Archived decisions
Hampshire County Council New Forest Highway Management Advisory Panel 11 March 2003 Street Lighting Programmes 2002/03 and 2003/04 Report of the Director of Environment |
Item 7 |
Contact: Tony Stephens, ext 6938
1. Summary
1.1 This report covers:
(i) Street Lighting Maintenance Contract;
(ii) Column Replacement Programmes 2002/03 and 2003/04;
(iii) Energy Contract;
(iv) Community Safety Initiative 2002/03 and 2003/04; and
(v) Street Lighting Policy.
2. Street Lighting Maintenance Contract
2.1 The Street Lighting Maintenance Contract continues to provide a high percentage of 'lights on' across the county. There are still some administrative issues to be resolved by the contractor, including completion of the supply of specialist vehicles.
2.2 In addition the contractor is considering administrative changes which it is hoped will reduce overheads and ensure the consolidation of Southern Electric Contracting's lighting services within the county.
3. Column Replacement Programmes 2002/03 and 2003/04
3.1 The column replacement programme was instigated some 10 years ago to counter the problem of decaying street lighting columns. Initially, this was a problem with concrete columns, but it became apparent that steel columns were also corroding - some from within - and there was an urgent need to start a programme of replacement.
3.2 In 1997 a programme of detailed visual and tactile structural inspection was introduced as part of the cyclic maintenance programme. Since then the information gleaned from those inspections has been used to plan and prioritise the annual programme. Now the recording of these inspections is initially being transcribed onto the Street Lighting Information Management System computer database to provide a more easily accessible stream of information. This will also be supplemented by a system of electronic testing when a suitable inexpensive system becomes available. In 2003/04 the budget for this work will, subject to confirmation, be £1.2 million. Funding of this magnitude will maintain momentum towards a 50 year column replacement cycle but additional funding will be required if this target is to be achieved.
3.3 This aspect of the county-wide maintenance contract generally is working well and, whilst there has been some overall slippage, the 2002/03 programme should be completed by the end of March 2003.
3.4 The following replacement lighting schemes are scheduled in the New Forest area for the year 2002/03, all of which should be completed by the end of March 2003:
(i) Howards Mead, Pennington;
(ii) Efford Way, Pennington;
(iii) Ramley Road, Pennington;
(iv) Conifer Crescent, Pennington;
(v) Forward Drive, Pennington;
(vi) Lentune Way, Pennington;
(vii) South Street, Pennington;
(viii) Pennington Close, Pennington;
(ix) Harford Close, Pennington;
(x) Kings Crescent, Lymington;
(xi) Bays Road, Lymington;
(xii) Rowans Park, Lymington;
(xiii) Meadowlands, Lymington;
(xiv) Osborne Road, New Milton;
(xv) Pleasance Way, New Milton;
(xvi) Meadow Road, New Milton;
(xvii) Willowdene Close, New Milton;
(xviii) Rosewood Gardens, New Milton;
(xix) Marryat Road, New Milton;
(xx) Oak Road, New Milton; and
(xxi) Hazelwood Avenue, New Milton.
3.5 During 2003/04 street lighting in the following roads is, subject to confirmation, scheduled to be replaced:
(i) Beech Crescent, Hythe;
(ii) Water Lane, Hythe; and
(iii) Hounsdown Close, Totton.
4. Energy Contract
4.1 The energy contract continues to operate in a satisfactory manner. A problem of underpayment due to inventory summary problems at Scottish and Southern Energy will be resolved by the end of February.
4.2 Discussions with the Local Authority Central Buying Consortium will recommence in mid-summer to consider the form of a new supply contract for April 2004, when the possibility of increasing the `green' energy content of this contract will be considered.
5. Community Safety Initiative 2002/03 and 2003/04
5.1 The programme for 2002/03 for this popular partnership initiative has now been completed. Additional street lights have been erected in the following roads:
(i) Wainsford Road/Howards Mead footpath, Lymington;
(ii) Fontwell Close, Totton;
(iii) Portal Road/Tedder Way, Totton; and
(iv) Southampton Road, Hythe.
5.2 Letters requesting bids for the forthcoming financial year have been sent out, with the anticipation of a further programme of value £120,000 county-wide for 2003/04.
6. Street Lighting Policy
6.1 Following a service review in 1999, the County Council revised its street lighting policy, which was confirmed by the Executive Member for Environment in early 2002. The document has now been published and engineering and planning departments of local authorities throughout Hampshire will be sent copies, which should assist them in dealing with planning applications. The aim is to reduce the effects of light pollution, light trespass and energy wastage. Further copies of the Policy Document will be supplied by the Lighting Section on request.
Recommendation
That this report be noted.
Section 100 D - Local Government Act 1972 - background papers | |
The following documents disclose facts or matters on which this report, or an important part of it, is based and has been relied upon to a material extent in the preparation of this report. | |
NB the list excludes: | |
1. |
Published works. |
2. |
Documents which disclose exempt or confidential information as defined in the Act. |
TITLE |
LOCATION |
None. |
7766/ALS