1. Summary

1.1 This report outlines progress with the 2003/04 Highway Maintenance and Minor Capital Works Programmes and gives an update on 2003/04 Highway Maintenance budget.

2. Background

2.1 The highway maintenance programme is funded from both revenue and capital allocations.

2.2 The revenue maintenance programme funds minor works such as pothole repairs, routine drainage work including gully cleaning, signs and road markings, environmental maintenance of grass verges, trees and shrubs, weed control and highway emergencies. Minor bridge works and winter maintenance are also funded from revenue. Budget allocations are set at a level that ensures the safety and serviceability of the highway network.

2.3 The capital maintenance programme funds planned maintenance, including special maintenance, resurfacing and surface dressing, and also provides for essential repairs to the structure of the highway.

3. Highway Maintenance Budget and Programme 2003/04

3.1 The Highway Maintenance budget for 2003/04, approved by the Executive Member for Environment, is £46,889,000. This sum comprises £19,615,000 revenue funding and £27,274,000 funding from the capital programme provision.

3.2 This year urban footways have been targeted to maintain accessibility and improve standards in the heavily used areas, reducing the potential for claims. In addition, the rural unclassified road network was severely damaged as a result of the flooding in 2000/01 and requires a sustained, enhanced level of funding to recover.

3.3 To reflect the condition of the footway network in Hampshire, user concerns and the deteriorating condition of the rural unclassified lanes, an additional £3.5 million of funding was specifically allocated by the County Council to these area of need for 2003/04. Of this funding, £2.5 million was allocated to footway works and £1 million to maintenance of the rural unclassified road networks.

      Revenue Maintenance Budget and Programme

3.4 The total revised allocation for Basingstoke and Deane for 2003/04 is £818,000. Additional funding of £374,000 was allocated by the Highways Agency following the de trunking of this road in May this year. This money is for maintenance of the A339 and from this sum, £160,000 has been put against Ordinary Maintenance, the remainder being used for road salting, street lighting, structures, arboriculture and centrally funded work such as gully emptying and white lining. Progress throughout the year has been in line with the spend profile and it is expected that the programme will be completed within time and budget constraints. A budget monitoring statement is included within Appendix 1.

3.5 The revenue maintenance programme funds three main areas of highway maintenance: reactionary minor repair works on the road and footway network, maintenance and minor traffic management improvements of signs and road markings and the environmental aspects of highway maintenance, including grass cutting, weed treatment and tree and shrub maintenance.

3.6 Additional revenue budgets are held centrally, which include certain performance elements of the County Council's term maintenance contract. The performance based work contained in the contract includes:

      (i) gully and catch-pit emptying;

      (ii) rural visibility splay grass cutting; and

      (iii) `A' road minor carriageway repairs, road markings, studs, sign cleaning, safety fencing.

      Other centrally held budgets cover winter maintenance and ordinary bridge maintenance.

      Capital Maintenance Budget and Programme

3.7 The total allocation for Basingstoke and Deane for 2003/04 is £1,656,450 which includes £244,000 from the £3.5m county-wide additional funding previously reported. The funding allocation for the capital maintenance `planned works' programme is based on the proven HAMP rating system and has reflected the agreed intervention levels. The HAMP rating intervention level directs funding to those maintenance schemes displaying a higher maintenance need. Planned structural maintenance repairs undertaken through the capital maintenance programme include surface dressing, special maintenance and resurfacing schemes.

3.8 This years schemes are progressing well with the expectation that the `planned' maintenance programme will be delivered within time and budget constraints. Progress on this years schemes is shown in Appendix 2.

3.9 The capital maintenance programme also supports the centrally controlled areas of work, including major maintenance schemes and bridge maintenance. In Basingstoke and Deane there are no major schemes this year but a major highway maintenance scheme is currently being prepared for the A340 in Tadley and due to be starting on site in the summer of 2004.

3.10 Surface dressing is an extremely cost-effective way of prolonging the life of the carriageway, sealing cracks and restoring skid resistance. The total budget county-wide of £3,297,000 is managed centrally and for 2003/04 supported a HAMP intervention level of 50 on the principal road network. High performance surface dressing on the non-principal roads has a HAMP intervention of 60 and 70 for the urban and minor roads programme respectively. All sites on this years programme for the Basingstoke and Deane have now been successfully treated. This years schemes are listed in Appendix 3.

4. Minor Capital Works

4.1 The Minor Capital Works Programme (also known as the Under £10,000 Programme) is funded from the capital allocation based on the Local Transport Plan submission to the Department for Transport.

    £20,000 was allocated for the Basingstoke and Deane area in 2003/04 and the schemes included in the programme are:

4.2 A new footway link from the A339 alongside the B3051 Little Knowle Hill near Kingsclere connecting FP 56 just east of Moor Cottage with the new kerbing works completed on the A339.

4.3 A new footway link along Harts Lane from Hart's Cottages to the Carpenters Arms in Burghclere.

4.4 These schemes are scheduled to be completed by the end of the year.

Recommendation

That this report be noted.

Section 100 D - Local Government Act 1972 - background papers

The following documents disclose facts or matters on which this report, or an important part of it, is based and has been relied upon to a material extent in the preparation of this report.

NB the list excludes:

1.

Published works.

2.

Documents which disclose exempt or confidential information as defined in the Act.

TITLE

LOCATION

8348/PE

              APPENDIX 1

HAMPSHIRE HIGHWAYS NORTH, BASINGSTOKE

Revenue Budget 2003/04

Routine Maintenance (carriageway, footway repairs)

Minor Cyclic Maintenance

Drainage

£210,000

£255,000

£120,000

Gully Cleansing (Soakaways and non std gullies in addition to the county-wide contract)

£43,000

Aids to Movement (lines and signs)

£126,000

Environmental (grass, trees, shrubs)

£81,000

Weed Control

£97,000

Hazard Clearance

£46,000

Total:

£978,000

Capital Budget 2003/04 Principal Roads

Principal Roads Routine Structural Repairs

£54,000

Principal Roads Special Maintenance

£35,000

Total:

£89,000

Capital Budget 2003/04 Non Principal Roads

Additional Funding

Non Principal Roads Routine Structural Repairs

£623,000

Non Principal Roads Special Maintenance

£194,000

£46,000

Non Principal Roads Resurfacing

£491,750

£197,700

Non Principal Roads Tactile Paving Crossing Points

£15,000

Total Capital Budget

£1,412,750

£243,700

Total Maintenance Budget Allocation Basingstoke

£2,634,450

            APPENDIX 2

PRINCIPAL and NON-PRINCIPAL ROADS

Special Maintenance Programme 2003/2004

BASINGSTOKE and DEANE

Principal Roads

Work description

Status

Estimated Cost

Reading Road, Sherfield on Loddon A33

Drainage

Works programmed

£15000

Mulford's Hill, Tadley A340

Drainage

Design not yet completed

£20000

£35000

Non Principal Roads

Work Description

Status

Estimated cost

Morley Rd Basingstoke

Joint repairs

Works completed

£3500

Cold Harbour, N Waltham

Kerbing and footway provision

Works programmed

£24000

St Patricks Rd, Basingstoke

Kerb replacement

Works programmed

£6600

Whitney Rd, Basingstoke

Footway RS w bollards

Works completed

£8000

Stratfield Rd Link Rd, Basingstoke

Kerb replacement

Works programmed

£8000

Lingfield Close, Basingstoke

Footway resurfacing

Works completed

£7200

Park Lane, Stratfield Saye

Reconstruct cgwy and overlay

Works completed

£39000

Shelley Close, Basingstoke

Footway resurfacing

Works completed

£5000

Stukely Road, Basingstoke

Footway resurfacing

Works completed

£3000

Green Lane, Stratfield Saye

Haunching

Works completed

£57000

Gregory Close, Basingstoke

Footway resurfacing

Works programmed

£8000

Bodmin Close, Exmoor Close, Basingstoke

Footway resurfacing

Works programmed

£5700

Coronation Road, Basingstoke

Footway resurfacing

Works programmed

£8500

Pembroke Road, Basingstoke

Footway resurfacing

Works programmed

£4500

Dankworth Road, Basingstoke

Footway resurfacing

Works completed

£6000

£194000

Additional Scheme to be included

Ball Hill Road, East Woodhay

Haunching

Works programmed

£46000

Resurfacing 2003/2004

BASINGSTOKE

Non Principal Roads

Work description

Status

Estimated Cost

Aldermaston Road, Basingstoke

Resurfacing

Completed

£82500

Popley Way, Basingstoke

Resurfacing

Completed

£13000

Doswell Way, Basingstoke

Resurfacing

Completed

£8000

Hockford Lane, Ashford Hill

Resurfacing

Completed

£36000

Ashley Warren, Ecchinswell & Sydmonton

Resurfacing

Completed

£78750

Hollington Lane, East Woodhay

Resurfacing

Programmed

£52500

Stephenson Road, Basingstoke

Resurfacing

Programmed

£19000

Barefoot Lane

Resurfacing

Programmed

£21500

The Lynch, Overton

Resurfacing

Completed

£30000

Park Lane, Stratfield Saye

Resurfacing

Completed

£90000

Buckskin Lane, Basingstoke

Resurfacing

Programmed

£5500

Wade Road, Basingstoke

Resurfacing

Programmed

£35500

Kenilworth Road spur, Basingstoke

Resurfacing

Programmed

£4500

Waltham Lane, North Waltham

Resurfacing

Programmed

£15000

£491,750

Additional Schemes to be included

 

Essex Road, Basingstoke (Worting Rd - No 6)

Resurfacing

Incorporated with HQ scheme

£30000

 

Grafton Way, Basingstoke (Service Rd - Morse Rd)

Resurfacing

Programmed

£30000

Hill View Rd, Basingstoke (Austen Rd - A30)

Resurfacing

Programmed

£26600

Grammersham Lane

Resurfacing

Not yet designed

£15500

Additional Footway schemes to be included

     

Fabian Close, Basingstoke (Nos 1 - 25)

Footway resurfacing

Designed

£4500

Quilter Road, Basingstoke (Nos 407 - 423)

Footway resurfacing

Not yet designed

£3000

Wella Path, Basingstoke (to rear of No 26 Horwood Gardens)

Footway resurfacing

Not yet designed

£4500

Cheviot Close, Basingstoke (to rear of Nos 17 - 30)

Footway resurfacing

Not yet designed

£9000

Kenilworth Road (No 92 Roman Rd - No 82 Kenilworth Rd)

Footway resurfacing

Not yet designed

£35400

Winchcombe Road (No 3 Budds Close - No 24 Winchcombe Rd)

Footway resurfacing

Not yet designed

£5000

Stanford Road (Bernstein Rd - Barry Way)

Footway resurfacing

Not yet designed

£7700

Hazel Drive / Ringway North (L/C F505 - F510)

Footway resurfacing

Not yet designed

£4000

Buckskin Area Footpath (No 66 Ochil Close - rear No 20 Charnwood Close)

Footway resurfacing

Not yet designed

£7500

Carpenters Down Footpath (Carpenters Down - N of Tobago Close)

Footway resurfacing

Not yet designed

£15000

     

£197,700

BASINGSTOKE and DEANE

APPENDIX 3

Surface Dressing Programme 2003 / 2004

All completed in June/July 2003

 
     

Group 2 A Roads

 
 

Road Name / Location

From - To

A33

CHINEHAM and TAYLOR'S FARM

 

A3010

CHURCHILL WAY, BASINGSTOKE

 

A30

WINCHESTER ROAD

FROM KEMPSHOTT ROUNDABOUT TO

SAINSBURY ROUNDABOUT

     

Group 2 Roads

   
 

Road Name / Location

From - To

B3400

WORTING ROAD, BASINGSTOKE

OAKLEY to BASINGSTOKE

GERSHWIN ROAD

GERSHWIN ROAD, BASINGSTOKE

FROM NORTHEN JT BRIGHTON WAY TO JT COPLAND CLOSE

GRESLEY ROAD

GRESLEY ROAD, BASINGSTOKE

FROM DANESHILL RBT TO

STREET LIGHT NO 20

GROVE Rd/BLACK DAM WAY

BLACK DAM WAY, BASINGSTOKE

FROM VENTURE RBT TO

JT REMBRANDT CLOSE

CLIDDESDEN LANE

CLIDDESDEN LANE, BASINGSTOKE

 
     

Group 3 Roads

   
 

Road Name / Location

From - To

WALLINS COPSE

CHINEHAM

FROM JT READING ROAD TO

END CUL-DE-SAC

COPSE VIEW CLOSE

CHINEHAM

FROM JT FARM VIEW ROAD TO

END CUL-DE-SAC

NORN HILL CLOSE

BASINGSTOKE

FROM JT NORN HILL TO

END CUL-DE-SAC

BROADHURST GROVE

LYCHPITT

 

PADDOCKFIELDS

OLD BASING

 

LINDEN AVE

OLD BASING

 

MANOR LANE

OLD BASING

 

PYOTTS HILL

OLD BASING

 

MILKINGPEN LANE

OLD BASING

 

WOODSIDE GARDENS

CHINEHAM

FROM JT FARM VIEW GARDENS TO

END CUL-DE-SAC

TOLLWAY

CHINEHAM

 

MAYBROOK

CHINEHAM

 

BROOKFIELD CLOSE

CHINEHAM

FROM JT FARM VIEW DRIVE TO

END CUL-DE-SAC

BUCKLAND AVENUE

BASINGSTOKE

FROM JT WESTERN WAY TO

JT HIGH DRIVE

SYLVIA CLOSE

BASINGSTOKE

FROM CORDALE ROAD TO

END CUL-DE-SAC

UPPER SHERBOURNE ROAD

BASINGSTOKE

FROM JT OAKRIDGE ROAD TO

END CUL-DE-SAC

CAMROSE WAY

BASINGSTOKE

 

GAINSBOROUGH ROAD

BASINGSTOKE

 

MORLEY ROAD

BASINGSTOKE

 

BLUNDEN CLOSE

BASINGSTOKE

 

LIGHTFOOT GROVE

BASINGSTOKE

 

HATCH WARREN GARDENS

BASINGSTOKE

FROM JT HATCH WARREN LANE TO

END CUL-DE-SAC

PARKWOOD CLOSE

CHINEHAM

 

WESTON CORBETT LANE

TUNWORTH

 

ST JOHNS ROAD

OAKLEY

 

STATION ROAD

OAKLEY

 

BEGGARWOOD LANE

FARLEIGH WALLOP

 

WESTON ROAD

HERRIARD

 

GRAMMARSHAM LANE

FARLEIGH WALLOP

 

BRYCES LANE

BROWN CANDOVER

 

BAYMANS LANE

UPTON GREY

 

GREEN LANE

ELLISFIELD

 

THE MOUNT

HIGHCLERE

 

CHURCH ROAD

HIGHCLERE

 

SYDMONTON ROAD

WHITCHURCH

 

RAMPTONS ROAD

WHITCHURCH

 

WELLS LANE

WHITCHURCH

 

FAIROAK LANE

STRATFIELD SAYE

 

SILCHESTER ROAD

TADLEY

 

WEST STREET

TADLEY

 

PITFIELD LANE

MORTIMER WEST END

 

WEST HEATH ROAD

RAMSDELL

 

DUKES RIDE

SILCHESTER

 

STEVENS GREEN

ST MARY BOURNE

 

ASH ROAD / BEECH RD

BISHOPS GREEN