1. Summary

1.1 This report outlines:

      (i) Progress with the 2002/03 Highways Maintenance Programme.

      (ii) Details of the 2003/04 Highways Maintenance budget.

      (iii) Details of the 2003/04 Highways Maintenance Programme.

2. Background

2.1 Members will be aware from previous Panel meetings that the highways maintenance programme is funded from both revenue and capital allocations.

2.2 The revenue maintenance programme funds minor works, such as pothole repairs, routine drainage work including gully cleaning, signs and road markings, environmental maintenance of grass verges, trees and shrubs, weed control and highway emergencies. Minor bridge works and winter maintenance are also funded from revenue. Budget allocations are set at a level that ensures the safety of the highway network.

2.3 The capital maintenance programme funds planned maintenance, including special maintenance, resurfacing and surface dressing, and also provides for essential repairs to the structure of the highway.

3. Progress with the 2002/03 Highways Maintenance Programme

    Revenue Maintenance Programme

3.1 The total allocation for East Hampshire for 2002/03 is £498,000. Progress throughout the year has been in line with the spend profile and it is expected that the programme will be completed within time and budget constraints. A budget monitoring statement is set out in Appendix 1.

    Capital Maintenance Programme

3.2 The total allocation for 2002/03 is £1,458,000. The programme is nearing completion and, as with the revenue maintenance programme, it is expected to be delivered as planned within time and budget constraints. A budget monitoring statement is included in Appendix 1.

3.3 A status report detailing progress of all special maintenance, resurfacing, surface dressing and externally funded Government Office for the South East (GOSE) drainage schemes is attached as Appendix 2.

4. 2003/04 Highways Maintenance Budget

4.1 The highways maintenance budget for 2003/04 approved by the Executive Member for Environment is £46,492,000. This sum comprises £18,768,000 revenue funding and £27,724,000 funding from the capital programme provision.

4.2 The revenue budget allocation, which provides funding for routine and emergency maintenance, has been maintained at a similar level to 2002/03. This will ensure that the safety of the highway network is preserved .

4.3 The capital budget allocation has been increased substantially compared with 2002/03. Central Government funding achieved through the Local Transport Plan (LTP) process has increased and locally resourced capital funding has also been enhanced. It should be noted that maintenance funding allocated through the LTP process is directly related to the condition of Hampshire's road network and future levels of funding are dependent on Hampshire's ability to improve the overall condition of the network. This increased allocation for planned maintenance has provided the opportunity to target funding at the more vulnerable areas of the network, essentially urban footways and rural unclassified roads.

4.4 Urban footways have been targeted to maintain accessibility and improve standards in the heavily used areas, reducing the potential for claims. The rural unclassified road network was severely damaged as a result of the flooding in 2000/01 and requires a sustained, enhanced level of funding to recover. The additional funding will allow an increased number of Highways Assessment of Maintenance Priorities (HAMP) identified schemes to be undertaken and allow the opportunity to introduce some haunch recycling schemes. Recycling reuses the materials on site, is quicker than traditional methods of reconstruction and is economical.

4.5 Despite this additional funding the need, based on HAMP intervention levels, has risen this year. It is therefore envisaged that these increased levels of funding will need to be sustained to achieve the aims of the Government, to halt the deterioration of the network by 2004 and eliminate the backlog by 2010.

4.6 To reflect the condition of the footway network in Hampshire, user concerns and the deteriorating condition of the rural unclassified lanes, an additional £3.5 million of funding has been specifically allocated by the County Council to these areas of need for 2003/04. Of this funding, £2.5 million will be allocated to footway works and £1 million to maintenance of the rural unclassified network. This funding will help to reduce the maintenance backlog and is detailed in Appendix 3.

5. 2003/04 Highways Maintenance Programme

      Revenue Maintenance Programme

5.1 The revenue maintenance programme funds three main areas of highway maintenance:

      (i) reactionary minor repair works on the road and footway network;

      (ii) minor traffic management improvements of signs and road markings; and

      (iii) environmental aspects of highway maintenance, including grass cutting, weed treatment and tree and shrub maintenance.

5.2 The total allocation for East Hampshire for 2003/04 is £619,000. Details of the 2003/04 revenue budget are set out in Appendix 3.

5.3 Additional revenue budgets are held centrally for the performance elements of the County Council's term maintenance contract. The performance based work contained in the contract includes:

      (i) gully emptying;

      (ii) visibility splay grass cutting;

      (iii) winter maintenance; and

      (iv) ordinary bridge maintenance.

    Capital Maintenance Programme

5.4 The funding allocation for the capital maintenance programme is based on the HAMP rating system and will reflect the agreed intervention levels. The HAMP rating intervention levels direct funding to those maintenance schemes displaying a higher `maintenance need'. Therefore, the funding allocation for the 2003/04 capital maintenance programme will differ from the 2002/03 allocation. The capital allocation is set out in Appendix 3.

5.5 Planned structural maintenance repairs undertaken through the capital maintenance programme include surface dressing, special maintenance and resurfacing schemes. A provisional list of planned maintenance schemes under each of these headings for 2003/04 is attached as Appendix 4 (all programmes are indicative and may be subject to amendment).

5.6 The capital maintenance programme also supports the centrally controlled areas of work, including major maintenance schemes and bridge maintenance.

Recommendation

That this report be noted.

Section 100 D - Local Government Act 1972 - background papers

The following documents disclose facts or matters on which this report, or an important part of it, is based and has been relied upon to a material extent in the preparation of this report.

NB the list excludes:

1.

Published works.

2.

Documents which disclose exempt or confidential information as defined in the Act.

TITLE

LOCATION

None

7757/MR

APPENDIX 1

HAMPSHIRE HIGHWAYS EAST HAMPSHIRE

Revenue Budget 2002/03

2002/03

Allocation

Projected Outturn

Routine Maintenance (carriageway, footway repairs)

£272,000

£328,000

Gully Cleansing

£27,000

£58,000

Aids to Movement (lines and signs)

£44,000

£26,000

Traffic Management TROs

£5,000

£5,000

Environmental (grass, trees, shrubs)

£66,000

£66,000

Weed Control

£33,000

£33,000

Hazard Clearance

£51,000

£71,000

Total:

£498,000

£587,000

Capital Budget 2002/03 Principal Roads

Principal Roads Routine Structural Repairs

£44,000

£44,000

Principal Roads Special Maintenance

£35,000

£35,000

Principal Roads Resurfacing

£60,000

£60,000

Total:

£139,000

£139,000

GOSE Flooding Remedial Budget

Flood Remedial Works Total:

£382,000

£360,000

Capital Budget 2002/03 Non Principal Roads

Non Principal Roads Routine Structural Repairs

£378,000

£378,000

Non Principal Roads Special Maintenance

£549,000

£588,000

Non Principal Roads Tactile Paving Crossing Points

£10,000

£10,000

Total:

£937,000

£976,000

Total Maintenance Budget Allocation East Hampshire

£1,956,000

£2,062,000

APPENDIX 2

HAMPSHIRE HIGHWAYS EAST HAMPSHIRE

2002 - 2003 SPECIAL MAINTENANCE

RESURFACING AND SURFACE DRESSING PROGRAMME

SPECIAL MAINTENANCE PROGRAMME

Anstey Lane Alton

drainage

D

5,000

Bulls Copse Lane Horndean

reconstruct c/w

P

75,000

College Close Rowlands Castle

footway

C

45,000

Cradle Lane Binsted

reconstruct c/w

C

15,000

Drift Road Clanfield

footway

C

54,000

Forest Road Liss Forest

footway

P

30,000

Grenehurst Way Petersfield

footway

C

22,000

Hurlands Lane Headley

haunch

C

45,000

King George Avenue Petersfield

reconstruct c/w

C

60,000

Longmoor Road Greatham

footway

C

9,000

Lower Froyle Lane Shalden

haunch

P

85,000

Rake Road Liss

drainage

P

60,000

Ramsdean Lane Stroud

verge

C

10,000

Sickles Lane Kingsley

haunch

C

25,000

Stafford Road Petersfield

footway

P

18,000

The Curve Lovedean

footway

C

25,000

RESURFACING PROGRAMME

Newmans Lane Froxfield

footway

C

35,000

CAPITAL SM PROGRAMME

A272 Winchester Road Langrish

footway

35,000

CAPITAL RESURFACING PROGRAMME

A339 Basingstoke Road Alton

haunch & r/s

60,000

GOSE FLOODING REMEDIAL FUNDS

Brightstone Lane Farringdon

drainage

P

70,000

Brook Lane Hawkley

resurface

C

25,000

Conford Ford

resurface

deferred

15,000

High Street Medstead

resurface

C

20,000

Laydean Lane Froxfield

resurface

C

40,000

London Road Horndean

drainage

P

80,000

Noar Hill Common Road Froxfield

resurface

C

10,000

Ridge Top Lane Froxfield

resurface

C

22,000

Tulls Lane Standford

resurface

deferred

5,000

Wellhouse Road Beech

resurface

deferred

11,000

Whitmore Vale Grayshott

resurface

C

37,000

Woodberry Lane Rowlands Castle

drainage

P

25,000

SURFACE DRESSING MINOR ROADS - GROUP 3

C96 Barley Farm Lane Farringdon

Completed

U227 Chawton Park Road Alton

Completed

U230 Eveley Close Whitehill

Completed

U232 Forest Lane Close Liphook

Completed

U231 Forest Road Bordon

Completed

C215 Hall Lane Farringdon

Completed

U228 Hook Lane Ropley

Completed

C96 Mill Court Lane Binsted

Completed

U211 Newfield Road Liss Forest

Completed

U231 Perry Way Headley

Completed

U231 Pinehill Road Bordon

Completed

U212 Pratts Lane Steep Marsh

Completed

U231 Taylors Close Lindford

Completed

U211 The Green Liss

Completed

U227 West End Lane Medstead

Completed

SURFACE DRESSING HIGH PERFORMANCE

Midhurst Road Petersfield A272

Completed

£95,000

Petersfield Road Whitehill A325

Completed

£21,500

FOOTWAY SURFACE DRESSING

Bordon Area

Completed

APPENDIX 3

   

2003/04

 
       

Revenue Budget 2003/04

     

Routine Maintenance (carriageway, footway repairs)

 

£304,000

 

Gully Cleansing

 

£26,000

 

Aids to Movement ( signs and road markings )

 

£54,000

 

Environmental ( grass, trees, shrubs )

 

£76,000

Inc. £10K rural f/ways

District Managed Grass

Weed Control

 

£94,000

£35,000

 

Hazard Clearance

 

£30,000

 

Total

 

£619,000

 
       
       
       

Capital Budget 2003/04

Principal Roads

   

Principal Roads Routine Structural Repairs

 

£42,000

 

Principal Roads Special Maintenance

 

£126,000

 

Principal Roads Resurfacing

 

£0

 

Total

 

£168,000

 
       

Capital Budget 2003/04

Non-Principal Roads

   

Additional Funding

Non-Principal Roads Routine Structural Repairs

 

£374,000

 

Non-Principal Roads Special Maintenance

 

£750,000

 

Non-Principal Roads Resurfacing

 

£643,000

 

Footway Maintenance

   

£98,000

Haunch, Resurfacing and Recycling

   

£336,000

Non-Principal Roads Tactile Paving Crossing Points

 

£7,000

 

Total

 

£1,774,000

£434,000

Total Maintenance Budget Allocation for East Hants

£2,561,000

£434,000

APPENDIX 4

HAMPSHIRE HIGHWAYS EAST HAMPSHIRE

2003 - 2004 PROVISIONAL SPECIAL MAINTENANCE

RESURFACING AND SURFACE DRESSING PROGRAMME

SPECIAL MAINTENANCE PROGRAMME

Downhouse Road Clanfield

Haunch

£93,000

214

London Road Clanfield

Haunch

£88,000

202

Weekgreen Farm Lane Froxfield

Haunch

£34,000

170

Greenway Lane Buriton

Haunch

£68,000

155

The Causeway Petersfield

Haunch

£27,000

148

High Cross Lane Froxfield

Haunch

£67,000

140

Stodham Lane Liss

Haunch

£30,000

130

Kimbers Petersfield

Footway

£28,000

129

Plain Farm Lane East Tisted

Haunch

£30,000

127

Pruetts Lane Liss

Haunch

£29,000

125

Standford Lane Standford

Footway

£38,000

125

Swelling Hill Ropley

Haunch

£18,000

122

Forest Road Liss

Haunch

£43,000

118

Five Ash Road Medstead

Haunch

£28,000

112

Wishanger Lane Headley

Haunch

£11,000

110

Laydean Farm Lane Froxfield

Havant

£45,000

101

Frogmore Lane Horndean

Haunch

£36,000

99

Reeds Lane, Liss

Haunch

£37,000

95

NON PRINCIPAL ROADS - RESURFACING PROGRAMME

Coombe Wood Lane East Meon

resurface

£36,000

170

Ashford Lane Steep

resurface

£68,000

165

Frogmore East Meon

resurface

£45,000

165

Crossways Lane Grayshott

resurface

£18,000

156

Coombe Lane East Meon

resurface

£180,000

155

Gid Lane Upper Froyle

resurface

£23,000

150

Glebe Fields Bentworth

resurface

£11,000

142

Hammer Lane Churt

resurface

£30,000

130

Yarnhams Farm Lane Upper Froyle

resurface

£31,000

126

Burgh Hill Passfield

resurface

£18,000

120

Upper Soldridge Lane Medstead

resurface

£44,000

119

School Lane Grayshott

resurface

£6,000

110

Beech Hanger Road Grayshott

resurface

£48,000

110

Bradshott Lane Selborne

resurface

£27,000

110

Smugglers Lane Ropley

resurface

£45,000

100

Butts Road Alton

resurface

£14,000

97

CAPITAL SM PROGRAMME

A31 Winchester Road Four Marks

Drainage

15,000

A32 Fareham Road Tisted

Haunch

28,000

A32 Fareham Road Tisted

Drainage

26,000

A31 Farnham Road Bentley

Drainage

22,000

A31 Winchester Road Ropley

Drainage

35,000

SURFACE DRESSING MINOR ROADS - GROUP 3

Borovere Lane Alton U230

Butts Road Alton U227

Claypit Lane Froxfield U214

Court Lane Ropley U228

Darvill Road Ropley U228

Glebe Fields Bentworth U227

Kings Road Alton U227

Partridge Green Alton U 229

Rookswood Alton U229

South Town Road Medstead C36

Tanhouse Lane Alton U227

The Ridgeway Alton U230

Upper Soldridge Road Alton U227

Windmill Fields Four Marks U227

Woodfield Kingsley U229

SURFACE DRESSING HIGH PERFORMANCE - GROUP 2

Alton By-pass A31

Basingstoke Road Alton A339

Beech Hill Headley Down B3002

Fareham Road at West Meon Hut A32

Fullers Vale Headley B3002

High Cross Lane Froxfield C120

London Road Sheet B2070

-

Rake Road Liss C86

ADDITIONAL FOOTWAY SCHEMES*

Lower Mead Footpath, Petersfield

3E2008

Footway

Repair

£10,000

99

Meadowlands, Rowlands Castle

300036

Resurface Footway

£13,000

99

Rookswood Footpath, Alton

3E2001

Resurface Footway

£5,000

95

Dunsells Lane, Ropley

300045

Resurface Footway

£11,000

94

London Road, Clanfield

310001

Resurface Footway

£22,000

93

Mill Road, Liss

310009

Resurface Footway

£11,000

87

High Street, Alton

Resurface Footway

£26,000

ADDITIONAL HAUNCH/RECYCLE SCHEMES*

Hampshire highways east have secured an additional £560,000 for a haunch recycling programme for the rural unclassified network for the 2003/04 programme. This funding will be used to undertake schemes on the East Hampshire and Winchester rural road network.

At the time of the production of the report a programme of sites was being prepared. It is likely that the funding will be approximately split between Winchester and East Hampshire £224,000 and £336,000 respectively.