1.1 This report outlines progress with regard to the 2003/04 Highway Maintenance and Minor Capital Works programmes and gives an update on the 2003/04 Highway Maintenance budget.
2. Background
2.1 As previously reported, the Highway Maintenance programme is funded from both revenue and capital allocations.
2.2 The revenue maintenance programme funds minor works such as, pothole repairs and routine drainage work, including gully cleaning, signs and road markings, environmental maintenance of grass verges, trees and shrubs, weed control and highway emergencies. Minor bridge works and winter maintenance are also funded from revenue. Budget allocations are set at a level that ensures the safety and serviceability of the highway network.
2.3 The capital maintenance programme funds planned maintenance, including special maintenance, resurfacing and surface dressing, and also provides for essential repairs to the structure of the highway.
3. Highway Maintenance Budget and Programme 2003/04
3.1 The Highway Maintenance budget for 2003/04, approved by the Executive Member for Environment, is £46,889,000. This sum comprises £19,615,000 revenue funding and £27,274,000 funding from the capital programme provision.
Revenue Maintenance Budget and Programme
3.2 The total revised allocation for Gosport for 2003/04 is £294,000, excluding those elements included in paragraph 3.4. Progress throughout the year has been in line with the spend profile and it is expected that the programme will be completed within time and budget constraints. A budget monitoring statement is attached as Appendix 1.
3.3 The revenue maintenance programme funds three main areas of highway maintenance:
(i) reactive minor repair works on the road, cycleway and footway network;
(ii) maintenance of current traffic signs and road markings and minor traffic management improvements; and
(iii) the environmental aspects of highway maintenance, including grass cutting, weed treatment, and tree and shrub maintenance.
3.4 Additional revenue budgets are held centrally for the performance elements of the County Council's term maintenance contract. The performance based work contained in the contract includes:
(i) gully emptying;
(ii) visibility splay grass cutting;
(iii) winter maintenance;
(iv) routine bridge maintenance; and
(v) `A' road routine maintenance.
3.5 It is noted that this year there have been more footway damage incidents due to tree roots; Jamaica Place, High Street Gosport and Bury Road, in particular there is also still significant damage caused by vehicle overrun on footways and verges.
Capital Maintenance Budget and Programme
3.6 The total allocation for Gosport for 2003/04 is £831,000, which includes £63,000 from the £3.5 million county-wide additional funding previously reported. The funding allocation for the capital maintenance `planned works' programme is based on the proven HAMP rating system and reflects the agreed intervention levels. The HAMP rating intervention level directs funding to those maintenance schemes displaying a higher maintenance need. Planned structural maintenance repairs undertaken through the capital maintenance programme include surface dressing, special maintenance and resurfacing schemes.
3.7 This year's schemes are progressing well with the expectation that the planned maintenance programme will be delivered within time and budget constraints. Progress on this year's schemes is shown in Appendix 2.
3.8 The capital maintenance programme also supports the centrally controlled areas of work, including major maintenance schemes and bridge maintenance.
3.9 Surface dressing is an extremely cost-effective way of prolonging the life of the carriageway, sealing cracks and restoring skid resistance. The total budget county-wide of £3,297,000 is managed centrally and for 2003/04 supported a HAMP intervention level of 50 on the principal road network. High performance surface dressing on the non-principal roads has a HAMP intervention level of 60 and the intervention level is 70 for the urban and minor roads programmes. Footway surface dressing sites are usually selected on the recommendation of the engineers who carry out highway inspections and areas that have a poor skid resistance, are heavily patched or affected by utility trenches are the preferred choices for treatment. All sites on this year's programme for Gosport have now been successfully treated. This year's schemes are listed in Appendix 2.
4. Minor Capital Works
4.1 The Minor Capital Works programme (also known as the Under £10,000 programme) is funded from the capital allocation based on the Local Transport Plan submission to the Department for Transport.
4.2 A sum of £10,000 was allocated for Gosport in 2003/04. In addition, developer funding was allocated which enabled cycleway lighting enhancements to be carried out between Whitworth Road and Holbrook. These works are referred to in the Street Lighting report and are substantially complete.
5. Other Works
5.1 Hampshire Highways Gosport has carried out design and supervision on other schemes during the current financial year funded by developers, Groundworks Trust and for the Regeneration of Older Urban Areas programme. These are set out on Appendix 3.
Recommendation
That this report be noted.
Section 100 D - Local Government Act 1972 - background papers | |
The following documents disclose facts or matters on which this report, or an important part of it, is based and has been relied upon to a material extent in the preparation of this report. | |
NB the list excludes: | |
1. |
Published works. |
2. |
Documents which disclose exempt or confidential information as defined in the Act. |
TITLE |
LOCATION |
None. |
8388/AP
GOSPORT
APPENDIX 1
2003/2004 |
Percentage Committed (Sep) | ||
Original Allocation |
Revised Allocation |
||
Revenue Budget 2002/03 |
|||
Routine Maintenance (carriageway, footway repairs) |
126,000 |
112,000 |
30 |
Gully Cleansing |
4,000 |
4,000 |
50 |
Aids to Movement (signs and road markings) |
40,000 |
40,000 |
50 |
Traffic Management TROs (GBC) |
7,000 |
7,000 |
30 |
Environmental (grass, trees, shrubs) (GBC) |
81,000 |
81,000 |
50 |
Weed Control (GBC) |
26,000 |
26,000 |
50 |
Hazard Clearance |
10,000 |
24,000 |
50 |
Total |
294,000 |
294,000 |
43 |
Capital Budget 2002/03 Principal Roads |
|||
Principal Roads Routine Structural Repairs |
6,000 |
6,000 |
50 |
Principal Roads Special Maintenance |
47,000 |
47,000 |
40 |
Principal Roads Resurfacing |
Nil |
Nil |
0 |
Total |
53,000 |
53,000 |
41 |
Capital Budget 2002/03 Non-Principal Roads |
|||
Non-Principal Roads Routine Structural Repairs |
229,000 |
229,000 |
70 |
Non-Principal Roads Special Maintenance |
237,000 |
237,000 |
36 |
Additional footway works |
63,000 |
63,000 |
0 |
Non-Principal Roads Resurfacing |
185,000 |
185,000 |
75 |
Non-Principal Roads Tactile Paving Crossing Points |
14,000 |
14,000 |
80 |
Total |
728,000 |
728,000 |
55 |
Total Maintenance Budget Allocation Gosport |
1,075,000 |
1,075,000 |
51 |
APPENDIX 2
SPECIAL MAINTENANCE PROGRAMME 2003-2004 | ||||
Gosport |
|
Estimate |
Start |
Finish |
Footway/Kerbing -Principal Roads |
|
|||
Forton Road |
South side Bedford Street to Anns Hill Road |
6,400 |
Complete |
|
Fareham Road |
West side - bus stop adjacent Fraser Road |
8,600 |
Complete |
|
Fareham Road |
East side - Hoeford |
3,300 |
Complete |
|
Drainage - Principal Roads |
||||
Fareham Road |
Near Holbrook |
14,000 |
Nov |
Dec |
Fareham Road |
Near Brockhurst roundabout |
15,000 |
Nov |
Dec |
Footway/Kerbing |
||||
Military Road |
East side near footbridge |
2,800 |
Complete |
|
Bury Road |
Near Bury Crescent |
6,500 |
Complete |
|
Wootton Road |
East side 14 - 72, west side 57 - 65 |
67,000 |
Nov |
Jan |
Sherwood Road |
East side |
22,000 |
Complete |
|
Lyndhurst Road |
East side |
18,000 |
Complete |
|
Peel Road |
Both sides - Grove Avenue to Strathmore Road |
21,500 |
Ongoing |
|
Tichborne Way |
Both sides of Tichborne Arch |
26,000 |
Complete |
|
Marine Parade East |
North side Woburn Court to Queens Road |
5,000 |
Nov |
Nov |
Long Drive |
49 - 100 |
27,000 |
Complete |
|
Additional Footway |
||||
Portsmouth Road |
North side 56 - 112, 184 - 190 |
63,000 |
Nov |
Dec |
Estimate |
Start |
Finish | ||
Tactile Paving |
||||
Various locations |
14,000 |
Apr |
March | |
Carriageway Resurfacing |
||||
Walton Road |
Entire Road |
42,000 |
Complete |
|
St Andrews Road |
Rear access 2 - 22 |
9,000 |
Complete |
|
Kingston Road |
Rear access 31 to Middlecroft Road |
22,000 |
Nov |
Nov |
Elson Road |
Brockhurst roundabout to 21a |
38,000 |
Complete |
|
Rowner Road |
Rowner Lane east - 69 Charden Road |
93,000 |
Complete |
|
Group 2 Carriageway Surface Dressing |
||||
Mumby Road |
Harbour Road to Ferry |
Complete |
||
Group 3 Carriageway Surface Dressing |
||||
Eastbourne Avenue |
Whole length |
Complete |
||
Mill Pond Road |
Whole length |
Complete |
||
Fieldmore Road |
Whole length |
Complete |
||
Brewers Lane |
Whole length |
Complete |
||
Dayshes Close |
Whole length |
Complete |
||
St Lukes Road |
Whole length |
Complete |
||
Stoners Close |
Whole length |
Complete |
||
Coulmere Road |
Whole length |
Complete |
||
Pettycott Crescent |
Whole length |
Complete |
||
Maple Close |
Whole length |
Complete |
||
Northcott Close |
Whole length |
Complete |
||
Tribe Road |
Whole length |
Complete |
||
Skipper Way |
Whole length |
Complete |
||
Harcourt Road |
Whole length |
Complete |
||
Green Lane |
Whole length |
Complete |
||
Lyndhurst Road |
Whole length |
Complete |
||
Cheyne Way |
Whole length |
Complete |
||
Rowan Close |
Whole length |
Complete |
||
Cherry Close |
Whole length |
Complete |
||
South Place |
Whole length |
Complete |
||
Milvil Road |
Whole length |
Complete |
||
Virginia Park Road |
Whole length |
Complete |
||
Richmond Road |
Whole length |
Complete |
||
Shackleton Road |
Whole length |
Complete |
||
Clanwilliam Road |
Whole length |
Complete |
||
Tedder Road |
Whole length |
Complete |
||
Carlyle Road |
Whole length |
Complete |
||
Rowner Close |
Whole length |
Complete |
||
Ham Lane |
Whole length |
Complete |
||
Grange Close |
Whole length |
Complete |
||
Gregson Avenue |
Whole length |
Complete |
||
Meadow Walk |
Whole length |
Complete |
||
Richmond Road Gosport |
Whole length |
Complete |
||
St Thomas's Road |
Whole length |
Complete |
||
Fisgard Road |
Whole length |
Complete |
||
Shaftesbury Road |
Whole length |
Complete |
||
Selsey Avenue |
Whole length |
Complete |
||
Camp Road |
Whole length |
Complete |
||
Footway Surface Dressing |
||||
Hastings Avenue |
Whole length |
Complete |
||
School Road |
Whole length |
Complete |
||
Selsey Avenue |
Whole length |
Complete |
||
Worthing Avenue |
Whole length |
Complete |
||
Bournemouth Avenue |
Whole length |
Complete |
||
Sedgeley Road |
Whole length |
Complete |
||
Elson Lane |
Whole length |
Complete |
||
Exmouth Road |
Whole length |
Complete |
||
Richard Grove |
Whole length |
Complete |
||
Wandesford Place |
Whole length |
Complete |
||
Ham Lane |
Whole length |
Complete |
||
Stanley Place |
Whole length |
Complete |
||
Goodwood Close |
Whole length |
Complete |
||
Goodwood Road |
Whole length |
Complete |
||
Grove Road |
Whole length |
Complete |
||
Palmyra Road |
Whole length |
Complete |
||
Dunkeld Road |
Whole length |
Complete |
||
Grange Crescent |
Whole length |
Complete |
||
Northcroft Road |
Whole length |
Complete |
||
Clyde Road |
Whole length |
Complete |
||
Virginia Park Road |
Whole length |
Complete |
||
APPENDIX 3
Developer Funded Road Improvements
Frater Gate traffic signals and junction improvements - supervision (S278)
Gunners Way/Heritage Way Industrial area junction - supervision (S278)
Whites Place Improvements on Frater Road and sewer works for £35,000
new surgery
Ferrol Road/Forton Road/Parham Road development - footway works £8,000
Regeneration of Older Urban Areas
Stoke Road - Peel Road to Elmhurst Road - design and supervision £100,000
Groundworks Trust
Crossways - Mill Pond Road to Forton Road Improvements £30,000
and landscape features