Archived decisions

Hampshire County Council

Havant Highway Management Advisory Panel

4 November 2003

Highway Maintenance and Minor Capital Works
Programmes 2003/04

Report of the Director of Environment

Item 7

Contact: Peter Mitchell, tel 023 9244 6159 email: [email protected]

1. Summary

1.1 This report outlines progress with regard to the 2003/04 Highway Maintenance and Minor Capital Works programmes and gives an update on the 2003/04 Highway Maintenance budget.

2. Background

2.1 As previously reported, the Highway Maintenance programme is funded from both revenue and capital allocations.

2.2 The revenue maintenance programme funds minor works, such as pothole repairs and routine drainage work, including gully cleaning, signs and road markings, environmental maintenance of grass verges, trees and shrubs, weed control and highway emergencies. Minor bridge works and winter maintenance are also funded from revenue. Budget allocations are set at a level that ensures the safety and serviceability of the highway network.

2.3 The capital maintenance programme funds planned maintenance, including special maintenance, resurfacing and surface dressing, and also provides for essential repairs to the structure of the highway.

3. Highway Maintenance Budget and Programme 2003/04

3.1 The Highway Maintenance budget for 2003/04, approved by the Executive Member for Environment, is £46,889,000. This sum comprises £19,615,000 revenue funding and £27,274,000 funding from the capital programme provision.

    Revenue Maintenance Budget and Programme

3.2 The total revised allocation for Havant for 2003/04 is £514,000. Progress throughout the year has been in line with the spend profile and it is expected that the programme will be completed within time and budget constraints. A budget monitoring statement is attached as Appendix 1.

3.3 The revenue maintenance programme funds three main areas of highway maintenance:

      (i) reactive minor repair works on the road, cycleway and footway network;

      (ii) maintenance of current traffic signs and road markings and minor traffic management improvements; and

      (iii) the environmental aspects of highway maintenance, including grass cutting, weed treatment, and tree and shrub maintenance.

3.4 Additional revenue budgets are held centrally for the performance elements of the County Council's term maintenance contract. The performance based work contained in the contract includes:

    (i) gully emptying;

    (ii) visibility splay grass cutting;

    (iii) winter maintenance;

    (iv) routine bridge maintenance; and

    (v) `A' road routine maintenance.

    Capital Maintenance Budget and Programme

3.5 The total allocation for Havant for 2003/04 is £790,000, which includes £225,000 from the £3.5 million county-wide additional funding previously reported. The funding allocation for the capital maintenance `planned works' programme is based on the proven HAMP rating system and reflects the agreed intervention levels. The HAMP rating intervention level directs funding to those maintenance schemes displaying a higher maintenance need. Planned structural maintenance repairs undertaken through the capital maintenance programme include surface dressing, special maintenance and resurfacing schemes.

3.6 This year's schemes are progressing well, with the expectation that the planned maintenance programme will be delivered within time and budget constraints. Progress on this year's schemes is shown in Appendix 2.

3.7 The capital maintenance programme also supports the centrally controlled areas of work, including major maintenance schemes and bridge maintenance.

3.8 Surface dressing is an extremely cost-effective way of prolonging the life of the carriageway, sealing cracks and restoring skid resistance. The total budget county-wide of £3,297,000 is managed centrally and for 2003/04 supported a HAMP intervention level of 50 on the principal road network. High performance surface dressing on the non-principal roads has a HAMP intervention level of 60 and the intervention level is 70 for the urban and minor roads programmes. All sites on this year's programme for Havant have now been successfully treated. This year's schemes are listed in Appendix 2.

4. Minor Capital Works

4.1 The Minor Capital Works programme (also known as the Under £10,000 programme) is funded from the capital allocation based on the Local Transport Plan submission to the Department for Transport. A sum of £17,000 was allocated for Havant in 2003/04 and the schemes included in the programme are:

    (i) A3023 Havant Road, Hayling Island £9,000

      new footway

    (ii) Purbrook Chase Precinct £8,000

      construction of disabled access ramp

      Total £17,000

    These schemes are scheduled to be completed by the end of the year.

Recommendation

That this report be noted.

Section 100 D - Local Government Act 1972 - background papers

The following documents disclose facts or matters on which this report, or an important part of it, is based and has been relied upon to a material extent in the preparation of this report.

NB the list excludes:

1.

Published works.

2.

Documents which disclose exempt or confidential information as defined in the Act.

TITLE

LOCATION

None.

8330/PM

APPENDIX 1

HAMPSHIRE HIGHWAYS HAVANT

Original

Allocation

£

Revised

Allocation

£

Commitment

(to 30/09/03)

%

Revenue Budget 2003/4

Routine Maintenance (carriageway, footway repairs)

£197,000

£197,000

50

Gully Cleansing

£5,000

£5,000

0

Aids to Movement ( signs and road markings )

£74,000

£82,000

59

Traffic Management TROs

£11,000

£11,000

57

Environmental ( grass, trees, shrubs )

£176,000

£156,000

100

Weed Control

£49,000

£49,000

98

Hazard Clearance

£14,000

£14,000

321

Total

£526,000

£514,000

78

Capital Budget 2003/04

Principal Roads

Principal Roads Routine Structural Repairs

£15,000

£15,000

130

Principal Roads Special Maintenance

£42,000

£42,000

69

Principal Roads Resurfacing

Nil

Nil

Total

£57,000

£57,000

87

Capital Budget 2003/04

Non-Principal Roads

Non-Principal Roads Routine Structural Repairs

£341,000

£354,000

58

Non-Principal Roads Special Maintenance

£90,000

£90,000

102

Non-Principal Roads Resurfacing

£50,000

£50,000

151

Footway Maintenance

£225,000

£225,000

80

Haunch, Resurfacing & Recycling

Nil

Nil

Non-Principal Roads Tactile Paving Crossing Points

£14,000

£14,000

76

Total

£720,000

£733,000

77

Total Maintenance Budget Allocation for Havant

£1,303,000

£1,324,000

77