Upgrading Existing Building
Outline Specification
1. New Kitchen (ex studio) and Back-bone corridor
Brick up existing access door to Lounge Area
Brick up Bar / Servery wall
Install new door
Remove existing door and surrounding brickwork in corridor
Break through existing cupboard and surrounding brickwork in corridor
Fit new door to Storage Area
Construct studding and plasterboard wall to kitchen and possible seating area
Install floor finishes
Install commercial standard kitchen equipment and units / fitments, services, etc.
Painting as necessary and tile surfaces
2. New Meeting Room (existing Kitchen)
Remove kitchen equipment, units, services, tiling etc.
Remove existing vinyl flooring
Break through wall to Back-bone corridor and install door and frame
Brick up existing door to lounge area
Install floor finish
Install skirting boards?
Renew electrics
Paint and decorate, render as necessary
3. Disabled / Unisex Toilet Facility
Remove all existing sanitary units, partitions, wash handbasin, etc. (leave butler's sink?) and floor finish
Paint and decorate
Modify electrics as necessary
Install new disabled toilet facilities (with specialist assistance)
Install new floor finish
4. Emergency Entrance (St. James)
Front door to be outward opening and fitted with crash bar
Construct outside ramp approx 25mm Tarmac
Paint and decorate
5. Doorway - Assembly Room to Lumley Area
Brick up door, surround / arch
Replace existing door with two doors to create soundproof access
6. Convert existing Disabled Toilet to Storage Facility
Remove existing toiletry, fittings - seal services and make good
Provide shelving
7. Storage Area / Mezzanine Floor
Reduce height of existing internal walls to suit new mezzanine floor
Install mezzanine floor timbers and boarding, including access stairway / handrailing
Renew and install lower level lighting and adjust existing lighting
Refurbishment of existing storage rooms as necessary
8. Brick Existing External Access Doors to Courtyard
Review later - 2004
9. Lumley Seating Area / Servery
Refurbishment tea / coffee facility as necessary
Install new floor finish, to be decided (continuous vinyl flooring or carpet)
Paint and decorate surrounding area
10. New Main Access (Existing Emergency Access)
Replace existing outer doors with double glazed heavy duty UPVC (Brown)
11. Existing Lumley Area Toilets
Refurbish as necessary in 2004
12. General Paint and Decorate Centre
On phased basis, subject to income