1. Summary
1.1 This report considers the traffic management programme for 2003/04 to be undertaken by Fareham Borough Council.
2. Introduction
2.1 The Traffic Regulation Order (TRO) and Traffic Investigation (TI) Programmes are approved by Fareham Borough Council Executive after consultation with County Council officers. The programmes for 2003/04 were approved in January.
3. Traffic Regulation Orders
3.1 It is expected that funding will remain at £12,000 for routine TROs in 2003/04. Based on current resource levels, approximately 12 Orders can be implemented each year, one normally being the next phase of the agreed programme for introducing `No Parking on Grass Verges'. These sites are set out in Appendix 1. It is anticipated that a number of the sites can be grouped together to form a `Various Roads' Order.
4. Traffic Investigations
4.1 Funding is released by the County Council for specific schemes through the Hampshire Local Transport Plan (LTP) (year 2), and some of this has been deferred to year 3. Funding has also been released from developer contributions.
4.2 District Councils have been asked to continue providing assistance to deliver schemes from the LTP programme. These schemes have therefore been included in Fareham's programme at the expense of the normal programme of traffic investigations where funding is less certain.
4.3 Schemes included on the 2002/03 list are still ongoing. In view of the position regarding LTP funding and the ongoing nature of existing schemes, the 2003/04 traffic investigation programme includes ongoing schemes from 2002/03, as set out in Appendix 2. When these schemes have been completed, investigations and schemes will be drawn from the supplementary schedule of schemes and traffic investigations pool list shown in Appendix 3.
Recommendation
That this report be noted.
Section 100 D - Local Government Act 1972 - background papers | |
The following documents disclose facts or matters on which this report, or an important part of it, is based and has been relied upon to a material extent in the preparation of this report. | |
NB the list excludes: | |
1. |
Published works. |
2. |
Documents which disclose exempt or confidential information as defined in the Act. |
TITLE |
LOCATION |
None. |
7865/AV
APPENDIX 1
LIST OF TRAFFIC REGULATION ORDERS
County Interest |
Site |
Ward |
Comment |
Geoffrey Crescent |
Fareham East |
Request for waiting restrictions referred from Overview Panel | |
Cuckoo Lane |
Hill Head |
Waiting restrictions to assist school crossing patrol at southern end | |
Old Turnpike (south end) and Serpentine Road |
Fareham East |
Additional waiting restrictions due to high level of on-street parking | |
Yes |
Brook Lane |
Park Gate Locks Heath |
Review 40 mph speed limit to complement County Council traffic calming scheme |
Yes |
Brook Lane |
Park Gate |
Request for weight limit to supplement and be implemented in tandem with proposed County Council traffic calming scheme |
Western Way (lay-by) |
Fareham E |
Request for waiting restrictions to enable access for lorries, buses and coaches | |
Duncan Road/ Lower Duncan Road |
Park Gate |
Request for waiting restrictions | |
Beaconsfield Road |
Fareham South |
Request to investigate on-street parking. No access for emergency and refuse vehicles | |
Stubbington Green |
Stubbington |
Extension of waiting restrictions to maintain delivery access to shops | |
Yes |
Peak Lane |
Stubbington |
Closure of old highway to vehicular traffic to prevent fly tipping |
Southampton Hill |
Titchfield |
Request for waiting restrictions | |
Salterns Lane |
Fareham East |
As above | |
Yes |
Bus Stop Clearways |
Borough |
To coordinate with County Council programmes |
APPENDIX 2
PROGRAMME OF SCHEMES AND TRAFFIC INVESTIGATIONS 2003/04
(COMPLETED AND PROGRESSING)
SCHEME TITLE |
JUSTIFICATION/ SOURCE OF FUNDING |
DETAILS |
PROGRESS | |
1 |
Wickham Road / North Hill - Safety investigation including ' U-turning' north of motorway |
Investigation into personal injury accidents and problems associated with U-turns on A32. |
Safety investigation of junctions with a view to recommending improvements |
County interest road. Some works carried out by County Council Safety Team. Additional measures to be discussed further with County Council. |
2 |
Hill Road and Station Road, Portchester - Traffic calming and priority working under railway bridge |
The former Highways and Transportation Sub-Committee instructed the initiation of a scheme. Developer funded |
Design and supervision of traffic calming scheme including priority working beneath bridge - subject to trial. |
Design completed. County Council project appraisal completed. Work commenced February 2003. |
3 |
Newgate Lane/Tukes Avenue Cycleway |
LTP bid scheme ref. 58. Developer funding and LTP funding available. Design work has commenced at the request of County Council. LTP Urban Centre project |
Project management, design and construction of cycleway scheme. |
Design completed. Agreement reached with Asda and MoD on land dedication. The Council's legal department is currently drawing up a contract. Gosport Borough Council have confirmed that the stretch of land in the Council's ownership can be dedicated for highway purposes. Planning approval required. |
4 |
Common Lane and Coach Hill, Titchfield Traffic Calming |
Funded from Local Transport Plan capital programme 2002/3 |
Design and supervision of traffic calming scheme |
Design complete Preliminary Safety Audit complete. Public consultation undertaken 10th December 2002. |
5 |
Miller Drive, Fareham Traffic calming and on-road cycle lanes |
As above |
Design and supervision of traffic calming and on-road cycle lanes |
Works substantially completed Feb 2003. |
6 |
Park Lane, Fareham Traffic calming |
As above |
Design and supervision of traffic calming scheme |
Preliminary design being drawn up following consultation with Ward Members. Programmed to commence June 2003. |
7 |
Town Centre signing |
As above |
Design and supervision of comprehensive signing scheme for Fareham Town Centre |
Project appraisal completed. Works programmed March. |
APPENDIX 3
SUPPLEMENTARY SCHEDULE OF SCHEMES AND TRAFFIC INVESTIGATIONS
POOL LIST
(Schemes will be drawn from this list to be progressed on a project management basis as resources permit)