1. Summary

1.1 This report covers the following issues:

      (i) Traffic Regulation Order Programme;

      (ii) Bridge Works Programme 2002/03;

      (iii) Intelligent Transport Systems Programme 2002/03;

      (iv) South East Hampshire Transport Strategy Scheme Report;

      (v) Regeneration of Older Urban Areas Programme; and

      (vi) Development Related Works.

2. Traffic Regulation Order Programme

2.1 The traffic regulation order programme for 2002/03 is nearing completion. An update is given in Appendix 1. The prioritisation of the 2003/04 programme is still to be agreed.

2.2 Works continue on the phased upgrading and renewal of advanced directional signs and other signs within Gosport. Works have been completed along a section of the A32 this year.

3. The Bridgeworks Programme 2002/03 and 2003/04

3.1 There are no major bridge schemes programmed within Gosport, but liaison is ongoing between the Bridge Group and the South Hampshire Rapid Transit (SHRT) team concerning the existing and proposed structures on SHRT Phase 1: Fareham-Gosport-Portsmouth. There are also feasibility studies proposed for Ann's Hill and Alver bridges.

      Ann's Hill Bridge

3.2 This bridge carries Ann's Hill Road over the disused railway line, which will be used by SHRT in 2007. The visual appearance is poor, with notable deterioration of the precast concrete fence panels and evidence of rotation of the piers. The condition is being monitored to ensure safety and a programme for repair/replacement is now being investigated.

3.3 Approximately 10% of the panels were replaced in 1992/93 at a cost of £40,000, giving a pro-rata estimate of £500,000 to £600,000. Repairs will be phased over several years, as it is unlikely that sufficient funds will be available to complete the whole of the works in one financial year.

      Alver Bridge, Alverstoke

3.4 This bridge is substandard in accordance with current assessment standards with respect to load carrying capacity, and the existing reinforced concrete is showing corrosion and spalling. The most economical solution in the long term is replacement, and it is intended to start the feasibility study this financial year.

4. Intelligent Transport Systems Group Programme

4.1 Works identified within the Intelligent Transport Systems Capital Programme in Gosport for 2002/03 are:

      (i) Privett Road/Browndown Road - works to upgrade cycle crossing to Toucan have been completed;

      (ii) Cherque Farm - new traffic signals north junction (developer funded) are substantially complete;

      (iii) Bury Road/Ann's Hill Road - the refurbishment of existing signals is substantially complete. Options to provide pedestrian crossing facilities are the subject to further investigations and will be the subject of consultation when complete; and

      (iv) closed circuit television (CCTV) links to the Traffic and Travel Information Centre in Winchester to improve traffic monitoring and information are likely to take place in the near future.

4.2 Works within the 2003/04 programme are:

      (i) Frater Gate traffic signals (developer funded); and

      (ii) Mumby Road/Weevil Lane traffic signals (developer funded).

5. South East Hampshire Transport Strategy Scheme Report

5.1 The 2002/03 and 2003/04 programme of South East Hampshire Transport Strategy schemes included within the Local Transport Plan is set out in Appendix 2.

6. Regeneration of Older Urban Areas Programme

      Trinity Green Phase 2

6.1 Works are substantially complete to re-kerb and repair footways adjacent to Holy Trinity Vicarage, and on walls and railings to the north side of the churchyard. Addastone surface dressing to complete the footway works are programmed for March, weather permitting.

      Stoke Road Phase 4

6.2 Included in this phase are works to complete the upgrading of footways in the conservation area between Peel Road and Elmhurst Road. Works are programmed to start on-site in March 2003. SRB funding of an additional £25,500 has been secured for the scheme. Designs for Christ Church and the United Reform Church frontage (west end of Stoke Road) are being progressed and specialist lighting contractors are advising on a floodlighting scheme for the tower of the Methodist Church. In addition, discussions are now underway with landowners at the east end of Stoke Road to identify potential improvements to enhance this area.

7. Development Related Works

      Frater Gate

7.1 Work has commenced to redevelop the former Ministry of Defence site and reconstruction of the existing road, Aerodrome Road, to bring up to adoption standard, is underway.

7.2 Works within the A32 are required to enable utility connections for the site, local highway widening and the installation of revised traffic signal layout and controls.

      Cherque Farm Link Road

7.3 Works are currently ongoing to construct the first phase of the Link Road, including the north junction with Broom Way. This includes the realignment of Shoot Lane and a new signalised junction on Broom Way. Work is now substantially complete on this junction and traffic lights are programmed to be operational in March.

      Royal Clarence Yard

7.4 Refurbishment of the two existing barrack blocks is progressing together with the new residential development close to the Forton Lake Opening Bridge. The reconstruction of substantial parts of Weevil Lane is in progress to bring the road up to adoption standard. The detailed design of the Weevil Lane/Mumby Road junction is being progressed by the developers in consultation with the County Council.

Recommendation

That this report be noted.

Section 100 D - Local Government Act 1972 - background papers

The following documents disclose facts or matters on which this report, or an important part of it, is based and has been relied upon to a material extent in the preparation of this report.

NB the list excludes:

1.

Published works.

2.

Documents which disclose exempt or confidential information as defined in the Act.

TITLE

LOCATION

None.

7884/CL

APPENDIX 1

ONGOING TRAFFIC REGULATION ORDERS (17.2.03)

I.D. No.

LOCATION

REMARKS

247

Cambridge Road, Lee

Dropped due to Residents' Objections

249/265

Sedgeley Grove/Rydal Road

Advertising 18.2.03 - 11.3.03

264/243

Priory Road/Quay Lane

Residents Consultation 6.2.03-20.2.03

276

Magennis Close

Implemented 19.12.02

296

St Thomas's Road

Formal objection received - report to ward cllrs required

297

Priory Road (New Development)

Implemented 23.1.03

307

Milvil Road/Victoria Square

Implemented 9.1.03

315

Haslar Road

Implemented 21.11.02

316

Elmore Road/Portsmouth Road

Due to be advertised

NB All proposals are waiting restrictions

    Informal consultation is carried out with residents prior to advertising

This supersedes previous (9.10.02)

APPENDIX 2

South East Hampshire Transport Strategy

Capital Programme 2002/03 as at March 2003

Scheme

Estimated Cost

£'000s

Details, Comment

Lee-on-the Solent - Browndown cycle route

240

Off-road cycle provision. Safer Routes to School benefits. Commenced in 2001/02 and is now complete.

Gosport Bus Station

100

Passenger information, CCTV, improved comfort, access and waiting facilities (includes 2001/02 funding), completion due in March 2003.

Lee-on-the-Solent Sustainable Suburbs

50

Local improvements to assist pedestrians and improve environment in town centre, related to Civic Trust Initiative. Preliminary design commenced and consultations undertaken with Ward Councillors. Following Capital Programme Review the implementation is now deferred to at least 2004/2005.

Lee-on-the-Solent Sustainable Suburbs -CCTV

45

Funding in support of the Civic Trust Initiative and Gosport's Crime Reduction Programme to provide coverage of the High Street and the Marine Parade including the bus stops. Complete.

Newgate Lane - Tukes Avenue cycle route

70

External Funding (EF) Shared pedestrian/cycle route. Design finalised. Land dedication has been approved by Gosport Borough Council. Planning consent required and implementation expected in 2003/2004

Broom Way cycle path

250

EF Scheme within Fareham. Funding from Cherque Farm development. Safer Routes to School benefits. Design in progress with a view to implementation in 2003/2004.

Anglesea Gardens cycle path

20

Safer Routes to School scheme. Shared pedestrian/cycle route. Planning consent has been obtained and detailed design is about to commence to enable construction this spring..

Leesland Park cycle path

12

Shared pedestrian cycle route linking Lavinia Road to St Andrews Road. Completed.

Browndown Road/Privett Road Toucan crossing

20