Buildings, Land and Contracts Panel Item 16 9 December 2003
Executive Member - Policy and Resources 11 December 2003
Procurement and Project Initiatives Report by the Director of Property, Business and Regulatory Services |
Contact: Andrew Smith Ext: 7826 e-mail: [email protected]
Section 100D - Local Government Act 1972 - Background Papers:
The following documents disclose facts or matters on which this report, or an important part of it, is based and has been relied upon to a material extent in the preparation of this report.
NB the list excludes:
1. Published works.
2. Documents which disclose exempt or confidential information as defined in the Act.
File Location
None.
BLCP1203D
Appendix 1
Procurement Proposals 2003/2004
Further Initiatives
1 Rookwood School - Fire Damage Reinstatement, Recladding and Alterations (£787,000)
The procurement proposal for this project was approved by the Executive Member Policy and Resources at his meeting of 13 November 2003. In the report it was proposed that in order to make safe the buildings and commence reinstatement, Tew Brothers should be engaged to undertake the works. It was also noted that Tew Brothers had recently successfully undertaken similar work at Thornden School.
This project has now further developed and will include external recladding, repairs and internal conversion work so that the building will be suitable for the Hampshire Music Service, who currently occupy a number of temporary buildings in Bereweeke Road and the Youth Service. There is a need to vacate the Bereweeke Road site as soon as possible to allow construction of an Early Years unit using Sure Start funding which must be spent by August 2004. The estimate for this further work is £570,000 and will be funded as follows:
Policy and Resources |
Education | |
Fire damage reinstatement |
£166,000 |
|
Capital Repairs |
£333,000 |
£71,000 |
£499,000 |
£71,000 |
The reason for proposing that Tew Brothers undertake the extended project is that the phases of the work will need to overlap. The current contract is due to complete in mid February 2004 and the new contract is due to commence at the beginning of January 2004 to facilitate completion by April 2004. This will enable the works on the new Early Years Centre to start in earnest and meet the DfES spending profile for that project.
2. Aldershot Park Primary School - Early Years Centre (£609,000)
The scheme incorporates extensions to form an Early Years Centre and internal alterations to the School to facilitate temporary arrangements at the above school. The internal alterations need to be completed before January 2004 and main works need to be completed before September 2004.
The Contractor proposed, Gregory Havant Ltd, has the capacity and experience to assist in the design development and achieve the required programme. It is proposed to negotiate based on recent successfully completed contracts by the same contractor with the major sub-contract packages competitively tendered. The project appraisal is elsewhere on the agenda.
3. Priestlands Secondary School - Proposed Music/Drama Facility and extension to Dining Facilities (£1.28m)
It is proposed to undertake this project with Mansell plc, the successful tenderer for the Sports Lottery development project, which is about to proceed to construction stage (subject to formal lottery approval). The programmes for both schemes require that the projects overlap and it would be inappropriate from a health and safety aspect to have two contractors undertaking major works on the site at the same time.
The proposed negotiation will be based on the competitive tender for the sports project and subcontract tendering as appropriate. Engaging with this contractor in this way will achieve earliest cost certainty and completion, minimize the period of disruption and achieve economies of scale. Mansell plc are involved with the Framework for major schemes and it is also proposed that this project is linked to these arrangements. The project appraisal for this scheme appears elsewhere on the agenda.
4 Eggars School, Alton - New IT Classroom block and Sports Hall (£1.846m)
A framework contractor is about to be appointed for a nearby project at Amery Hill following a competitive tendering process. It is proposed to combine this scheme with the project at Eggars as there are potential benefits in terms of sharing management costs, re-use of excavated material and economies of scale by packaging the work for both schemes. The contractor Mowlem can also provide design resources to assist with the development of the scheme. The procurement method proposed for this project is on the basis of a managed two stage develop and construct approach linked to the Framework for major schemes. The project appraisal for this scheme appears elsewhere on the agenda.
5. Electrical Installation Testing & Inspection Programme (£100,000)
The intention to procure Electrical Safety Programmes work on the basis of negotiated packages was reported to the Executive Member Policy and Resources at his meeting of 13 November 2003. In order to progress Testing and Inspection work it is proposed to negotiate a further £100,000 of work with Caradas Technical Services Ltd for the 2003/2004 programme. This contractor has performed well with previous inspection works which were won in competition and the prices obtained can be used as a basis for these negotiations. This work will be funded from provision within the capital repairs budget for work relating to the corporate risk assessment.
6. Alton Day Services (£969,000)
This scheme has had to be reviewed following a competitive tendering process which resulted in costs in excess of the available budget. The lowest tender was submitted by Bensons, who are a preferred contractor with considerable experience of successfully delivering major projects for the County Council. In order to avoid further delay, utilise key components of the completive tender, and achieve early certainty in terms of programme and cost, it is proposed to negotiate the revised scheme with Bensons. The revised tender will also be based upon an element of new sub contract tendering for certain redesigned specialist work.
7. Hamble Community College - Replacement Youth Building and re roofing and refurbishment of the Newbold Block (£670,000)
Two further schemes are proposed at the Hamble Community College as above. The first project, the new Youth Club Building is to be funded from the Education Capital Programme for 2003/04, and the second is to be funded from NDS condition money and Capital Repairs for 2004/05. These works need to be completed by August 2004.
It is proposed to undertake these works with Bensons who have recently been appointed to undertake the new Gymnasium and conversion of existing accommodation at Hamble following a competitive tender process. The programmes for both schemes require that the projects overlap and it would be inappropriate from a health and safety aspect to have two contractors undertaking major works on the site at the same time. The proposed negotiation will be based on the competitive tender for the sports project and subcontract tendering as appropriate.
8. Building Control Service - Appointment of Approved Inspector
In accordance with E.U. directives relating to the award of public service contracts the department has recently completed the selection process for the provision of building control services.
Compliant Bids were received from four organisations and each one was given a formal interview that considered the quality of:
o managerial, professional and technical human resources
o capacity to manage workload
o arrangements for covering the whole Country
o fee scales
o customer skills
o added value i.e ancillary professional support services
o experience as Approved Inspectors
Butler and Young emerged as the preferred candidate based on a number of issues in particular:
o proven track record of delivering framework type contracts
o thorough experience of specific regulatory standards relating to a largely education orientated programme
o capacity to absorb and manage a potentially diverse and fluctuating workload
o currently operating an effective system that is geographically appropriate to the County Council's needs
o ability to deliver significant added value in the areas of training and professional development.
Representations on behalf of the District Councils who applied as a consortium have been received. While understanding their disappointment it is recommended that the work be allocated to Butler and Young. A formal response to their representations is being made.
9. Serles House, Winchester - Phase II
The contract to repair and refurbish Serles House commenced in the summer and includes essential fabric repairs and work to allow for occupation of the first floor. Design work to define the proposals to allow for the occupation of the second floor and remaining fabric repairs has been completed. It is now proposed to negotiate this additional work with the main contractor, Richardsons, at an estimated cost of £200,000 to be funded from the Policy and Resources landlord's minor works budget. It is expected that the work can be contained within the original project timescale and be completed by the summer of next year.
Appendix 2
Electronic Tendering Pilot | |
The County Council's Corporate Procurement Strategy includes an action under `e-procurement, information technology and modernisation' that the County Council will undertake an e-tendering pilot during 2003/04. To achieve this it is proposed that County Supplies run an e-tendering pilot for six months starting in December 2003. The pilot will be evaluated to identify whether e-tendering will provide benefit to, and added value for, the County Council and whether or not it should be extended to other areas of the County Council, and the relative priority of such work. | |
E-tendering provides automation of the tendering process, by using secure electronic email and internet facilities for the exchange of tender documentation and questions and answers between the County Council and tenderers. There are also facilities for assisting in the automatic evaluation of basic selection and award criteria. | |
There are a number of potential suppliers of e-tendering systems and a recent tendering exercise has selected a preferred supplier to run the pilot at County Supplies for a very reasonable cost of up to £6,000. This supplier has good experience of the working with other local authorities and universities. | |
E-tendering is promoted in the National Procurement Strategy for Local Government and forms part of the Implementing Electronic Government 2005 targets. E-tendering is also part of the National e-Procurement Project (NePP), which is run by local authorities and funded by the ODPM. The use of e-tendering is seen as a means of reducing transaction costs in procurement, streamlining, and reducing the time taken to complete, the tendering process. The Office of Government Commerce (OGC) is actively promoting the use of e-tendering in central government and has issued best practice guidance on its use. The new EU procurement directives, which are expected to be adopted next year, also makes provision for e-tendering. | |
Scope and Impact of E-Tendering | |
The pilot will be used to tender up to six contracts managed by County Supplies. The specific contracts have not yet been identified but are expected to cover a broad range of supplies, services and contract values to ensure that the pilot is as meaningful and useful as possible. The pilot is overseen by a project team with representatives from County Supplies, Legal Practice, Audit and IT Services. | |
It is expected that we will not be able, at this stage, to insist that all potential tenderers will use the e-tendering facility for the pilot contracts and that there may be a dual process of using both electronic and paper based tendering. | |
Appendix 3
Project Issues | |
1 |
Winchester and Eastleigh Special Schools |
1.1 |
Initial bids for the land receipt at Lankhills were reported to the Executive Member Policy & Resources on 11 September 2003. Since that time, officers have been undertaking further work to assess the financial implications of the infrastructure and associated statutory and planning requirements that would be a charge to the gross offers. Members should be aware also that there have been infrastructure costs incurred to date that would also be a call on this money, including highway infrastructure, demolitions and archaeological investigations. The project cost limit is defined by the capital receipt. As with the recently completed John Hanson Secondary School at Andover, the scope of the works has been determined by forecasts of the likely receipt. |
1.2 |
The negotiations with the preferred bidder and statutory authorities are not yet complete but an assessment has been undertaken recently on the potential impact to and range of the available receipt. |
1.3 |
The building projects are now complete and occupied by the Schools. There have been some additional costs that have occurred since the contract was let and were unavoidable. The first of these was the discovery of unknown basements at the Lankhills site, previously reported to the Executive Member Education as part of regular Major Projects Reports. However, the full financial implications were not known until near the end of the project. The cost of this additional work, including the contractor's management costs as a result of significant delay, is in the order of £300,000, which can be offset against the capital receipt. Secondly, it was anticipated at the time of tender that savings would be made during the contract to bring the cost back in line with the available funding at the time. However, due to market pressures, including sub-contractor inflation costs, a 3% premium has been incurred on the contract sum and agreed with the contractor. The cost of these items has been factored into the current financial reconciliation assessment. |
1.4 |
Members should note that the current estimated financial position is dependent upon the resolution of final negotiations on both the development site and on the settlement of the final account with the building contractor. |
1.5 |
After having completed a financial assessment, the estimate of capital receipt remaining ranges between £650,000 and £1,150,000 after deduction of all costs incurred on the building project. |
1.6 |
There are other costs (e.g. furniture) that also need to be considered as potential calls against the final assessment. |