Archived decisions

Hampshire County Council

Rushmoor Highway Management Advisory Panel

15 October 2003

Highway Maintenance and Minor Capital Works

Programmes 2003/04

Report of the Director of Environment

Item 7

Contact: Brian Millen, tel 01256 764444 email [email protected]

1. Summary

1.1 This report outlines progress with regard to the 2003/04 Highway Maintenance and Minor Capital Works programmes and gives an update on the 2003/04 Highway Maintenance budget.

2. Background

2.1 The Highway Maintenance Programme is funded from both revenue and capital allocations.

2.2 The revenue maintenance programme funds minor works, such as pothole repairs and routine drainage work, including gully cleaning, signs and road markings, environmental maintenance of grass verges, trees and shrubs, weed control and highway emergencies. Minor bridge works and winter maintenance are also funded from revenue. Budget allocations are set at a level that ensures the safety and serviceability of the highway network.

2.3 The capital maintenance programme funds planned maintenance, including special maintenance, resurfacing and surface dressing, and also provides for essential repairs to the structure of the highway.

3. Highway Maintenance Budget and Programme 2003/04

3.1 The Highway Maintenance budget for 2003/04, approved by the Executive Member for Environment, is £46,889,000. This sum comprises £19,615,000 revenue funding and £27,274,000 funding from the capital programme provision.

3.2 This year urban footways have been targeted to maintain accessibility and improve standards in the heavily used areas, reducing the potential for claims. In addition, the rural unclassified road network was severely damaged as a result of the flooding in 2000/01 and requires a sustained, enhanced level of funding to recover.

3.3 To reflect the condition of the footway network in Hampshire, user concerns and the deteriorating condition of the rural unclassified lanes, an additional £3.5 million of funding was specifically allocated by the County Council to these areas of need for 2003/04. Of this funding, £2.5 million was allocated to footway works and £1 million to maintenance of the rural unclassified road networks.

      Revenue Maintenance Budget and Programme

3.4 The total revised allocation for Rushmoor for 2003/04 is £370,000. Progress throughout the year has been in line with the spend profile and it is expected that the programme will be completed within time and budget constraints. A budget monitoring statement is attached as Appendix 1.

3.5 The Revenue Maintenance Programme funds three main areas of highway maintenance:

      (i) reactionary minor repair works on the road and footway network;

      (ii) maintenance and minor traffic management improvements of signs and road markings; and

      (iii) the environmental aspects of highway maintenance, including grass cutting, weed treatment, and tree and shrub maintenance.

3.6 Additional revenue budgets are held centrally, which include certain performance elements of the County Council's term maintenance contract. The performance based work contained in the contract includes:

      (i) gully and catch-pit emptying;

      (ii) rural visibility splay grass cutting; and

      (iii) `A' road minor carriageway repairs, road markings, studs, sign cleaning, safety fencing.

      Other centrally held budgets cover winter maintenance and ordinary bridge maintenance.

      Capital Maintenance Budget and Programme

3.7 The total allocation for Rushmoor for 2003/04 is £607,000, which includes £74,000 from the £3.5 million county-wide additional funding previously reported. The funding allocation for the Capital Maintenance `Planned Works' Programme is based on the proven HAMP rating system and reflects the agreed intervention levels. The HAMP rating intervention level directs funding to those maintenance schemes displaying a higher maintenance need. Planned structural maintenance repairs undertaken through the Capital Maintenance Programme include surface dressing, special maintenance and resurfacing schemes.

3.8 This year's schemes are progressing well with the expectation that the `Planned' Maintenance Programme will be delivered within time and budget constraints. Progress on this year's schemes is shown in Appendix 2.

3.9 The capital maintenance programme also supports the centrally controlled areas of work, including major maintenance schemes and bridge maintenance. In Rushmoor the A325 Bus Priority corridor scheme includes £400,000 of maintenance works.

3.10 Surface dressing is an extremely cost-effective way of prolonging the life of the carriageway, sealing cracks and restoring skid resistance. The total budget county-wide of £3,297,000 is managed centrally and for 2003/04 supported a HAMP intervention level of 50 on the principal road network. High performance surface dressing on the non-principal roads has a HAMP intervention level of 60 and 70 for the urban and minor roads programme respectively. All sites on this year's programme for the Rushmoor have now been successfully treated. This year's schemes are listed in Appendix 2.

4. Minor Capital Works

4.1 The Minor Capital Works programme (also known as the Under £10,000 programme) is funded from the capital allocation based on the Local Transport Plan submission to the Department for Transport. A sum of £15,000 was allocated for the Rushmoor area in 2003/04 and the schemes included in the programme are:

      (i) B3014 Fleet Road Farnborough West from Howard Drive - provide new footway.

    (ii) U339 Sandy Lane Farnborough - provide new cycleway.

    These schemes are scheduled to be completed by the end of the year.

Recommendation

That this report be noted.

Section 100 D - Local Government Act 1972 - background papers

The following documents disclose facts or matters on which this report, or an important part of it, is based and have been relied upon to a material extent in the preparation of this report.

NB the list excludes:

1.

Published works.

2.

Documents which disclose exempt or confidential information as defined in the Act.

TITLE

LOCATION

None.

8225/BM

APPENDIX 1

HAMPSHIRE HIGHWAYS RUSHMOOR

Revenue Budget 2003/04

Routine Maintenance (carriageway, footway repairs)

£149,000

Gully Cleansing

£3,000

Aids to Movement (lines and signs)

£73,000

Environmental (grass, trees, shrubs)

£103,000

Weed Control

£32,000

Hazard Clearance

£10,000

Total:

£370,000

Capital Budget 2003/04 Principal Roads

Principal Roads Routine Structural Repairs

£39,000

Principal Roads Special Maintenance

£0

Principal Roads Resurfacing

£45,000

Total:

£84,000

Capital Budget 2003/04 Non Principal Roads

Non Principal Roads Routine Structural Repairs

£235,000

Non Principal Roads Special Maintenance

£256,000

Non Principal Roads Resurfacing

£19,000

Non Principal Roads Tactile Paving Crossing Points

£13,000

Total:

£523,000

Total Maintenance Budget Allocation Rushmoor

£977,000

APPENDIX 2

HAMPSHIRE HIGHWAYS RUSHMOOR

2003-2004 SPECIAL MAINTENANCE

RESURFACING AND SURFACE DRESSING PROGRAMME

NON-PRINCIPAL SPECIAL MAINTENANCE PROGRAMME

    Prince Charles Crescent, Farnborough

Re-kerb Roundabout Island

£17,400

Complete

    St. Michaels Road, Farnborough

Widen Roundabout Island

£32,500

Complete

    Sebastopol Road, Aldershot

Footway Resurfacing

£4,200

Complete

    Busk Crescent, Farnborough

Footway Resurfacing

£17,700

Complete

    Highfield Road, Farnborough

    (Bridge Road - Holly Road)

Footway Resurfacing

£14,500

Complete

    Maple Leaf Close, Farnborough

    (Dene Road - End of cul-de-sac)

Footway Resurfacing

£4,000

Complete

    Giffard Drive, Farnborough

    (Giffard Drive - Shelley Rise)

Footway Resurfacing

£3,500

3rd Quarter

    Baird Road/Faraday Road, Farnborough

Footway Resurfacing

£10,000

3rd Quarter

    Fernhill Walk, Farnborough

    (Fernhill Lane - End of cul-de-sac)

Footway Resurfacing

£9,500

3rd Quarter

    Farm Road & Fieldway, Aldershot

Footway Resurfacing

£30,000

3rd Quarter

    Pinewood Park, Farnborough

    (Nos.492-343 & 372-384)

Footway Resurfacing

£23,000

4th Quarter

    Queensmead, Civic Centre Footways

Footway Resurfacing

£25,000

4th Quarter

    North Lane, Aldershot

Kerbing & Footway Resurfacing

£40,000

4th Quarter

    Pavilion Road, Aldershot

    (Chetwode Terrace - No.20)

Footway Resurfacing

£7,700

On hold as Reserve Scheme

    Hospital Hill, Aldershot

    (Queens Road - opposite Willems Avenue)

Footway Resurfacing

£17,000

On hold

£256,000

NON-PRINCIPAL RESURFACING PROGRAMME

    Sebastopol Road, Aldershot

Carriageway Resurfacing

£9,000

On hold as Reserve Scheme

    Grosvenor Road, Aldershot

    (Victoria Road - Britchett Road)

Carriageway Resurfacing

£10,000

On hold as Reserve Scheme

£19,000

PRINCIPAL SPECIAL MAINTENANCE PROGRAMME

    A323, Wellington Avenue, Aldershot

Carriageway Resurfacing

£45,000

Complete

£45,000

SURFACE DRESSING HIGH PERFORMANCE - GROUP 2 (ALL COMPLETE)

Road

From

To

    A323 Fleet Road Aldershot

Rushmoor Road

Windy Gap

    U353 Holly Road Aldershot

North Lane

Redan Road

     
     

SURFACE DRESSING MINOR ROADS - GROUP 3 (ALL COMPLETE)

Road

From

To

    Tongham Road Aldershot

Oakway

Willow Way

    Alma Close Aldershot

Deadbrook Lane

End Cul-de-sac

    Southwalk Aldershot

North Lane

End Cul-de-sac

    Longbeech Drive Farnborough

Linksway

Larchway

    Briars Close Farnborough

Southwood Lane

End Cul-de-sac

    New Dawn Close Farnborough

Briars Close

End Cul-de-sac

    Cornelia Close Farnborough

Briars Close

End Cul-de-sac

    Nevada Close Farnborough

Briars Close

End Cul-de-sac

    Boundary Road Farnborough

Alexandra Road

Canterbury Road

    York Road Farnborough

Reading Road

Queens Road

FOOTWAY SURFACE DRESSING (ALL COMPLETE)

Road

    Boundary Road, Farnborough

    Canterbury Road, Farnborough

    Albert Road, Farnborough

    Chalfont Drive, Farnborough

    Firs Close, Farnborough

    Chatfield Close, Farnborough

    Cambridge Close West, Farnborough

    Cambridge Close East, Farnborough

    Yetminster Road, Farnborough

    Windsor Road, Farnborough

    Rivers Close, Farnborough

    Bruntile Close, Farnborough

    Hermitage Close, Farnborough

    Peabody Road, Farnborough

    York Road, Farnborough

    Cross Street, Farnborough

    Guildford Road West, Farnborough

    Abbey Way, Farnborough

    Monks Close, Farnborough

    Douai Close, Farnborough

    Priory Street, Farnborough

    The Grove, Farnborough

    Fellows Road, Farnborough