1. Summary
1.1 This report provides an update on the delivery of the Local Transport Plan (LTP) and the content of Hampshire County Council's third Annual Progress Report (APR) submitted to the Government Office for the South East (GOSE) and the Department for Transport (DfT) on 31 July 2003.
2. Background
2.1 The APR is the chief mechanism for reporting back to Central Government on how the LTP is being implemented, showing progress made in working towards national and local objectives and targets. However, as an authority graded excellent under the Comprehensive Performance Assessment (CPA), Hampshire County Council is no longer required to produce an APR. Nevertheless, it was considered that, as some of the information contained in the APR is still required by Government, it was appropriate to produce the document, otherwise there was a risk that this information could be misinterpreted or taken out of context. Furthermore, it is good professional practice to produce an annual report on delivery, which also has considerable value as a means of reporting progress in delivering the County Council's Integrated Transport Strategy to partners and other key stakeholders.
2.2 The APR has therefore been written broadly to follow the criteria set out in the DfT guidance, although using the CPA freedoms the County Council has been granted in relation to the format of the document. In particular, it was considered that, for a county the size and complexity of Hampshire, the progress that has been made over the past year could not be adequately portrayed in a 30 page report, as recommended in the DfT guidance. Nevertheless the APR is focused on the key issues, and in order to keep it as concise as possible much use has been made of appendices.
3. Annual Progress Report 2003
3.1 The APR document highlights the substantial progress which has been made. The year 2002/03 was exceptional in terms of programme delivery for integrated transport in the county, with total integrated transport investment of £22.7 million, including £7 million in support of bus travel, £2 million on casualty reduction schemes, £4 million on cycling and walking and £800,000 on safer routes to schools. Substantial investment in highways maintenance and bridges was also reported. Including the completion of the flood damage remedial programme, a total of £23.5 million of capital funding was spent in 2002/03 from credit approvals and the County Council's own resources.
3.2 Key schemes highlighted in the APR that were undertaken during 2002/03 were:
(i) completion of Stage 1 of the A3 bus priority corridor in Havant;
(ii) increasing investment in bus quality partnerships and passenger information systems;
(iii) a further 76 improvements at accident sites produced by the `low cost' schemes safety programme;
(iv) improvements at Winchester rail station for bus integration and pedestrian access;
(v) the introduction of direct local rail services to Eastleigh and Southampton from May 2003 at Chandlers Ford from developer and County Council investment;
(vi) a personalised journey planning project (DfT sponsored) under way with four employers in Winchester; and
(vii) the start of main contract works on the A325 Route 1 bus priority project and maintenance scheme in the Blackwater Valley.
3.3 A dedicated chapter of the APR highlights the County Council's approach to working in partnership with other authorities, key stakeholders and the community, developing new initiatives to promote new services and changes in travel behaviour. The Solent Transport partnership was formally launched in the year and one section of the APR has been written jointly between the three highway authorities (Hampshire, Portsmouth and Southampton).
3.4 A high level of importance continues to be placed on monitoring delivery of the programme and progress towards achieving the objectives and targets included in the LTP, together with the indicators that are used to assess this. The APR provides detail of progress against Core Performance Indicators, Public Service Agreement targets and the County Council's own headline targets, full details of which are included in the attached appendix. The County Council remains on target with respect to its performance indicators in highway maintenance improvements and casualty reduction. Whilst it is anticipated that the slight decrease in bus patronage experienced in 2002 will be addressed by the individualised marketing initiatives proposed for 2003/04, monitoring information on cycling and walking suggests that the former is continuing to fall and the latter is rising.
3.5 In addition to the comprehensive assessment of progress being made towards the county-wide objectives and targets, a similar approach has been adopted for each of the area transport strategies. All indicators have been measured where possible and the objectives are consistent across each strategy area as far as practicable. However, recognition of the diverse nature of Hampshire's urban and rural areas is acknowledged and therefore the actual targets and objectives vary from area to area to reflect this. Although it is still early in delivering the projects in the LTP, the majority of indicators remain on target and monitoring will continue throughout the LTP period. Full details of the revised targets and progress to date are included in the appendices produced to support the APR.
3.6 The appendices also include a significant amount of detail on the progress and impact of schemes in each of the strategy areas, and an indication of how each one contributes to the County Council's corporate objectives and the LTP policy areas. Tables also show how the impact of each scheme is being considered in formulating changes and amendments to future years' programmes, to ensure that the outputs delivered contribute to outcomes in terms of modal choice or changes in travel behaviour. The close links each project has with the County Council's corporate objectives and overall policy aims is clearly demonstrated. The benefits of each scheme often go far wider than their immediate impact and, added together, the extensive programme has a positive benefit over a wide range of areas.
3.7 The APR also includes three bids for supplementary funding covering MIRACLES, managing the accidental obstruction of the railway by road vehicles, and schemes related to the detrunking of the A339.
3.8 GOSE and the DfT are now considering the APR, with a formal response expected in December. At that time the indicative allocations for funding in 2004/05 will be confirmed and comments made on the APR document itself and the progress made in delivering the capital programme.
Recommendation
That the performance on transport improvements as set out in the report on the Local Transport Plan Annual Progress Report and how the County Council is performing in relation to meeting its objectives and targets be noted.
Section 100 D - Local Government Act 1972 - background papers | |
The following documents disclose facts or matters on which this report, or an important part of it, is based and have been relied upon to a material extent in the preparation of this report. | |
NB the list excludes: | |
1. |
Published works. |
2. |
Documents which disclose exempt or confidential information as defined in the Act. |
TITLE |
LOCATION |
None. |
8215/KT
APPENDIX
Progress towards Targets Core Performance Indicators
Core Indicator |
Units/Definitions |
Baseline position |
Most recent position |
Target |
LA view on progress |
Source of data | |||
Year |
Data |
Year |
Data |
Year |
Data | ||||
Road Condition (% where structural maintenance should be considered) |
Principal roads - BV 96 by deflectograph |
2000/01 |
9% |
2002/03 |
9.4% |
2003/04 |
9.2% |
Early days but appears on course |
Deflectograph |
Principal roads - BV 96 by CVI |
2001/02 |
0.6 |
2002/03 |
9.38% |
2003/04 |
9.38% |
Methodology change makes comparison difficult. |
Coarse Visual Inspection | |
Non-principal classified roads - BV97a |
2001/02 |
18.09% |
2002/03 |
18.09% |
2003/04 |
17.19% |
No survey carried out in 2002/03. Next survey will be carried out in 2003/04 |
Coarse Visual Inspection | |
Unclassified roads - BV97b |
2001/02 |
17.8% |
2002/03 |
13.66% |
2003/04 |
16.9% |
Early days but appears on course |
Coarse Visual Inspection | |
Number of bus passenger journeys |
Thousands of bus passenger journeys (ie boardings) per year in the authority - BV102 |
1999/2000 |
27.81 million |
2002/03 |
27.75 million |
2010 |
30.59 million |
Investment already made and proposed should start to have an increasing impact from 2003/04 onwards |
Bus Operators |
Bus passenger satisfaction |
Percentage of bus users satisfied with local bus services |
2003/04 |
N/A |
2003/04 |
N/A |
2003/04 |
Match National average (45%) |
N/A |
Public Survey (BVPI104) |
1997/2001 |
26.1% |
1999/2003 |
34.1% |
N/A |
N/A |
County Council Transpol Survey | |||
Number of cycling trips |
Number of cycling trips at a representative number of counting points |
1999 |
Index 100 |
2002 |
Index 89.3 |
2012 |
Quadruple |
Not on target - monitoring process to be reviewed |
County Council Cycle Counters |
Number of deaths and serious injuries (all ages) |
Number of people killed or seriously injured on roads in the authority |
1994 - 1998 average |
1054 |
2002 |
938 |
2010 |
633 |
Remains on target |
County Council Casualty Statistics |
Number of children killed and seriously injured |
Number of children (aged less than 16) killed or seriously injured on roads in the authority |
1994 - 1998 average |
110 |
2002 |
94 |
2010 |
55 |
Remains broadly on target |
County Council Casualty Statistics |
Light rail passenger journeys |
Not applicable at this stage |
||||||||
% of rural households within 13 minutes walk of an hourly or better bus service |
% of rural households within 13 minutes walk of an hourly or better bus service |
2002 |
44% |
2003 |
44% |
2005/06 |
44% |
No change - however investment is focused on demand responsive services |
County Council Geographical Information System |
Public Service Agreement Targets
Headline National Target |
Local performance targets without PSA |
Local performance targets with PSA |
Interim performance target |
Baseline data |
Progress made in 2002/03 |
On track/ not on track to meet targets? |
PSA or 10 Year Plan target linked to |
Public Transport | |||||||
Increase in bus use from 2000 levels by 10% by 2010 |
Increase bus use in 2004/05 by 2½% over 2000 levels |
Increase bus use in 2004/05 by 4% over 2000 levels |
2½% increase by March 2004 |
27.81 million (1999/2000) |
27.75 million |
Not on track |
National Target 24 |
Improve bus service punctuality |
95% of services operating within a window of 5 minutes late and 1 minute early |
No change |
None |
90.3% 2001/02 |
91.1% |
On track |
National Target 24 |
Improvement in bus service reliability |
99.5% of scheduled mileage, except where this is affected by factors beyond operators' control |
No change |
None |
To be discussed with traffic commissioners |
No clear evidence |
National Target 24 | |
Casualty Reduction | |||||||
40% reduction in fatal and serious casualties by 2010 from a 1994-98 base. |
863 fatal and serious casualties by 2004 |
780 fatal and serious casualties by 2004 |
None |
1055 fatal and serious casualties (1994/98) |
938 killed or seriously injured casualties in calendar year 2002 |
Not on track to meet full PSA target |
Local Target 6 |
Maintenance | |||||||
Halt the deterioration in the condition of local roads by 2004 |
In the year ending 31 December 2004 a deterioration across all non-principal roads of 0.08% points against the 2002 baseline |
In the year ending 31 December 2004 an improvement across all non-principal roads of 0.02% points against the 2002 baseline |
In the year ending 31 December 2003 no worsening across all non-principal roads against the 2002 baseline |
18.09% non-principal classified roads (2002/03) |
Next surveys will be carried out in 2003/04 |
On track |
National Target 35 |
Elimination of the backlog by 2010 |
N/A |
Elimination of backlog by 2010 |
None |
13.66% unclassified roads (2002/03) |
N/A |
On track |
National Target 35 |
Hampshire's Local Transport Plan Headline Targets
Local objectives contained in LTP |
Local performance indicators contained in LTP |
Source of data |
Local targets or outcomes contained in LTP |
Baseline data |
Progress made in 2002/03 against local outcomes |
On track/ not on track to meet targets? |
Which national PSA or 10 Year Plan target does the local target/ outcome link to |
Reduce the rate of traffic growth |
Volume of traffic at permanent traffic count sites. |
County Council permanent traffic counts |
To halve the rate of forecast traffic growth between 1998 and 2020 from 41% to 21% |
No of car journeys 1998 Base of 100 |
107.1 (2002) |
No clear evidence, see section 3.2. |
PSA 1 (Road) |
To increase the use of public transport |
Number of bus passenger journeys per year |
DfT survey of bus operators |
To increase public transport patronage by 25% between 2000 and 2020 |
Passenger journeys in 1999/2000: 27.81 million |
Passenger journeys in 2002/03: 27.75 million |
No clear evidence, see section 3.3. |
PSA 2 (Local Public Transport) |
Number of rail passenger journeys per year |
County Council monitoring of rail passengers |
Passenger journeys in 2000; index of 100 |
129.7 (2002) |
On track | |||
Number of ferry passenger journeys per year |
Gosport and Hythe Ferry Operators |
Passenger journeys in 2000 3.2 million |
3.9 million (2002) |
On track | |||
Improve bus service punctuality |
95% of services operating within a window of 5 minutes late and 1 minute early |
County Council Surveys |
To achieve 95% of services operating within a window of 5 minutes late and 1 minute early by 2010 |
90.3% 2001/02 |
91.1% |
On track |
PSA 2 (Local Public Transport) |
Reduce the number of road accidents |
Number of deaths and serious injuries |
County Council Casualty Statistics |
40% reduction in the number of people killed or seriously injured to the average 1994-98 level by 2010 |
1055 base year 1994-98 average |
938 (2002) |
On track |
PSA 3 (Road accidents) |
Number of children killed or seriously injured |
50% reduction in the number of children killed or seriously injured to the average 1994-98 level by 2010 |
110 base year 1994-98 average |
81 (2002) |
On track |
PSA 3 (Road accidents) | ||
Number of slight casualties1 |
10% reduction in the number of slight casualties to the average 1994-98 level by 2010 |
5789 base year 1994-98 average |
5296 (2002) |
On track |
PSA 3 (Road accidents) | ||
Increase the level of cycling |
Number of people cycling2 |
County Council Permanent Cycle Counters |
To quadruple the number of cycling trips by 2012 from a 1996 base |
Cycling trips in 1999; index of 100 |
89.3 (2002) |
Not on track |
TYP5 (Cycling trips) |
Increase the level of walking |
Number of people walking2 |
County Council Cordon Surveys |
To increase the number of walking trips in Hampshire by 25% by 2020 from a 1999 base |
Walking trips in 1999; index of 100 |
165 (2002) |
On track |
N/A |
Local objectives contained in LTP |
Local performance indicators contained in LTP |
Source of data |
Local targets or outcomes contained in LTP |
Baseline data |
Progress made in 2002/03 against local outcomes |
On track/ not on track to meet targets? |
Which national PSA or 10 Year Plan target does the local target/ outcome link to |
Improve the Environment and Health |
Level of particulates (PM10) at selected sites |
County Council/District Council air quality monitoring stations |
To achieve the objective in the National Air Quality Strategy (National Targets) of not exceeding limits of 50 micrograms (μg) per metre3 |
2000 level of 22.55 μg/m3 |
2002 level of 22.15 μg/m3 |
On track |
PSA 4 (Air Quality) |
Level of nitrogen dioxide (N02) at selected sites |
To achieve the objective in the National Air Quality Strategy (National Targets) of not exceeding limits of 105 parts per billion (ppb) |
2000 level of 23.9 ppb |
2000 level of 21.5 ppb |
On track |
PSA 4 (Air Quality) | ||
Level of carbon monoxide (CO) at selected sites |
To achieve the objective in the National Air Quality Strategy (National Targets) of not exceeding limits of 10 parts per million (ppm) |
2000 level of 0.7 ppm |
2000 level of 0.57 ppm |
On track |
PSA 4 (Air Quality) | ||
Travel Plans |
Number of workplace travel plans |
County Council Workplace Travel Plan Coordinator |
To encourage the development of workplace travel plans among all major businesses in Hampshire. With a target of 50, subsequently doubled to 100 by 2005 |
3 businesses (1998) |
94 (2002 cumulative total) |
On track |
N/A |
Number of schools with a travel plan |
County Council School Travel Plan Coordinator |
To encourage the development of travel plans amongst all schools in Hampshire. With a target of 150 schools to have a Travel Plan by 2005/06 |
3 schools (1998/99) |
57 (2002/03 cumulative total) |
On track |
N/A |
1 Figures were initially expressed as the number of people slightly injured per million vehicle kilometres, however the figures are not currently available.
2 Base amended to 1999