Current and approved harbour works

Copyright

You must read and agree the copyright information below before you access application information.

Plans, drawings and material submitted to the River Hamble Harbour Authority are protected by the Copyright Acts (Section 47, 1988 Act). You may only use material which is downloaded and/or printed for consultation purposes. You must not make further copies without the prior permission of the copyright owner.

The River Hamble Harbour Authority is unable to supply hard copies of plans and drawings, but you may view these at our office by prior arrangement. If hard copies are required we can request them from the applicant on your behalf, but you are likely to be charged for these.

By opening links to application details you are confirming you have read and agreed to abide by the terms of this notice

Application Description Status Dates relevant to application process Expected construction date
Premier Marinas Limited


“Swanwick Marina Redevelopment”. (N.B a variation to the existing Consent).

Location: SO31 1ZL
NGR: SU492094

The wider project is the redevelopment of Swanwick Marina, which is consented through various River Hamble Harbour Authority Consents approved between July 2007 and September 2013.

This variation application seeks to approve a slight modification to the layout of the pontoons from that consented to better accommodate the site’s vessel demographic and improve access to berths. The proposed variation is a minor change within the existing area and so does not increase the footprint of the site.

Further information and comparison is covered in the accompanying briefing note; MP269.7-FN-01 – Summary of Changes for Harbour Works Consent.

Project Details:
  • Drawing - Existing, Consented and Proposed Layouts
  • Briefing Note - Summary of layout changes for variation approval.
Application under way See how to comment.

Deadline for written comments: 1 February 2018*

It is anticipated that the application will be discussed at the Management Committee meeting 9 March 2018, and determined at the Harbour Board meeting 6 April 2018.

2 phases - Winter 2018 and Winter 2019.
Marina Developments Limited - proposed pier extension Location: Hamble Point Marina, Hamble SO31 4NB This work at Hamble Point Marina is planned to extend five of the main piers to allow installation of one additional finger on each side of these piers, creating four extra berths per pier. New floating pontoon walkway sections and finger pontoons will be installed in line with existing infrastructure. Some of the walkway sections and fingers will need additional piles to ensure stability, and some existing piles will be relocated to ensure the piers remain stable. This project will not require any dredging.

Project details:
Project Detail & Method Statement
Supporting Information
Plans

Approved n/a 2018
YMCA Fairthorne Manor - proposed pontoon

Location: SO30 2GH, NGR:SU518 119 
Project details:
Pontoon plan
Project description
Location plan and photos
Approved n/a 2018
Swanwick Marina redevelopment Various consents approved between July 2007 to September 2013 Approved n/a Underway