Archived decisions
Hampshire County Council Basingstoke and Deane Highway Management Advisory Panel 12 November 2003 Highway Maintenance and Minor Capital Works Programmes 2003/2004 Report of the Director of Environment |
Item 6 |
Contact: Peter Eade, Tel 01256 360093 email [email protected]
1. Summary
1.1 This report outlines progress with the 2003/04 Highway Maintenance and Minor Capital Works Programmes and gives an update on 2003/04 Highway Maintenance budget.
2. Background
2.1 The highway maintenance programme is funded from both revenue and capital allocations.
2.2 The revenue maintenance programme funds minor works such as pothole repairs, routine drainage work including gully cleaning, signs and road markings, environmental maintenance of grass verges, trees and shrubs, weed control and highway emergencies. Minor bridge works and winter maintenance are also funded from revenue. Budget allocations are set at a level that ensures the safety and serviceability of the highway network.
2.3 The capital maintenance programme funds planned maintenance, including special maintenance, resurfacing and surface dressing, and also provides for essential repairs to the structure of the highway.
3. Highway Maintenance Budget and Programme 2003/04
3.1 The Highway Maintenance budget for 2003/04, approved by the Executive Member for Environment, is £46,889,000. This sum comprises £19,615,000 revenue funding and £27,274,000 funding from the capital programme provision.
3.2 This year urban footways have been targeted to maintain accessibility and improve standards in the heavily used areas, reducing the potential for claims. In addition, the rural unclassified road network was severely damaged as a result of the flooding in 2000/01 and requires a sustained, enhanced level of funding to recover.
3.3 To reflect the condition of the footway network in Hampshire, user concerns and the deteriorating condition of the rural unclassified lanes, an additional £3.5 million of funding was specifically allocated by the County Council to these area of need for 2003/04. Of this funding, £2.5 million was allocated to footway works and £1 million to maintenance of the rural unclassified road networks.
Revenue Maintenance Budget and Programme
3.4 The total revised allocation for Basingstoke and Deane for 2003/04 is £818,000. Additional funding of £374,000 was allocated by the Highways Agency following the de trunking of this road in May this year. This money is for maintenance of the A339 and from this sum, £160,000 has been put against Ordinary Maintenance, the remainder being used for road salting, street lighting, structures, arboriculture and centrally funded work such as gully emptying and white lining. Progress throughout the year has been in line with the spend profile and it is expected that the programme will be completed within time and budget constraints. A budget monitoring statement is included within Appendix 1.
3.5 The revenue maintenance programme funds three main areas of highway maintenance: reactionary minor repair works on the road and footway network, maintenance and minor traffic management improvements of signs and road markings and the environmental aspects of highway maintenance, including grass cutting, weed treatment and tree and shrub maintenance.
3.6 Additional revenue budgets are held centrally, which include certain performance elements of the County Council's term maintenance contract. The performance based work contained in the contract includes:
(i) gully and catch-pit emptying;
(ii) rural visibility splay grass cutting; and
(iii) `A' road minor carriageway repairs, road markings, studs, sign cleaning, safety fencing.
Other centrally held budgets cover winter maintenance and ordinary bridge maintenance.
Capital Maintenance Budget and Programme
3.7 The total allocation for Basingstoke and Deane for 2003/04 is £1,656,450 which includes £244,000 from the £3.5m county-wide additional funding previously reported. The funding allocation for the capital maintenance `planned works' programme is based on the proven HAMP rating system and has reflected the agreed intervention levels. The HAMP rating intervention level directs funding to those maintenance schemes displaying a higher maintenance need. Planned structural maintenance repairs undertaken through the capital maintenance programme include surface dressing, special maintenance and resurfacing schemes.
3.8 This years schemes are progressing well with the expectation that the `planned' maintenance programme will be delivered within time and budget constraints. Progress on this years schemes is shown in Appendix 2.
3.9 The capital maintenance programme also supports the centrally controlled areas of work, including major maintenance schemes and bridge maintenance. In Basingstoke and Deane there are no major schemes this year but a major highway maintenance scheme is currently being prepared for the A340 in Tadley and due to be starting on site in the summer of 2004.
3.10 Surface dressing is an extremely cost-effective way of prolonging the life of the carriageway, sealing cracks and restoring skid resistance. The total budget county-wide of £3,297,000 is managed centrally and for 2003/04 supported a HAMP intervention level of 50 on the principal road network. High performance surface dressing on the non-principal roads has a HAMP intervention of 60 and 70 for the urban and minor roads programme respectively. All sites on this years programme for the Basingstoke and Deane have now been successfully treated. This years schemes are listed in Appendix 3.
4. Minor Capital Works
4.1 The Minor Capital Works Programme (also known as the Under £10,000 Programme) is funded from the capital allocation based on the Local Transport Plan submission to the Department for Transport.
£20,000 was allocated for the Basingstoke and Deane area in 2003/04 and the schemes included in the programme are:
4.2 A new footway link from the A339 alongside the B3051 Little Knowle Hill near Kingsclere connecting FP 56 just east of Moor Cottage with the new kerbing works completed on the A339.
4.3 A new footway link along Harts Lane from Hart's Cottages to the Carpenters Arms in Burghclere.
4.4 These schemes are scheduled to be completed by the end of the year.
Recommendation
That this report be noted.
Section 100 D - Local Government Act 1972 - background papers | |
The following documents disclose facts or matters on which this report, or an important part of it, is based and has been relied upon to a material extent in the preparation of this report. | |
NB the list excludes: | |
1. |
Published works. |
2. |
Documents which disclose exempt or confidential information as defined in the Act. |
TITLE |
LOCATION |
8348/PE
APPENDIX 1
HAMPSHIRE HIGHWAYS NORTH, BASINGSTOKE
Revenue Budget 2003/04 |
||
Routine Maintenance (carriageway, footway repairs) Minor Cyclic Maintenance Drainage |
£210,000 £255,000 £120,000 |
|
Gully Cleansing (Soakaways and non std gullies in addition to the county-wide contract) |
£43,000 |
|
Aids to Movement (lines and signs) |
£126,000 |
|
Environmental (grass, trees, shrubs) |
£81,000 |
|
Weed Control |
£97,000 |
|
Hazard Clearance |
£46,000 |
|
Total: |
£978,000 |
|
Capital Budget 2003/04 Principal Roads |
||
Principal Roads Routine Structural Repairs |
£54,000 |
|
Principal Roads Special Maintenance |
£35,000 |
|
Total: |
£89,000 |
|
Capital Budget 2003/04 Non Principal Roads |
Additional Funding | |
Non Principal Roads Routine Structural Repairs |
£623,000 |
|
Non Principal Roads Special Maintenance |
£194,000 |
£46,000 |
Non Principal Roads Resurfacing |
£491,750 |
£197,700 |
Non Principal Roads Tactile Paving Crossing Points |
£15,000 |
|
Total Capital Budget |
£1,412,750 |
£243,700 |
Total Maintenance Budget Allocation Basingstoke |
£2,634,450 |
APPENDIX 2
PRINCIPAL and NON-PRINCIPAL ROADS
Special Maintenance Programme 2003/2004
BASINGSTOKE and DEANE
Principal Roads |
Work description |
Status |
Estimated Cost |
Reading Road, Sherfield on Loddon A33 |
Drainage |
Works programmed |
£15000 |
Mulford's Hill, Tadley A340 |
Drainage |
Design not yet completed |
£20000 |
£35000 | |||
Non Principal Roads |
Work Description |
Status |
Estimated cost |
Morley Rd Basingstoke |
Joint repairs |
Works completed |
£3500 |
Cold Harbour, N Waltham |
Kerbing and footway provision |
Works programmed |
£24000 |
St Patricks Rd, Basingstoke |
Kerb replacement |
Works programmed |
£6600 |
Whitney Rd, Basingstoke |
Footway RS w bollards |
Works completed |
£8000 |
Stratfield Rd Link Rd, Basingstoke |
Kerb replacement |
Works programmed |
£8000 |
Lingfield Close, Basingstoke |
Footway resurfacing |
Works completed |
£7200 |
Park Lane, Stratfield Saye |
Reconstruct cgwy and overlay |
Works completed |
£39000 |
Shelley Close, Basingstoke |
Footway resurfacing |
Works completed |
£5000 |
Stukely Road, Basingstoke |
Footway resurfacing |
Works completed |
£3000 |
Green Lane, Stratfield Saye |
Haunching |
Works completed |
£57000 |
Gregory Close, Basingstoke |
Footway resurfacing |
Works programmed |
£8000 |
Bodmin Close, Exmoor Close, Basingstoke |
Footway resurfacing |
Works programmed |
£5700 |
Coronation Road, Basingstoke |
Footway resurfacing |
Works programmed |
£8500 |
Pembroke Road, Basingstoke |
Footway resurfacing |
Works programmed |
£4500 |
Dankworth Road, Basingstoke |
Footway resurfacing |
Works completed |
£6000 |
£194000 |
Additional Scheme to be included
Ball Hill Road, East Woodhay |
Haunching |
Works programmed |
£46000 |
Resurfacing 2003/2004
BASINGSTOKE
Non Principal Roads |
Work description |
Status |
Estimated Cost |
Aldermaston Road, Basingstoke |
Resurfacing |
Completed |
£82500 |
Popley Way, Basingstoke |
Resurfacing |
Completed |
£13000 |
Doswell Way, Basingstoke |
Resurfacing |
Completed |
£8000 |
Hockford Lane, Ashford Hill |
Resurfacing |
Completed |
£36000 |
Ashley Warren, Ecchinswell & Sydmonton |
Resurfacing |
Completed |
£78750 |
Hollington Lane, East Woodhay |
Resurfacing |
Programmed |
£52500 |
Stephenson Road, Basingstoke |
Resurfacing |
Programmed |
£19000 |
Barefoot Lane |
Resurfacing |
Programmed |
£21500 |
The Lynch, Overton |
Resurfacing |
Completed |
£30000 |
Park Lane, Stratfield Saye |
Resurfacing |
Completed |
£90000 |
Buckskin Lane, Basingstoke |
Resurfacing |
Programmed |
£5500 |
Wade Road, Basingstoke |
Resurfacing |
Programmed |
£35500 |
Kenilworth Road spur, Basingstoke |
Resurfacing |
Programmed |
£4500 |
Waltham Lane, North Waltham |
Resurfacing |
Programmed |
£15000 |
£491,750 |
Additional Schemes to be included
Essex Road, Basingstoke (Worting Rd - No 6) |
Resurfacing |
Incorporated with HQ scheme |
£30000 |
||||
Grafton Way, Basingstoke (Service Rd - Morse Rd) |
Resurfacing |
Programmed |
£30000 | ||||
Hill View Rd, Basingstoke (Austen Rd - A30) |
Resurfacing |
Programmed |
£26600 | ||||
Grammersham Lane |
Resurfacing |
Not yet designed |
£15500 | ||||
Additional Footway schemes to be included |
|||||||
Fabian Close, Basingstoke (Nos 1 - 25) |
Footway resurfacing |
Designed |
£4500 | ||||
Quilter Road, Basingstoke (Nos 407 - 423) |
Footway resurfacing |
Not yet designed |
£3000 | ||||
Wella Path, Basingstoke (to rear of No 26 Horwood Gardens) |
Footway resurfacing |
Not yet designed |
£4500 | ||||
Cheviot Close, Basingstoke (to rear of Nos 17 - 30) |
Footway resurfacing |
Not yet designed |
£9000 | ||||
Kenilworth Road (No 92 Roman Rd - No 82 Kenilworth Rd) |
Footway resurfacing |
Not yet designed |
£35400 | ||||
Winchcombe Road (No 3 Budds Close - No 24 Winchcombe Rd) |
Footway resurfacing |
Not yet designed |
£5000 | ||||
Stanford Road (Bernstein Rd - Barry Way) |
Footway resurfacing |
Not yet designed |
£7700 | ||||
Hazel Drive / Ringway North (L/C F505 - F510) |
Footway resurfacing |
Not yet designed |
£4000 | ||||
Buckskin Area Footpath (No 66 Ochil Close - rear No 20 Charnwood Close) |
Footway resurfacing |
Not yet designed |
£7500 | ||||
Carpenters Down Footpath (Carpenters Down - N of Tobago Close) |
Footway resurfacing |
Not yet designed |
£15000 | ||||
£197,700 | |||||||
BASINGSTOKE and DEANE |
APPENDIX 3 | ||||||
Surface Dressing Programme 2003 / 2004 All completed in June/July 2003 |
|||||||
Group 2 A Roads |
|||||||
Road Name / Location |
From - To | ||||||
A33 |
CHINEHAM and TAYLOR'S FARM |
||||||
A3010 |
CHURCHILL WAY, BASINGSTOKE |
||||||
A30 |
WINCHESTER ROAD |
FROM KEMPSHOTT ROUNDABOUT TO SAINSBURY ROUNDABOUT | |||||
Group 2 Roads |
|||||||
Road Name / Location |
From - To | ||||||
B3400 |
WORTING ROAD, BASINGSTOKE |
OAKLEY to BASINGSTOKE | |||||
GERSHWIN ROAD |
GERSHWIN ROAD, BASINGSTOKE |
FROM NORTHEN JT BRIGHTON WAY TO JT COPLAND CLOSE | |||||
GRESLEY ROAD |
GRESLEY ROAD, BASINGSTOKE |
FROM DANESHILL RBT TO STREET LIGHT NO 20 | |||||
GROVE Rd/BLACK DAM WAY |
BLACK DAM WAY, BASINGSTOKE |
FROM VENTURE RBT TO JT REMBRANDT CLOSE | |||||
CLIDDESDEN LANE |
CLIDDESDEN LANE, BASINGSTOKE |
||||||
Group 3 Roads |
|||||||
Road Name / Location |
From - To | ||||||
WALLINS COPSE |
CHINEHAM |
FROM JT READING ROAD TO END CUL-DE-SAC | |||||
COPSE VIEW CLOSE |
CHINEHAM |
FROM JT FARM VIEW ROAD TO END CUL-DE-SAC | |||||
NORN HILL CLOSE |
BASINGSTOKE |
FROM JT NORN HILL TO END CUL-DE-SAC | |||||
BROADHURST GROVE |
LYCHPITT |
||||||
PADDOCKFIELDS |
OLD BASING |
||||||
LINDEN AVE |
OLD BASING |
||||||
MANOR LANE |
OLD BASING |
||||||
PYOTTS HILL |
OLD BASING |
||||||
MILKINGPEN LANE |
OLD BASING |
||||||
WOODSIDE GARDENS |
CHINEHAM |
FROM JT FARM VIEW GARDENS TO END CUL-DE-SAC | |||||
TOLLWAY |
CHINEHAM |
||||||
MAYBROOK |
CHINEHAM |
||||||
BROOKFIELD CLOSE |
CHINEHAM |
FROM JT FARM VIEW DRIVE TO END CUL-DE-SAC | |||||
BUCKLAND AVENUE |
BASINGSTOKE |
FROM JT WESTERN WAY TO JT HIGH DRIVE | |||||
SYLVIA CLOSE |
BASINGSTOKE |
FROM CORDALE ROAD TO END CUL-DE-SAC | |||||
UPPER SHERBOURNE ROAD |
BASINGSTOKE |
FROM JT OAKRIDGE ROAD TO END CUL-DE-SAC | |||||
CAMROSE WAY |
BASINGSTOKE |
||||||
GAINSBOROUGH ROAD |
BASINGSTOKE |
||||||
MORLEY ROAD |
BASINGSTOKE |
||||||
BLUNDEN CLOSE |
BASINGSTOKE |
||||||
LIGHTFOOT GROVE |
BASINGSTOKE |
||||||
HATCH WARREN GARDENS |
BASINGSTOKE |
FROM JT HATCH WARREN LANE TO END CUL-DE-SAC | |||||
PARKWOOD CLOSE |
CHINEHAM |
||||||
WESTON CORBETT LANE |
TUNWORTH |
||||||
ST JOHNS ROAD |
OAKLEY |
||||||
STATION ROAD |
OAKLEY |
||||||
BEGGARWOOD LANE |
FARLEIGH WALLOP |
||||||
WESTON ROAD |
HERRIARD |
||||||
GRAMMARSHAM LANE |
FARLEIGH WALLOP |
||||||
BRYCES LANE |
BROWN CANDOVER |
||||||
BAYMANS LANE |
UPTON GREY |
||||||
GREEN LANE |
ELLISFIELD |
||||||
THE MOUNT |
HIGHCLERE |
||||||
CHURCH ROAD |
HIGHCLERE |
||||||
SYDMONTON ROAD |
WHITCHURCH |
||||||
RAMPTONS ROAD |
WHITCHURCH |
||||||
WELLS LANE |
WHITCHURCH |
||||||
FAIROAK LANE |
STRATFIELD SAYE |
||||||
SILCHESTER ROAD |
TADLEY |
||||||
WEST STREET |
TADLEY |
||||||
PITFIELD LANE |
MORTIMER WEST END |
||||||
WEST HEATH ROAD |
RAMSDELL |
||||||
DUKES RIDE |
SILCHESTER |
||||||
STEVENS GREEN |
ST MARY BOURNE |
||||||
ASH ROAD / BEECH RD |
BISHOPS GREEN |
||||||