
5. Encouraging involvement in local communities
 
   1.   Setting a good example as a corporate citizen.
 
   2.   Supporting local initiatives, voluntary groups and community
      aspirations.
 
 
                              6
                                               APPENDIX 2
 
 
Particular challenges facing the County Council were identified in
Charting a Course as follows.  Some examples of action taken in to
meet these challenges are given under each heading.
 
*  Implementing Local Government Reorganisation
 
   This has been successfully completed with a smooth handover of
   services to the City Councils and a complete regrouping of the
   County's own services.  Services were maintained without
   interruption during the change and all targets (timing and
   budget) were met.
 
 
*  Improving the County's economic health while continuing to care
   for the environment.
 
   In response to this aim, the County Council has promoted an
   economic strategy which, in conjunction with the continuing
   Structure Plan review process, has attempted to address the
   issues of economic prosperity balancing development with the
   needs of Hampshire's community.
 
   In promoting economic prosperity the County Council has attracted
   investment  and job creation.  In addition, the County Council
   has worked in partnership with other agencies to develop policies
   and actions for helping local businesses increase competitiveness
   through expansion, coping with regulations, providing market
   information and international trade opportunities.
 
   The Hampshire County Structure Plan (Review) was placed on
   deposit in March 1996.  The policies in the Plan are guided by a
   vision for Hampshire of it being a prosperous and attractive
   county where social and commercial needs are met in ways that,
   while minimising the need for travel, improve the quality of life
   and sense of community of present and future generations.  The
   Plan promotes specific policies for the economy including that
   sufficient land is available to meet the reasonable demands of
   existing businesses and that a range of sites to meet additional
   requirements be provided.  The Plan emphasises that priority be
   given to making best use of urban and brownfield sites.  The Plan
   also includes policies to support the rural economy.
 
   Examples of activities in support of these policies includes the
   provision of up to date information on the economy and labour
   market and all sectors of the community, working in partnership
   to make available brownfield sites for development, directing
   environmental improvements into urban areas to make them more
   attractive for investment, taking a lead in discouraging retail,
   leisure and commercial proposals from locating in inappropriate
   out-of-centre locations and recognition of the importance of the
   agricultural sector, commissioning the farming study.
 
 
                              7
*  Recognising changing needs, responding to social, demographic and
   economic changes
 
   Hampshire has been affected by a number of changes; local
   government reorganisation in April 1997, a change in Government,
   changes in European Policy and moves towards European Monetary
   Union as well as continuing changes in population numbers and
   make up, business needs and social issues.  The County is now
   more rural although still retaining significant urban areas
   including Basingstoke, Aldershot and Gosport.  The County Council
   has adapted its services and promoted new initiatives to respond
   to these changes.
 
   This includes support for the Welfare to Work initiative
   targeting youth unemployment, responding to the challenges of
   Agenda 2000, commissioning the Hampshire Farming Study, reviewing
   the Structure Plan and adapting to changes in school numbers and
   an ageing population.
 
 
*  Developing the full potential of Hampshire's people, as
   individuals and as a community, etc.
 
   The County Council has continued to develop education and
   learning opportunities throughout life and is committed to
   respond to new initiatives as they arise, such as "Welfare to
   Work", where the Council is working in partnership with the
   Employment Service to get long term unemployed and disadvantaged
   people into work and improve skills and employability.  Through
   formal education, adult education, lifelong learning,
   opportunities for disadvantaged people to access education and
   training and through innovative work such as the Citizenship
   Education project, Hampshire's people are encouraged and
   supported to develop their potential.
 
 
*  Using resources to encourage and support a caring and responsible
   society
 
   Social Services Department work very closely with the voluntary
   sector and with users groups to ensure services are provided in
   ways that are accessible and meet needs - for example Self
   Operated Care Scheme which provides resources directly to
   physically disabled people to arrange their own care, and the
   range of services including the support line and handbook for
   carers.
 
 
*  Creating flexible and responsive management structures and the
   information and communications systems to support them
 
   Local government re-organisation resulted in the need to review
   organisation and management structures.  Some services have been
   grouped together to improve management efficiency - for example
   by creating a Property, Business and Regulatory Services
   grouping.  Area management arrangements in Education, Libraries
   and Social Services have been changed, layers of management have
   reduced and management structures simplified.
 
                              8
   The County Council is a national leader in use of computerised
   management information and communication systems, especially
   Hantsnet but also specialist applications such as the financial
   management system, used extensively by our schools .
 
   Hantsnet is also the enabling factor behind the County Council's
   award winning public information service and system.
 
   A communications strategy, covering the ways in which we
   communicate internally, the ways in which we communicate with
   service users and the communities we serve and our communications
   with press and media is in preparation.
 
 
*  Encouraging County Council staff to realise their potential and
   to use their skills for their own fulfilment and for the benefit
   of Hampshire's people.
 
   A number of iniatives have been promoted to help staff
   development including the development of a corporate approach to
   performance management which will relate personnel training and
   development needs to business objectives; the alignment of
   internal courses to national standards so that in-house courses
   help build towards recognised qualifications; development of a
   new Certificate in Management programme; promotion of National
   Vocational Qualifications (NVQs); promotion of disability
   awareness through briefings and seminars; career counselling and
   advice.
 
*  Enabling Hampshire as a European region to play its part in a
   Europe of regions
 
   This has been developed through the County Council's membership
   of the Assembly of European Regions and Atlantic Arc Commission
   which offer access and input to debate on regional policy
   matters.  The Council also has strong partnerships with Basse-
   Normandie and Bizkaia.  The Brussels office opened in partnership
   with Basse-Normandie, Dorset and the Isle of Wight has raised
   Hampshire's profile with the European Commission and supported
   bids for European funding projects.  The Brussels office has
   strongly supported the lobby for integrated rural development
   raised through the Farming Study which has ensured Hampshire's
   views on reform of CAP and agricultural policy are well
   represented.
 
 
*  Encouraging the people of Hampshire to take an interest in the
   County Council's activities and in the need for a strong local
   democracy
 
   The Citizenship Education Project developed by the Education
   Department and the Policy Unit and supported by the Schools
   Curriculum Assessment Authority is an innovative project to bring
   the importance of a strong local democracy and active
   participation in local affairs to the attention of Hampshire's
   schoolchildren.  Public consultation on major activities and
   projects has regularly been undertaken on, for example, waste
   disposal plans, the structure plan and transportation programmes.
   Regular surveys of customer/clients' wishes and needs are also
   undertaken and are central to service development in, for
                              9
   example, Social Services provision.  The County Council is
   amongst the foremost authorities in developing public access to
   information and local services and issues through the Information
   Centres, Local Information Points, Hantsnet and the World Wide
   Web.
 
 
In order to respond effectively, some areas for action were
identified for particular focus.  These, together with examples of
work related to their development are set out below:
 
 
*   Personal Safety
 
 
  -  report on road safety to Performance Review Sub-Committee
 
  -  commitment by Public Protection Committee to production of
community
 
     safety strategies to combat and reduce crime
 
  -   design of buildings and landscapes
 
  -   CCTV
 
  -   measures to control pollution
 
 
*   Education for Life
 
 
  -   performance of schools in top 10% CGSE results
 
  -   lifelong learning
 
  -   citizenship education project
 
  -   Welfare to Work
 
  -   skills training
 
  -   equal opportunities in service delivery
 
  -   Springboard
 
 
*   Maximising Opportunity for all
 
 
  -   Welfare to Work - employer status and partnership
 
  -   action for skills
 
  -   equal opportunities policy/Springboard
                              10
 
  -   public Hantsnet
 
  -   Work insight - work sampling for children looked after by
Social Services
 
  -   Work wise - supported employment for adults with learning
difficulties
 
  -   SOCS - self operated care scheme
 
*   Planning for prosperity
 
 
  -   Hampshire Structure Plan
 
  -   Economic Strategy - working in partnership to add value to
local business
 
    and investment initiatives and opportunities
 
  -   Lobbying nationally and in Europe on issues affecting
Hampshire people
 
    and businesses
 
  -   Responding to policy changes (i.e., RDAs, Welfare to Work etc)
 
  -   Supporting initiatives such as South East Region Investment
Limited
    and Hampshire Economic Partnership
 
 
*   Partnership
 
 
  -   Provision of care with independent sector, Health and
Districts (housing)
 
  -   Schools - education partnership
 
  -   Business and investment support through HEP
 
  -   Support for the arts
 
  -   Brussels office
 
 
*   Communications
 
 
  -   developing Communication Strategy
 
  -   Public Hantsnet
 
                              11
  -   Information Centres and LIPs
 
  -   World Wide Web
 
                              12
 
                                            APPENDIX 3.1
 
Synopsis of potential performance indicators recommended by the MCI
Groups.
 
EDUCATION FOR LIFE
 
Maximise access to   - Ratio of education places available to
educational          demand
opportunity          - Ratio of pupils in LEA schools to school
                     age
                        population
                     - Number of places taken by ethnicity, class,
                        geographical spread in ratio to community
                     composition
 
Provide high quality  - Exam results
educational service  - Key stage testing results
                     - Position in league tables
                     - Demand for services
                     - Number of complaints made and acted on
 
Fostering a          - Demand levels for higher education
commitment to        - Change in number of higher education/adult
education for life   education
                        courses offered in Hampshire
 
Improved road        - Road accident statistics
awareness
 
Encourage waste      - Levels of residual waste for disposal
minimisation/recycling - Levels of use of recycling centres
 
Healthy eating in    - Take-up of school meals
schools              - Changes in health statistics
 
Learning through     - Level of expenditure on environmental
landscapes           consequences of
                        vandalism
 
 
PROTECTING THE COMMUNITY
 
Number of injuries   - Measure trends annually and report
occurring on         conclusions as a
Hampshire's roads       percentage change over a moving five year
                     period
 
Maintenance of       - % damage to roads and pavements in need of
Highways                immediate attention, repaired or made safe
                     within 24
                        hours
 
Street lighting      - % measure of street lights not working as
                     planned
 
Vulnerable groups -  - Number of schools with a member of staff
                              13
children             with
 
                        nominated responsibility for road safety
                     - Number of injuries to school aged children
                     on
                        Hampshire's roads
 
Vulnerable groups -  - Number of pedestrian crossings having
those with impaired  facilities for
mobility                those with impaired mobility
 
Injury reduction at  - Measure success in % terms of injury saving
targeted sites       safety
                        schemes
 
Enforcement camera   - Number of accidents occurring at sites with
technology           camera
                        technology installed
 
Reducing youth crime - Number of young offenders and re-offenders
                     in
                        Hampshire
 
Pupil exclusion      - Number of permanent pupil exclusions from
                     Hampshire
                        schools
 
Crime 'hot spots'    - % change in crime levels in specified
                     'problem' areas
                     - Comparison of youth crime figures and
                     incidence of
                        reported crime and nuisance in target
                     areas
 
Truancy              - levels of truancy in Hampshire schools
 
 
CARING FOR THE ENVIRONMENT
 
Use of water         - Number of domestic consumers on water
                     meters
                     - Number of agricultural irrigation
                     reservoirs created
                     - % change in water abstracted from local
                     water courses
                     - Water consumption per capita
 
Quality of sea water  - Number of safe bathing beaches in Hampshire
for
bathing/recreational
purposes
 
Air quality          - Number of air pollutants for which local
                     air quality data
                        is available
                     - Extent of achievement of the air quality
                     standards
                        specified within the UK National Air
                     Quality Strategy
                        Document for local pollutants
                              14
                     - Number and extent of local pollution 'hot
                     spots'
 
 
Quality of built     - Numbers of archaeological sites and listed
environment          historical
                        buildings
                     - Number and range of small businesses and
                     retail outlets
                     - % change in the number of facilities
                     providing access
                        for people with physical disabilities or
                     sensory
                        impairment
                     - % change in the number of cycleways within
                        Hampshire
 
 
The unbuilt          - Amount of good quality agricultural by MAFF
environment             classification system
                     - Amount of waste going to landfill
                     - Level of recovery from household waste
 
Biodiversity         - Number of endangered species and habitats
                     in
                        Hampshire
                     - % change in total acreage of country parks,
                     nature
                        reserves and protected habitats
 
 
ACHIEVING ECONOMIC PROSPERITY THROUGH SUSTAINABLE DEVELOPMENT
 
Investment           - New industrial and offoce floorspace
                     - Regional trend in fixed capital investment
 
Number of jobs       - Net change in jobs by industrial sector
created
 
Volume of business   - Net change in value added by industrial
activity             sector
 
Availability of land  - Land availability statistics
for business
development
 
Number of enquiries  - Economic Development Unit enquiries
for possible inward
investment
 
Number of visitors   STB statistics
and amount of
expenditure at key
tourism venues
 
Training /           - Number of people trained
retraining / multi   - Level of achievement of Hampshire skills
skilling             targets
 
                              15
Unemployment trend
 
GDP (income) per
head trend
 
 
Employment           - Vacancies
opportunities
 
Purchasing power     - Comparison with other European regions
parity
 
 
PUBLIC INVOLVEMENT GROUP
 
Customer complaints  - % of complaints resolved within 5 days
procedures           - % of complaints resolved within 15 days
 
Customer suggestions - Number of customer suggestions made
                     - % acted on by Hampshire County Council
 
Service user survey  - Number of user surveys conducted by
                     Hampshire
                        County Council
                     - % of responses to user surveys received by
                     Hampshire
                        County Council
 
User                 - Number of user groups/forums/liaison
groups/forums/liaison  meetings held by
meetings                Hampshire County Council departments
 
Involvement of       - Number of people involved in Hampshire
people in management  County
processes               Council management boards, governing
                     bodies,
                        advisory boards etc. who are not
                     officially representing
                        Hampshire County Council
 
Public consultation  - Number of projects involving public
for specific         consultation
projects             - Number of people consulted
                     - % of responses received
 
Countywide           - Number of projects involving public
consultation for     consultation
strategic policy     - Number of people consulted
                     - % of responses received
 
Grant aid to local   - Total value of grant given as % of total
and voluntary        Hampshire
organisations/initiatives    County Council budget
 
Supporting local and  - Number of Hampshire County Council officers
voluntary            and
organisations           members serving on management
                     committees/boards
                        etc. of non-County Council Hampshire
                              16
                     organisations
 
Supporting community  - Number of community organisations receiving
aspirations          direct
                        advice and support from Hampshire County
                     Council
                        officers
 
 
 -----------------------------------------------------------------------------
 Material at this point in the source document was  considered to be in a form
 unsuitable for display in HANTSNET and STAIRS. Therefore it has been removed.
        Please contact the owner of the screen for further information.
 -----------------------------------------------------------------------------
                              21
                                               APPENDIX 4
 
 
Hampshire County Council                              Item
 
Policy and Resources Committee
 
22 December 1997
 
Short Term Objectives
 
Report of Chief Executive
 
Contact: Malcolm Cole, Ext: 7385
 
 
4.    Summary
 
 
5.2.  This report commences for Policy and Resources Committee a
      process of setting short term service objectives for the
      County Council set out by Committee responsibility.  It
      provides a draft set of short-term objectives which, when
      confirmed and developed by members, will provide the
      opportunity for Policy and Resources Committee to monitor the
      activities and progress of the Council across its whole range
      of functions.
 
 
5.3.  This report should be read in conjunction with the report on
      "Corporate Strategy - Next Steps - Meeting Needs" being
      considered by the Performance Review Sub-Committee on 15
      December.
 
 
6.    Background
 
 
6.1.  The Corporate Management Team invited all County Council
      departments to set out, for their activities, draft short-term
      objectives to be achieved during the period to 31 March 1999.
      These are now set out, by reference to Committees, in the
      Appendix to this report.  Each is annotated with reference to
      the County Council's corporate objective to which they
      contribute.
 
 
6.2.  This exercise has been commenced to enable Policy and
      Resources Committee and the Performance Review Sub-Committee
      to start the process, on a regular basis, of examining the
      County Council's ability to meet targets for its activity.  It
      is proposed, therefore, that this Committee examine objectives
      and their targets at six monthly intervals to check and note
      progress and set additional objectives for an extended
      timescale (i.e., in the first instance to six months beyond 31
      April 1999).
 
 
                              22
6.3.  It is now proposed that these should be referred to the next
      meetings of all County Council Committees, Sub-Committees and
      Panels for consideration by Members with the request that they
      consider, revise and expand, as necessary, those relating to
      their individual terms of reference.  As with the draft
      objectives set out in the Appendix, Members will be asked to
      consider whether to add to or amend the objectives to be
      achieved within existing policies and budgets and over the
      course, initially, of the period up to 31 March 1999.
 
 
6.4.  This initiative will also allow new Members of the County
      Council to become engaged in establishing their views on
      current service provision objectives.  It will also have the
      additional advantage of highlighting project work between and
      across departments thus contributing strongly to the corporate
      working of the County Council as a whole.
 
 
7.    Corporate Objectives
 
 
7.1.  As indicated above, as far as possible each of the short-term
      objectives has been set against one or more of the Council's
      current corporate objectives.  These five objectives are set
      out at the beginning of the Appendix.  They are now the
      subject of review by this Committee's Performance Review Sub-
      Committee.
 
 
8.    Conclusion
 
 
8.1.  The draft short-term objectives set out in the Appendix will
      now be submitted to all County Council Committees, Sub-
      Committees and Panels as indicated in paragraph 2.3 above.  It
      is suggested that, in order for this task to be manageable,
      the number of additional short-term objectives for each
      Committee should not exceed 12 (i.e., taking into account and
      including suggestions from Sub-Committees and Panels).  It is
      also suggested that following this meeting of Policy and
      Resources Committee the Appendix to this report be circulated
      to all Members of the County Council to enable them to
      consider this issue before its appearance on future Committee,
      Sub-Committee and Panel agendas.
 
 
8.2.  The results of this work will be referred to the Performance
      Review Sub-Committee for consideration before final reference
      to this Committee.
 
 
8.3.  It is hoped that members of Policy and Resources Committee
      will find the information and targets for County Council
      activity, produced in this way, useful in keeping track of the
      wide range of the Council's activity, but also a key tool in
      undertaking the Committee's task of monitoring the Council's
                              23
      policy and the use of its resources.  These activities - core
      to the achievement of the County Council's corporate
      objectives - can now be used as the basis for monitoring
      performance across the activity.
 
 
RECOMMENDATIONS
 
 
1. That the draft short-term objectives for the County Council
   prepared by the Corporate Management Team and set out in the
   Appendix to this report be referred to all County Council
   Committees, Sub-Committees for consideration as described in this
   report.
 
 
2. That the outcome of the consultation set out in Recommendation 1
   be considered by the Performance Review Sub-Committee with a view
   to the recommendations of that Sub-Committee being reported to
   Policy and Resources Committee for final approval.
 
 
3. That this Committee monitor and update these objectives on a six
   monthy basis.
 
                              24
 
                                                      APPENDIX
 
 
The Council's key corporate objectives are:
 
 
1. Developing the quality of life
 
 
2. Caring for the environment
 
 
3. Achieving economic prosperity through sustainable development
 
 
4. Encouraging participation in public affairs
 
 
5. Encouraging involvement in local communities.
 
 
The short-term objectives listed in this appendix are cross-
referenced as to which one or more of the corporate objectives they
support.
 
 
                              25
PLANNING AND TRANSPORTATION COMMITTEE
 
 
Short Term Objectives                      End Date for  Corporate
                                            Achievement  Objective
CORPORATE
 
Adopt revised Structure Plan               September     1,2,3,4
                                           1998
Promote major conference on Integrated     June 1998     1,2,3,5
Transport Policy and Urban Living
Review the Planning Permission at Efford   April 1998    1,2,3
(Pennington Landfill and mineral
extraction site) under the Habitats
Regulations and evaluate the future of the
site
Evaluate case for applying quality         October 1998
management systems throughout the
Environment Grouping
Preparation for CCT/Best Value - resolve   October 1998
form of tender and contract and approach
to services review
Develop the County Council's GIS           October 1998
capability to extend the range of
information in the system and make it more
widely available.
 
COUNTY SURVEYOR'S DEPARTMENT
 
Introduce public transport Quality         December 1998 1,2,3,5
Partnerships as part of area transport
strategies - interim stage
Consult and implement the Accessible       September     1,2,5
Transport Strategy                         1998
Review future role of the ROMANSE project  December 1998 1,2,3
team and the application of traffic
information and control systems as part of
the Integrated Transport Strategies
Develop Integrated Transport Strategies    March 1999    1,2,3
for all areas of Hampshire
Deposit Order with TWA for the provision   March 1998    1,2,3
of Stage 1 of South Hampshire Rapid
Transit (Fareham to Portsmouth)
Review new tourism signing policy          February 1998 2,3
Develop and introduce policy for the more  March 1998    1,2,5
cost effective use of Traffic Management
Resources
 
                              26
PLANNING AND TRANSPORTATION COMMITTEE cont......
 
 
Short Term Objectives                      End Date for  Corporate
                                            Achievement  Objective
COUNTY SURVEYOR'S DEPARTMENT cont...
 
Extend provision of street facilities for  March 1999    1
people with mobility handicaps (part of
continuing programme)
Extend partnership approach to             March 1999    3
arrangements with Contractors and
Consultants
 
COUNTY PLANNING DEPARTMENT
 
Adopt Minerals and Waste Local Plan        December 1998 1,2,3
Adopt Supplementary Planning Guidance for  April 1998    1,2,3
Town Centre and out-of-centre development
Publish draft Supplementary Planning       April 1998    1,2,3,4,5
Guidance for Commercial Leisure
developments
Publish Analysis of Housing Market in      June 1998     1,2,4
Hampshire
Publication of Volume 1 of Biodiversity    June 1998     1,2
Action Plan for Hampshire
Publish Draft Landscape Strategy           June 1998     1,2,4,5
 
                              27
 
RECREATION AND HERITAGE COMMITTEE
 
 
Short Term Objectives                      End Date for  Corporate
                                            Achievement  Objectives
ART SPORT COUNTRYSIDE AND COMMUNITY
 
Achieve full compliance with the Arts      March 1998    1
Council Lottery Stabilisation process such
that all specified payments from the
Lottery are received.
Submit a full application to the Arts      March 1998    1
Council of England for the Kings Theatre
and one Arts Centre
Achieve a new sponsorship deal for         April 1998    1
Entertainments in Village Halls scheme
Secure Lottery funding for the Museum of   March 1998    1
Modern Craft feasibility study
Investigate and promote strategies in      March 1998    1
respect of the provision for Hampshire
school children at present using the
unitary outdoor activity centres.  This
will include a review of opportunities
offered in the north and south east of
Hampshire and by the commercial, private
and voluntary sector
Review the system of consultation with     March 1999    1
Learning in Leisure providers on good
practice, strategy and policy matters by
December 1998- establish revised system by
March 1998 and report on its effectiveness
Attract and support up to four             March 1999    1
international sporting events in Hampshire
Produce business plans for the five        September     1
Hampshire Outdoor Centres and review the   1998
organisation of the outdoor service for
implementation
Review the strategy for the community      March 1999    3
service and increase the emphasis on
community development
Review cycling policies in the countryside March 1998    2
 
                              28
 
RECREATION AND HERITAGE COMMITTEE cont.....
 
 
Short Term Objectives                      End Date for  Corporate
                                            Achievement  Objectives
LIBRARIES
 
Extend the Galaxy circulation system to    December 1998 1
all libraries
Install on-line computer catalogue         June 1998     1
terminals (OPACS) in major libraries
Investigate, purchase and install a new    March 1999    1
ordering and cataloguing system
Prepare project appraisal for new library  March 1998    1
at Lymington
Prepare project appraisal for an extension March 1999    1
and major maintenance work at Romsey
Library
Launch the Naval Collection at Gosport     February 1998 1
Extend video collections to five more      December 1998 1
libraries
Improve Hatrics through electronic         March 1999    3
networking.  Research project to be
completed December 1997.  Implementation
1998-99
In accordance with new Department of       August 1998   1
Culture, Media and Sport requirement
prepare 3 year Library Plan
 
RECORD OFFICE
 
Prepare guides to holdings in the Record   March 1999    1, 5
Office relating to District Council areas
accessible on the Internet.  Commence with
guides for New Forest and Gosport
Report to the Policy and Resources         February 1999 1, 4
Committee on the management and retention
of the County Council's current and recent
records.  Subject to Committee's
agreement, provide public access to the
relevant records of the County Council
(except confidential records)
Launch Hampshire Archives Rescue Fund      March 1998    1
Prepare guide to Archives relating to      July 1998     1
France in the Record Office
 
                              29
RECREATION AND HERITAGE COMMITTEE cont.....
 
 
Short Term Objectives                      End Date for  Corporate
                                            Achievement  Objectives
RECORD OFFICE cont.....
 
In co-operation with the Library Service,  March 1999
initiate work on a Hampshire Bibliography,
adding pamphlets in private collections to
a data base
 
 
MUSEUMS SERVICE
 
Milestones: Hampshire's Living History     Phased        1, 3
Museum, Basingstoke.                       targets to
*  Leading as clients, in liaison with     April 2000
   Basingstoke and Deane Borough Council
   (BDBC) to requirements of County
   Architect, contractor and Heritage
   Lottery Fund
 
*  establish full revenue budget
   (development phase with BDBC)
 
*  revise and update the business plan and
   management regime and begin
   implementation
 
*  establish firm marketing plan leading
   to opening and begin implementation
 
*  prepare collections for use/display
 
*  advance preparation of supporting
   exhibits and IT
 
*  collections documentation
Establish clear project management         January 1998  1,2,3
structure and budget for Priddy's Hard     (Museum to
Museum with Gosport Borough Council and    open in 2000)
the Millennium Commission
 
                              30
 
RECREATION AND HERITAGE COMMITTEE cont.............
 
 
Short Term Objectives                      End Date for  Corporate
                                            Achievement  Objectives
MUSEUMS SERVICE cont.........
 
Establish on behalf of Policy and          April 1998    1,2,3
Resources Committee proposals for the use,
restoration and phased development of
Grange Farm in relation to Basing House.
Prepare initial application to Heritage
Lottery Fund
 Secure the future of M33 (HMS Minerva) in April 1998    1
dry dock and initiate de-salination of
structure as next stage of conservation
plan
Establish viable conservation proposals    January 1998  2
for the Bark Store, Botley and prepare
proposals for its use as a museum.
Develop SEARCH at Gosport, as a pre-       Ongoing       1
eminent centre for hands-on education and
training linked to history and natural
history, and seek to broaden its audience
base to include general visitors, people
with disabilities, reminiscence groups and
secondary schools.
To undertake, as a result of the           Phase 1 (of   1, 3
Marketing, Access and Education Audit, a   4) March 1998
networked programme of audience
development with twelve independent
museums
 
 
COUNTY PLANNING DEPARTMENT
 
Complete all management plans for key      October 1998  1,2,5
countryside sites
Publish draft Management Plan for River    April 1999    1,2,3,4,5
Hamble Harbour Authority
 
NB:  Future responsibility under consideration at Personnel Sub-
Committee 15 December 1997.
                              31
 
PUBLIC PROTECTION COMMITTEE
 
 
Short Term Objectives                      End Date for  Corporate
                                            Achievement  Objectives
WASTE DISPOSAL
 
Obtain County Council endorsement for      January 1998  1, 2
Project Integra study and issue final
directions for S W Hampshire and for
bringing forward recycling aspirations
Invite tenders and let contracts for       July 1998     1, 2
management of Household Waste Recycling
Centres
Complete feasibility study of major waste  June 1998     2, 3
minimisation initiatives funded from
landfill tax or EU funds
 
EMERGENCY PLANNING
 
Review the benefit derived from Hampshire  January 1998  2
County Council's 1997 oil pollution
response training programme, with a view
to its expansion in 1998/9, so that the
County's integrated response to a major
maritime oil spill is enhanced
To review and amend the Hampshire County   March 1998    2
and District Major Civil Emergency Plan to
reflect 'lessons learned' from the 1997
series of objective exercises
Examine the interfaces between the         March 1998    2
individual District Emergency Response
Plans and the County and District Major
Civil Emergency Plan to ensure
compatability
Assess the impact on County and District   March 1998    2
level authorities of the forthcoming Major
Accident Hazard Regulations to determine
the requirements to meet the terms of the
regulations
 
                              32
 
PUBLIC PROTECTION COMMITTEE cont.............
 
 
Short Term Objectives                      End Date for  Corporate
                                            Achievement  Objectives
REGULATORY SERVICES
 
Launch New Advice Service                  April 1998    1
Develop Business Advice Service            September     1, 3
                                           1998
Develop a Consumer Education package (in   September     1
conjunction with Education Department)     1998
 
YOUTH CRIME AND PUBLIC SAFETY
 
Establish working arrangements with        June 1998     1
police, Districts and other agencies to
produce, implement and monitor local
community safety plans under new statutory
duty to be imposed in the Crime and
Disorder Bill
Implement new statutory duty to be imposed June 1998     1
under Crime and Disorder Bill to provide
and co-ordinate services for youth justice
through Youth Offender Teams
 
                              33
 
POLICY AND RESOURCES COMMITTEE
 
 
Short Term Objectives                      End Date for  Corporate
                                            Achievement  Objectives
CHIEF EXECUTIVE
 
Prepare new County Council Corporate       May 1998
objectives
Develop a set of core Performance          May 1998
Indicators to underpin the Council's
Corporate Objectives incorporating the
work already undertaken within the
'Measuring Corporate Impact' exercise
Develop and implement communications       April 1998
strategy covering both internal and
external communication
To lead a co-ordinated approach to Best    March 1999
Value and formulate policies and
initiatives in preparation for the
implementation of Best Value in 2000
To ensure that Legal Services are fully    March 1998
prepared in complying with the statutory
requirement to subject the service to
Compulsory Competitive Tendering in 1999
 
COUNTY TREASURER'S DEPARTMENT
CORPORATE
 
Ensure financial systems are '2000 proof'  April 1999
or replaced
Position Financial Management system for   April 1999
Year 2000 and to prevent cost escalation
Assess impact on financial systems of Euro April 1999
Progress strategy for rebuilding our       Ongoing
capacity to have a significant locally
resourced capital programme including
public-private partnership issues
Review approach to funding of insurance    March 1998
and other risk exposures (linked to Risk
Management consultancy)
Complete and agree balance sheet           as soon as
apportionment with the Cities              possible
(transitional payments)
 
                              34
 
POLICY AND RESOURCES COMMITTEE cont.....
 
 
Short Term Objectives                      End Date for  Corporate
                                            Achievement  Objectives
COUNTY TREASURER cont.......
Evaluate the options for a new             April 1999
payroll/personnel system, to produce
improved management information and to
replace an obsolescent payroll system
Monitor payments performance closely in    ongoing
order to anticipate expected legislative
requirement for prompt payment
 
DEPARTMENTAL
 
Maintain external customer base and seek   ongoing
further efficiencies in service delivery
in order to ensure that County Treasurer's
Department budgets at and spends within
available resources
Manage the Student Grants Unit to maintain ongoing
a good service to students and minimise
the impact on staff as a result of the
Dearing proposals
Implement action plan to ensure Health and ongoing
Safety and stress issues are addressed
Evaluate the requirements for CCT for      June 1998
financial services (due January 2000) and
ensure the County Council is ready to meet
them as necessary
 
CHIEF PERSONNEL OFFICER
 
Implement Health and Safety Strategy in    December 1998
accordance with the plan
Implement H R strategy and standards       April 1999
Introduce new structure for personnel and  Personnel-
training                                   January 1998
                                           Training-
(Quarterly report to Personnel Sub-        subject to
Committee)                                 consultant's
                                           report
 
 
                              35
POLICY AND RESOURCES COMMITTEE cont.....
 
 
Short Term Objectives                      End Date for  Corporate
                                            Achievement  Objectives
CHIEF PERSONNEL OFFICER cont.......
 
Implement DDA Action Plan                  April 1999
Develop and implement Single Status        April 1999
strategy
Implement Compulsory Competitive           April 1999
Tendering/Best Value for personnel,
including time recording and benchmarking
Develop and implement corporate            July 1998
performance management system
Create employment framework for Welfare to July 1998
Work
Implement corporate strategy for IIP       December 1998
Develop a corporate training and
development strategy and obtain Institute
of Management accreditation for the
delivery of management programmes
Review early retirement policies in light  July 1998
of Audit Commission report
 
ECONOMIC DEVELOPMENT
 
Prepare, consult on, publish and           By April 1998 3
distribute an annual Medium Term Economic  and  April
Strategy                                   1999
Develop external sources of funding for    March 1999    3
the service itself, for the Council from
the business community, and for business
development (e.g. Konver).  Ten percent of
the gross expenditure of the Service to be
earned from external sources.
Develop and refine of the Hampshire        March 1999    3
Ambassadors scheme to improve
effectiveness.
 
 
                              36
POLICY AND RESOURCES COMMITTEE cont.....
 
 
Short Term Objectives                      End Date for  Corporate
                                            Achievement  Objectives
DIRECTOR OF PROPERTY, BUSINESS AND
REGULATORY SERVICES
 
Prepare, develop and implement a           December 1997
management plan to develop the Property    and then
function for CCT and to meet evolving Best quarterly to
Value framework                            October 1999
Establish and then meet the requirements   Annual
of a 3 year target and programme of land   programme.
disposals to maximise capital receipts for Reviewed each
the County Council                         year
Develop a policy and plan over the next    Policy by
two years to reduce significantly the      March 1998
County Council's reliance on leased or
rented office accommodation
Implement the Land Sub-Committee's policy  May 1999
for a complete land and property review,
service by service, across all committees
Implement a strategy for the development   January 1998  1, 2
and protection of Hilliers Arboretum,
including a management review of its
activities
Review the Health and Safety policies of   March
the County Council as Landlord in relation 1998/ongoing
to land and buildings
Review the property function in relation   May 1998
to the portfolio of services provided to
building users (i.e. including grounds
maintenance, cleaning, building
maintenance as well as the full range of
architectural services)
Review the County Council's Transport and  May 1998
Fleet Management operations to ensure the
development of relevant cost effective
services in line withe the requirements of
the County Council
 
                              37
 
POLICY AND RESOURCES COMMITTEE cont.....
 
 
Short Term Objectives                      End Date for  Corporate
                                            Achievement  Objectives
DIRECTOR OF PROPERTY, BUSINESS AND
REGULATORY SERVICES cont......
 
Develop a cost effective and relevant      By end
response for each of the County Council's  December 1998
DSO's in relation to CCT and/or Best Value
Review the opportunities to manage the     July 1998
volume of work undertaken by the County
Council's Printing Services business and
the potential to invest in new technology
Prepare and implement a Business Plan for  April 1998
the Supplies Function for 1998/99 with a
view to maximising economies in purchasing
and procuring goods and services for the
County Council
 
 
I T SERVICES
 
Reach a level in excess of 500,000         March 1999    1, 3, 4
visitors per annum to the Hampshire County
Council Web Site.
Reduce the unit cost of computing from     March 1999
1134 as at April 1997 to less than £650 in
real terms.
Produce and agree costed plans for a       October 1998
modern IT system with capability for the
twenty first century.
Maintain a significant volume of business  March 1999
with the two Cities in order to retain
economies of scale and keep costs low both
for the County Council and also for the
Cities.  Measure at March 1999 by the
existence of agreed contracts going beyond
March 1999
 
                              38
 
POLICY AND RESOURCES COMMITTEE cont.....
 
 
Short Term Objectives                      End Date for  Corporate
                                            Achievement  Objectives
I T SERVICES cont.......
 
Produce a full implementation of           October 1998  1
Assessment and Care Management System 2.
This target will contribute to increased
quality of care by Social Services; better
management control of the business
processes within Social Services; lower
administrative costs.  To be measured by
the extent to which the system is used.
To have a significant volume of financial  March 1999
transactions taking place through
Financial Management System 2, thus
avoiding otherwise inevitable cost
increases; achieving compliance with "year
2000"; providing higher quality system
that is quicker and easier to use.
 
 
                              39
SOCIAL SERVICES COMMITTEE
 
 
Short Term Objectives                      End Date for  Corporate
                                            Achievement  Objectives
Develop a care management approach for     March 1999    1
children's services to define processes
and groups to which care management is
applicable.
Review services for looked-after children  April 1998    1
and develop proposals for the future shape
of services for report to Children's
Service Sub-Committee.
Review children's sector business          April 1998    1
processes, report on care business process
and proposals for development systems.
Based on Misspent Youth, develop work with June 1998     1
juvenile offenders and draw up a crime
prevention strategy for report to Combined
Youth Justice Committee.
Establish the core business of County      January 1998  1
Council homes for older people, ensure we
continue to meet our legal obligations and
decide how closures should be dealt with,
if necessary.  Prepare review report with
recommendations on future role.
Review the role of the County Council's    April 1998    1
home care service in the domiciliary care
market.  Prepare report comparing costs
with independent sector and market
differences across the County.
Implement the Community Care (Direct       April 1998    1
Payments) Act 1996 with the two options
(including SOCS) agreed by Social Services
Committee and extend to people with a
learning disability
Develop a strategy for services for        June 1998     1
deaf/blind people.  Report to Adults
Services Sub-Committee.
Review and, if necessary, re-shape in the  September     1
light of resource contraints day services  1998
for people with a learning disability.
Report to Adults Services Sub-Committee.
Work with health authorities to ensure the June 1998     1
effective development of multi-
disciplinary Community Mental Health
Teams.
Prepare a budget strategy for three years  January 1998  1
starting 1998/99 for report to Resources
Sub-Committee.
Improve the management of income,          April 1998    1
minimising debt write-off
 
                              40
 
SOCIAL SERVICES COMMITTEE cont............
 
 
Short Term Objectives                      End Date for  Corporate
                                            Achievement  Objectives
Review services provided jointly with      June 1998     1
Portsmouth and Southampton, and the cross-
boundary purchasing of services, to ensure
the best deal for the County Council.
Improve the quality of telephone systems   March 1999    1
which support Area operations, providing a
better service to the public and better
value for money
Start to introduce other new technologies  March 1999    1
to reduce the dependence of fieldwork
staff on office bases and
make savings in Area office accommodation
Prepare a plan with targets for            March 1998    1
relinquishing high cost, leased Area
office accommodation
Make further improvements in the           March 1998    1
management of health and safety, ensuring
that we do not slip back from the position
attained when audited by the Health and
Safety Executive.  Revise Action Plan.
Develop approaches to workload management, June 1998     1
and bring in other measures, to combat the
growing problem of work-related stress and
reduce sickness absence.  Report on
initiatives to Resources Sub-Committee.
Prepare proposals for changes to           March 1998    1
conditions of service to feed into
corporate negotiations on single status
Implement a new performance management     April 1998    1
strategy, including a system of annual
performance appraisal
 
                              41
 
EDUCATION COMMITTEE
 
Short Term Objective                      End Date for  Corporate
                                           Achievement  Objectives
Promoting Schools Effectiveness and
Continuous Improvement
 
Develop a county-wide strategy which      July 1998     1, 5
supports and monitors all schools in
their improvement and focuses energy on
those needing most improvement
Support heads and governors in planning   January 1999  1, 5
for improvement by providing effective
management information and support which
enables schools to challenge performance
Support teachers and subject leaders in   December 1998 1, 4, 5
improving pupils' levels of achievement
Support teachers and headteachers in                    1, 4, 5
their professional development
 
Developing and Supporting Individual
Children and Young People
 
Develop provision for children in their   January 1998  1
early years
Develop strategies to protect children    March 1999    1,2,3,5
and extend opportunities during school
and out of school activities
Develop opportunities for young people    September     1, 4, 5
outside the school system                 1998
 
Optimise the use of Resources, Focusing
Resources on School Effectiveness
 
Maximise funding opportunities for        March 1999    1, 5
schools and other facilities used by
pupils and the community
Within the strategy set out in the        December 1998 1, 5
special educational needs policy
statement, develop the effective use of
resources to meet the needs of children
with special educational needs
Ensure information systems are accurate,  February 1998
up to date, relevant and accessible
 
 
                              42
EDUCATION COMMITTEE cont.......
 
Short Term Objective                      End Date for  Corporate
                                           Achievement  Objectives
Initiating and Developing Relationships
 
Develop relationships with schools,       April 1998    1, 5
governors, headteachers, parents,
dioceses, trade unions and voluntary
organisations
Develop effective networks with district  March 1999    1
councils, unitary authorities and other
public sector agencies to ensure co-
ordinated education services planning
under the new local government structure
 
Encouraging and Developing the
Department's Staff to Enable them to
Contribute Effectively to all its Work
 
Develop an ethos which promotes           October 1997  5
innovation and development opportunities  and annual
Prepare a plan with targets for           /September    1
relinquishing high cost, leased office    1999
accommodation
 
 
NB:  The objectives set out above were drafted before the White
Paper "Excellence in Schools" and the SEN Green Paper were
published. Therefore the short-term objectives may be refined in
line with the published Education Development Plan, which contains
the detailed action in support of the above objectives.
 
 
MC652
 
                              43

Up: Top of this page       Home: Hantsweb Homepage