Hampshire County Council East Hampshire Highway Management Advisory Panel 18 March 2003 Highways Maintenance Programmes 2002/03 and 2003/04 Report of the Director of Environment |
Item 6 |
Contact: Michael Rolfe, tel 01730 266411
1. Summary
1.1 This report outlines:
(i) Progress with the 2002/03 Highways Maintenance Programme.
(ii) Details of the 2003/04 Highways Maintenance budget.
(iii) Details of the 2003/04 Highways Maintenance Programme.
2. Background
2.1 Members will be aware from previous Panel meetings that the highways maintenance programme is funded from both revenue and capital allocations.
2.2 The revenue maintenance programme funds minor works, such as pothole repairs, routine drainage work including gully cleaning, signs and road markings, environmental maintenance of grass verges, trees and shrubs, weed control and highway emergencies. Minor bridge works and winter maintenance are also funded from revenue. Budget allocations are set at a level that ensures the safety of the highway network.
2.3 The capital maintenance programme funds planned maintenance, including special maintenance, resurfacing and surface dressing, and also provides for essential repairs to the structure of the highway.
3. Progress with the 2002/03 Highways Maintenance Programme
Revenue Maintenance Programme
3.1 The total allocation for East Hampshire for 2002/03 is £498,000. Progress throughout the year has been in line with the spend profile and it is expected that the programme will be completed within time and budget constraints. A budget monitoring statement is set out in Appendix 1.
Capital Maintenance Programme
3.2 The total allocation for 2002/03 is £1,458,000. The programme is nearing completion and, as with the revenue maintenance programme, it is expected to be delivered as planned within time and budget constraints. A budget monitoring statement is included in Appendix 1.
3.3 A status report detailing progress of all special maintenance, resurfacing, surface dressing and externally funded Government Office for the South East (GOSE) drainage schemes is attached as Appendix 2.
4. 2003/04 Highways Maintenance Budget
4.1 The highways maintenance budget for 2003/04 approved by the Executive Member for Environment is £46,492,000. This sum comprises £18,768,000 revenue funding and £27,724,000 funding from the capital programme provision.
4.2 The revenue budget allocation, which provides funding for routine and emergency maintenance, has been maintained at a similar level to 2002/03. This will ensure that the safety of the highway network is preserved .
4.3 The capital budget allocation has been increased substantially compared with 2002/03. Central Government funding achieved through the Local Transport Plan (LTP) process has increased and locally resourced capital funding has also been enhanced. It should be noted that maintenance funding allocated through the LTP process is directly related to the condition of Hampshire's road network and future levels of funding are dependent on Hampshire's ability to improve the overall condition of the network. This increased allocation for planned maintenance has provided the opportunity to target funding at the more vulnerable areas of the network, essentially urban footways and rural unclassified roads.
4.4 Urban footways have been targeted to maintain accessibility and improve standards in the heavily used areas, reducing the potential for claims. The rural unclassified road network was severely damaged as a result of the flooding in 2000/01 and requires a sustained, enhanced level of funding to recover. The additional funding will allow an increased number of Highways Assessment of Maintenance Priorities (HAMP) identified schemes to be undertaken and allow the opportunity to introduce some haunch recycling schemes. Recycling reuses the materials on site, is quicker than traditional methods of reconstruction and is economical.
4.5 Despite this additional funding the need, based on HAMP intervention levels, has risen this year. It is therefore envisaged that these increased levels of funding will need to be sustained to achieve the aims of the Government, to halt the deterioration of the network by 2004 and eliminate the backlog by 2010.
4.6 To reflect the condition of the footway network in Hampshire, user concerns and the deteriorating condition of the rural unclassified lanes, an additional £3.5 million of funding has been specifically allocated by the County Council to these areas of need for 2003/04. Of this funding, £2.5 million will be allocated to footway works and £1 million to maintenance of the rural unclassified network. This funding will help to reduce the maintenance backlog and is detailed in Appendix 3.
5. 2003/04 Highways Maintenance Programme
Revenue Maintenance Programme
5.1 The revenue maintenance programme funds three main areas of highway maintenance:
(i) reactionary minor repair works on the road and footway network;
(ii) minor traffic management improvements of signs and road markings; and
(iii) environmental aspects of highway maintenance, including grass cutting, weed treatment and tree and shrub maintenance.
5.2 The total allocation for East Hampshire for 2003/04 is £619,000. Details of the 2003/04 revenue budget are set out in Appendix 3.
5.3 Additional revenue budgets are held centrally for the performance elements of the County Council's term maintenance contract. The performance based work contained in the contract includes:
(i) gully emptying;
(ii) visibility splay grass cutting;
(iii) winter maintenance; and
(iv) ordinary bridge maintenance.
Capital Maintenance Programme
5.4 The funding allocation for the capital maintenance programme is based on the HAMP rating system and will reflect the agreed intervention levels. The HAMP rating intervention levels direct funding to those maintenance schemes displaying a higher `maintenance need'. Therefore, the funding allocation for the 2003/04 capital maintenance programme will differ from the 2002/03 allocation. The capital allocation is set out in Appendix 3.
5.5 Planned structural maintenance repairs undertaken through the capital maintenance programme include surface dressing, special maintenance and resurfacing schemes. A provisional list of planned maintenance schemes under each of these headings for 2003/04 is attached as Appendix 4 (all programmes are indicative and may be subject to amendment).
5.6 The capital maintenance programme also supports the centrally controlled areas of work, including major maintenance schemes and bridge maintenance.
Recommendation
That this report be noted.
Section 100 D - Local Government Act 1972 - background papers | |
The following documents disclose facts or matters on which this report, or an important part of it, is based and has been relied upon to a material extent in the preparation of this report. | |
NB the list excludes: | |
1. |
Published works. |
2. |
Documents which disclose exempt or confidential information as defined in the Act. |
TITLE |
LOCATION |
None |
7757/MR
APPENDIX 1
HAMPSHIRE HIGHWAYS EAST HAMPSHIRE
Revenue Budget 2002/03 |
2002/03 Allocation |
Projected Outturn |
Routine Maintenance (carriageway, footway repairs) |
£272,000 |
£328,000 |
Gully Cleansing |
£27,000 |
£58,000 |
Aids to Movement (lines and signs) |
£44,000 |
£26,000 |
Traffic Management TROs |
£5,000 |
£5,000 |
Environmental (grass, trees, shrubs) |
£66,000 |
£66,000 |
Weed Control |
£33,000 |
£33,000 |
Hazard Clearance |
£51,000 |
£71,000 |
Total: |
£498,000 |
£587,000 |
Capital Budget 2002/03 Principal Roads |
||
Principal Roads Routine Structural Repairs |
£44,000 |
£44,000 |
Principal Roads Special Maintenance |
£35,000 |
£35,000 |
Principal Roads Resurfacing |
£60,000 |
£60,000 |
Total: |
£139,000 |
£139,000 |
GOSE Flooding Remedial Budget Flood Remedial Works Total: |
£382,000 |
£360,000 |
Capital Budget 2002/03 Non Principal Roads |
||
Non Principal Roads Routine Structural Repairs |
£378,000 |
£378,000 |
Non Principal Roads Special Maintenance |
£549,000 |
£588,000 |
Non Principal Roads Tactile Paving Crossing Points |
£10,000 |
£10,000 |
Total: |
£937,000 |
£976,000 |
Total Maintenance Budget Allocation East Hampshire |
£1,956,000 |
£2,062,000 |
APPENDIX 2
HAMPSHIRE HIGHWAYS EAST HAMPSHIRE
2002 - 2003 SPECIAL MAINTENANCE
RESURFACING AND SURFACE DRESSING PROGRAMME
SPECIAL MAINTENANCE PROGRAMME
Anstey Lane Alton |
drainage |
D |
5,000 |
Bulls Copse Lane Horndean |
reconstruct c/w |
P |
75,000 |
College Close Rowlands Castle |
footway |
C |
45,000 |
Cradle Lane Binsted |
reconstruct c/w |
C |
15,000 |
Drift Road Clanfield |
footway |
C |
54,000 |
Forest Road Liss Forest |
footway |
P |
30,000 |
Grenehurst Way Petersfield |
footway |
C |
22,000 |
Hurlands Lane Headley |
haunch |
C |
45,000 |
King George Avenue Petersfield |
reconstruct c/w |
C |
60,000 |
Longmoor Road Greatham |
footway |
C |
9,000 |
Lower Froyle Lane Shalden |
haunch |
P |
85,000 |
Rake Road Liss |
drainage |
P |
60,000 |
Ramsdean Lane Stroud |
verge |
C |
10,000 |
Sickles Lane Kingsley |
haunch |
C |
25,000 |
Stafford Road Petersfield |
footway |
P |
18,000 |
The Curve Lovedean |
footway |
C |
25,000 |
RESURFACING PROGRAMME
Newmans Lane Froxfield |
footway |
C |
35,000 |
CAPITAL SM PROGRAMME
A272 Winchester Road Langrish |
footway |
35,000 |
CAPITAL RESURFACING PROGRAMME
A339 Basingstoke Road Alton |
haunch & r/s |
60,000 |
GOSE FLOODING REMEDIAL FUNDS
Brightstone Lane Farringdon |
drainage |
P |
70,000 |
Brook Lane Hawkley |
resurface |
C |
25,000 |
Conford Ford |
resurface |
deferred |
15,000 |
High Street Medstead |
resurface |
C |
20,000 |
Laydean Lane Froxfield |
resurface |
C |
40,000 |
London Road Horndean |
drainage |
P |
80,000 |
Noar Hill Common Road Froxfield |
resurface |
C |
10,000 |
Ridge Top Lane Froxfield |
resurface |
C |
22,000 |
Tulls Lane Standford |
resurface |
deferred |
5,000 |
Wellhouse Road Beech |
resurface |
deferred |
11,000 |
Whitmore Vale Grayshott |
resurface |
C |
37,000 |
Woodberry Lane Rowlands Castle |
drainage |
P |
25,000 |
SURFACE DRESSING MINOR ROADS - GROUP 3
C96 Barley Farm Lane Farringdon |
Completed |
||
U227 Chawton Park Road Alton |
Completed |
||
U230 Eveley Close Whitehill |
Completed |
||
U232 Forest Lane Close Liphook |
Completed |
||
U231 Forest Road Bordon |
Completed |
||
C215 Hall Lane Farringdon |
Completed |
||
U228 Hook Lane Ropley |
Completed |
||
C96 Mill Court Lane Binsted |
Completed |
||
U211 Newfield Road Liss Forest |
Completed |
||
U231 Perry Way Headley |
Completed |
||
U231 Pinehill Road Bordon |
Completed |
||
U212 Pratts Lane Steep Marsh |
Completed |
||
U231 Taylors Close Lindford |
Completed |
||
U211 The Green Liss |
Completed |
||
U227 West End Lane Medstead |
Completed |
SURFACE DRESSING HIGH PERFORMANCE
Midhurst Road Petersfield A272 |
Completed |
£95,000 | |
Petersfield Road Whitehill A325 |
Completed |
£21,500 |
FOOTWAY SURFACE DRESSING
Bordon Area |
Completed |
||
APPENDIX 3
2003/04 |
|||
Revenue Budget 2003/04 |
|||
Routine Maintenance (carriageway, footway repairs) |
£304,000 |
||
Gully Cleansing |
£26,000 |
||
Aids to Movement ( signs and road markings ) |
£54,000 |
||
Environmental ( grass, trees, shrubs ) |
£76,000 |
Inc. £10K rural f/ways | |
District Managed Grass Weed Control |
£94,000 £35,000 |
||
Hazard Clearance |
£30,000 |
||
Total |
£619,000 |
||
Capital Budget 2003/04 Principal Roads |
|||
Principal Roads Routine Structural Repairs |
£42,000 |
||
Principal Roads Special Maintenance |
£126,000 |
||
Principal Roads Resurfacing |
£0 |
||
Total |
£168,000 |
||
Capital Budget 2003/04 Non-Principal Roads |
Additional Funding | ||
Non-Principal Roads Routine Structural Repairs |
£374,000 |
||
Non-Principal Roads Special Maintenance |
£750,000 |
||
Non-Principal Roads Resurfacing |
£643,000 |
||
Footway Maintenance |
£98,000 | ||
Haunch, Resurfacing and Recycling |
£336,000 | ||
Non-Principal Roads Tactile Paving Crossing Points |
£7,000 |
||
Total |
£1,774,000 |
£434,000 | |
Total Maintenance Budget Allocation for East Hants |
£2,561,000 |
£434,000 | |
APPENDIX 4
HAMPSHIRE HIGHWAYS EAST HAMPSHIRE
2003 - 2004 PROVISIONAL SPECIAL MAINTENANCE
RESURFACING AND SURFACE DRESSING PROGRAMME
SPECIAL MAINTENANCE PROGRAMME
Downhouse Road Clanfield |
Haunch |
£93,000 |
214 |
London Road Clanfield |
Haunch |
£88,000 |
202 |
Weekgreen Farm Lane Froxfield |
Haunch |
£34,000 |
170 |
Greenway Lane Buriton |
Haunch |
£68,000 |
155 |
The Causeway Petersfield |
Haunch |
£27,000 |
148 |
High Cross Lane Froxfield |
Haunch |
£67,000 |
140 |
Stodham Lane Liss |
Haunch |
£30,000 |
130 |
Kimbers Petersfield |
Footway |
£28,000 |
129 |
Plain Farm Lane East Tisted |
Haunch |
£30,000 |
127 |
Pruetts Lane Liss |
Haunch |
£29,000 |
125 |
Standford Lane Standford |
Footway |
£38,000 |
125 |
Swelling Hill Ropley |
Haunch |
£18,000 |
122 |
Forest Road Liss |
Haunch |
£43,000 |
118 |
Five Ash Road Medstead |
Haunch |
£28,000 |
112 |
Wishanger Lane Headley |
Haunch |
£11,000 |
110 |
Laydean Farm Lane Froxfield |
Havant |
£45,000 |
101 |
Frogmore Lane Horndean |
Haunch |
£36,000 |
99 |
Reeds Lane, Liss |
Haunch |
£37,000 |
95 |
NON PRINCIPAL ROADS - RESURFACING PROGRAMME
Coombe Wood Lane East Meon |
resurface |
£36,000 |
170 |
Ashford Lane Steep |
resurface |
£68,000 |
165 |
Frogmore East Meon |
resurface |
£45,000 |
165 |
Crossways Lane Grayshott |
resurface |
£18,000 |
156 |
Coombe Lane East Meon |
resurface |
£180,000 |
155 |
Gid Lane Upper Froyle |
resurface |
£23,000 |
150 |
Glebe Fields Bentworth |
resurface |
£11,000 |
142 |
Hammer Lane Churt |
resurface |
£30,000 |
130 |
Yarnhams Farm Lane Upper Froyle |
resurface |
£31,000 |
126 |
Burgh Hill Passfield |
resurface |
£18,000 |
120 |
Upper Soldridge Lane Medstead |
resurface |
£44,000 |
119 |
School Lane Grayshott |
resurface |
£6,000 |
110 |
Beech Hanger Road Grayshott |
resurface |
£48,000 |
110 |
Bradshott Lane Selborne |
resurface |
£27,000 |
110 |
Smugglers Lane Ropley |
resurface |
£45,000 |
100 |
Butts Road Alton |
resurface |
£14,000 |
97 |
CAPITAL SM PROGRAMME
A31 Winchester Road Four Marks |
Drainage |
|
15,000 |
A32 Fareham Road Tisted |
Haunch |
|
28,000 |
A32 Fareham Road Tisted |
Drainage |
26,000 | |
A31 Farnham Road Bentley |
Drainage |
22,000 | |
A31 Winchester Road Ropley |
Drainage |
35,000 |
SURFACE DRESSING MINOR ROADS - GROUP 3
Borovere Lane Alton U230 |
|||
Butts Road Alton U227 |
|||
Claypit Lane Froxfield U214 |
|||
Court Lane Ropley U228 |
|||
Darvill Road Ropley U228 |
|||
Glebe Fields Bentworth U227 |
|||
Kings Road Alton U227 |
|||
Partridge Green Alton U 229 |
|||
Rookswood Alton U229 |
|||
South Town Road Medstead C36 |
|||
Tanhouse Lane Alton U227 |
|||
The Ridgeway Alton U230 |
|||
Upper Soldridge Road Alton U227 |
|||
Windmill Fields Four Marks U227 |
|||
Woodfield Kingsley U229 |
SURFACE DRESSING HIGH PERFORMANCE - GROUP 2
Alton By-pass A31 |
|||
Basingstoke Road Alton A339 |
|||
Beech Hill Headley Down B3002 |
|||
Fareham Road at West Meon Hut A32 |
|||
Fullers Vale Headley B3002 |
|||
High Cross Lane Froxfield C120 |
|||
London Road Sheet B2070 - |
|||
Rake Road Liss C86 |
ADDITIONAL FOOTWAY SCHEMES*
Lower Mead Footpath, Petersfield 3E2008 |
Footway Repair |
£10,000 |
99 |
Meadowlands, Rowlands Castle 300036 |
Resurface Footway |
£13,000 |
99 |
Rookswood Footpath, Alton 3E2001 |
Resurface Footway |
£5,000 |
95 |
Dunsells Lane, Ropley 300045 |
Resurface Footway |
£11,000 |
94 |
London Road, Clanfield 310001 |
Resurface Footway |
£22,000 |
93 |
Mill Road, Liss 310009 |
Resurface Footway |
£11,000 |
87 |
High Street, Alton |
Resurface Footway |
£26,000 |
ADDITIONAL HAUNCH/RECYCLE SCHEMES*
Hampshire highways east have secured an additional £560,000 for a haunch recycling programme for the rural unclassified network for the 2003/04 programme. This funding will be used to undertake schemes on the East Hampshire and Winchester rural road network.
At the time of the production of the report a programme of sites was being prepared. It is likely that the funding will be approximately split between Winchester and East Hampshire £224,000 and £336,000 respectively.