Hampshire County Council

Gosport Highway and Transport Advisory Panel

23 March 2004

Highway Maintenance Programmes 2003/04 and 2004/05

Report of the Director of Environment

Item 7

Contact: Andrew Peryer, tel 02392 546417 email: [email protected]

1. Summary

1.1 This report outlines:

      (i) progress with the 2003/04 Highway Maintenance Programme;

      (ii) details of the 2004/05 Highway Maintenance Budget; and

      (iii) details of the 2004/05 Highway Maintenance Programme.

2. Background

2.1 Members may be aware that the Highway Maintenance Programme is funded from both revenue and capital allocations.

2.2 The revenue maintenance programme funds minor works such as pothole repairs, routine drainage work including gully cleaning, signs and road markings, environmental maintenance of grass verges, trees and shrubs, weed control and highway emergencies. Minor bridge works and winter maintenance is also funded from revenue. Budget allocations are set at a level that ensures the safety of the highway network.

2.3 The capital maintenance programme funds planned maintenance including special maintenance, resurfacing and surface dressing, and also provides for essential repairs to the structure of the highway.

3. Progress with the 2003/04 Highways Maintenance Programme

      Revenue Maintenance Programme

3.1 The final total allocation for Gosport for 2003/04 is £296,000. Progress throughout the year has been in line with the overall spend profile and it is expected that the programme will be completed within time and budget constraints. A budget monitoring statement is included within Appendix 1.

      Capital Maintenance Programme

3.2 The final total allocation for 2003/04 is £768,000. The programme is nearing completion and, as with the Revenue Maintenance Programme, it is expected that it will be delivered as planned within time and budget constraints. A budget monitoring statement is included within Appendix 1.

3.3 A status report detailing progress of all special maintenance, resurfacing and surface dressing schemes is attached as Appendix 2.

4. Highway Maintenance Budget 2004/05

4.1 The Highway Maintenance budget for 2004/05 approved by the Executive Member for Environment, is £51,461,000. This sum comprises £21,232,000 revenue funding and £30,229,000 funding from the Capital Programme provision. This includes an additional £3.5 million to help address the backlog within highway maintenance programmes.

4.2 The revenue budget allocation has generally been maintained at a similar level to 2003/04, however the district managed grass trees and shrubs budget has been significantly enhanced.

4.3 Central Government funding achieved through the Local Transport Plan (LTP) process has increased and locally resourced capital funding has also been maintained at 2003/04 levels. It should be noted that maintenance funding allocated through the LTP process is directly related to the condition of Hampshire's road network, and future levels of funding are dependent on the County Council's ability to improve the overall condition of the network. This increased allocation for planned maintenance has provided the opportunity to target funding at the more vulnerable areas of the network. In Gosport this will be targeted at footways by carrying out reconstruction and surface dressing as appropriate and some carriageway resurfacing.

4.4 A further programme to target urban footways to maintain accessibility and improve standards, reducing the potential for claims, has been included. The unclassified road network remains in a poor condition as a result of the flooding in 2000/01 and further severe damage due to clay shrinkage occurred during the dry summer in 2003, requiring a sustained, enhanced level of funding to recover.

5. Highway Maintenance Programme 2004/05

    Revenue Maintenance Programme

5.1 The revenue maintenance programme funds three main areas of highway maintenance:

      (i) reactionary minor repair works on the road and footway network;

      (ii) minor traffic management improvements of signs and road markings; and

      (iii) environmental aspects of highway maintenance, including grass cutting, weed treatment and tree and shrub maintenance.

5.2 The total allocation for Gosport for 2004/05 is £340,000. The allocations for 2004/05 are set out in Appendix 3.

5.3 Additional revenue budgets are held centrally for the performance elements of the County Council's term maintenance contract. The performance based work contained in the contract includes:

    (i) gully emptying;

    (ii) visibility splay grass cutting;

    (iii) winter maintenance; and

    (iv) routine bridge maintenance.

    Capital Maintenance Programme

5.4 The funding allocation for the capital maintenance programme is based on the HAMP rating system and will reflect the agreed intervention levels. The HAMP rating intervention level directs funding to those maintenance schemes displaying a higher `maintenance need'. Therefore, the funding allocation within the borough for the 2004/05 capital maintenance programme will differ from the 2003/04 allocation.

5.5 Planned structural maintenance repairs undertaken through the capital maintenance programme include surface dressing, special maintenance and resurfacing schemes. A provisional list of schemes under each of these headings for 2004/05 is attached as Appendix 4. Schemes which have been funded from the additional £3.5 million funding have been indicated by an asterisk*.

5.6 The capital maintenance programme also supports the centrally controlled areas of work, including major maintenance schemes and bridge maintenance.

Recommendation

That Members note the progress made on the transport capital programme schemes for 2003/04 and support the schemes approved for inclusion in the capital programme for 2004/05.

Section 100 D - Local Government Act 1972 - background papers

The following documents disclose facts or matters on which this report, or an important part of it, is based and has been relied upon to a material extent in the preparation of this report.

NB the list excludes:

1.

Published works.

2.

Documents which disclose exempt or confidential information as defined in the Act.

TITLE

LOCATION

None.

8624/AP

APPENDIX 1

GOSPORT

Revenue and Capital Budget Monitoring Statement

2003/04

Percentage

Committed

(Jan)

Original

Amended

Revenue Budget 2003/04

Routine Maintenance (carriageway, footway repairs)

121,000

138,000

85

Gully Cleansing

4,000

4,000

50

Aids to Movement - maintenance

40,000

40,000

85

      - new (Gosport Borough Council)

5,000

8,000

85

Traffic Management TROs (Gosport Borough Council)

7,000

7,000

90

Environmental - grass, shrubs, trees (Gosport

Borough Council)

53,000

53,000

83

Weed Control

26,000

26,000

83

Hazard Clearance

10,000

20,000

100

Total

266,000

296,000

85

Capital Budget 2003/04

Principal Roads

Principal Roads Routine Structural Repairs

6,000

6,000

150

Principal Roads Special Maintenance

47,000

47,000

100

Principal Roads Resurfacing

-

-

-

Total

53,000

53,000

106

Capital Budget 2003/04

Non-Principal Roads

Non-Principal Roads Routine Structural Repairs

216,000

279,000

100

Non-Principal Roads Special Maintenance

240,000

240,000

75

Non-Principal Roads Resurfacing

185,000

235,000

85

Non-Principal Roads Tactile Paving Crossing Points

14,000

14,000

100

Total

655,000

768,000

88

Footway Maintenance additional funding

60,000

60,000

10

Total Maintenance Budget Allocation Gosport

1,034,000

1,177,000

84

APPENDIX 2

Status of all Special Maintenance, Resurfacing and

Surface Dressing Schemes

AREA SOUTH

   

Gosport

 

Estimate

Start

Finish

Principal Roads

       

Forton Road

South side - Bedford Street to Anns Hill Road

6,400

Complete

Fareham Road

West Side bus stop adjacent Fraser Road

8,600

Complete

Fareham Road

East side at Hoeford on Borough boundary

3,300

Complete

Fareham Road

Various near Holbrook

14,000

Complete

Fareham Road

Various near Brockhurst Roundabout

15,000

Complete

Drainage

       

Galemoor Avenue

O/S Whitecliff Court to 38

21,000

Feb

Mar

Footways

       

Military Road

New north footbridge l/c 40 east side

2,800

Complete

Bury Road

Junction Bury Crescent to 18 Bury Road

6,500

Complete

Wootton Road

West side 57 - 65

11,200

Complete

Wootton Road

East side 14 - 72

56,000

Complete

Sherwood Road

East side full length

21,700

Complete

Lyndhurst Road

East side full length

18,200

Complete

Peel Road

Both sides Grove Avenue to Strathmore Road

21,500

Complete

Tichborne Way

Both sides Tichborne Arch

26,000

Complete

Marine Parade East

North side from Woburn Court Car Park to Queens Road

5,000

Feb

Mar

Long Drive

49 - 100

27,000

Complete

Avery Lane Spur

Side of 64 and 66

5,000

Complete

Resurfacing

       

Walton Road

Entire road

42,000

Complete

St Andrews Road

Entire road

9,000

Complete

Kingston Road

Rear access 31 to Middlecroft Road

22,000

Feb

Mar

Elson Road

Brockhurst roundabout to 21a

38,000

Complete

Rowner Road

From Rowner Lane East to adjacent 69 Charden Road

73,400

Complete

Tactile Paving

       

Various Locations

Various

14,000

Complete

 

Additional Footway Works

       

Portsmouth Road

North side 56 - 112

73,000

Feb

Mar

 

Group 2 Carriageway Surface Dressing

       

Mumby Road

Near Harbour Road

 

Complete

Group 3 Carriageway Surface Dressing

     

Eastbourne Avenue

   

Complete

Mill Pond Road

   

Complete

Fieldmore Road

   

Complete

Brewers Lane

   

Complete

Dayshes Close

   

Complete

St Lukes Road

   

Complete

Stoners Close

   

Complete

Coulmere Road

   

Complete

Pettycott Crescent

   

Complete

Maple Close

   

Complete

Northcott Close

   

Complete

Tribe Road

   

Complete

Skipper Way

   

Complete

Harcourt Road

   

Complete

Green Lane

   

Complete

Lyndhurst Road

   

Complete

Cheyne Way

   

Complete

Rowan Close

   

Complete

Cherry Close

   

Complete

South Place

   

Complete

Milvil Road

   

Complete

Virginia Park Road

   

Complete

Richmond Road

   

Complete

Shackleton Road

   

Complete

Clanwilliam Road

   

Complete

Tedder Road

   

Complete

Carlyle Road

   

Complete

Rowner Close

   

Complete

Ham Lane

   

Complete

Grange Close

   

Complete

Gregson Avenue

   

Complete

Meadow Walk

   

Complete

Richmond Road (Gosport)

   

Complete

St Thomas's Road

   

Complete

Fisgard Road

   

Complete

Shaftesbury Road

   

Complete

Selsey Avenue

   

Complete

Camp Road

   

Complete

Footway Surface Dressing

     

Hastings Avenue

   

Complete

Worthing Avenue

   

Complete

School Road

   

Complete

Selsey Avenue

   

Complete

Bournemouth Avenue

   

Complete

Sedgeley Road

   

Complete

Elson Lane

   

Complete

Exmouth Road

   

Complete

Richard Grove

   

Complete

Wandesford Place

   

Complete

Ham Lane

   

Complete

Stanley Close

   

Complete

Goodwood Close

   

Complete

Goodwood Road

   

Complete

Grove Road

   

Complete

Palmyra Road

   

Complete

Dunkeld Road

   

Complete

Grange Crescent

   

Complete

Northcroft Road

   

Complete

Clyde Road

   

Complete

Virginia Park Road

   

Complete

APPENDIX 3

GOSPORT

Revenue and Capital Allocation 2004/05

2003/04

2004/05

Revenue Budget 2004/05

Routine Maintenance (carriageway, footway repairs)

121,000

127,000

Gully Cleansing

4,000

5,000

Aids to Movement - maintenance

40,000

41,000

      - new (Gosport Borough Council)

5,000

5,000

Traffic Management TROs (Gosport Borough Council)

7,000

8,000

Environmental - grass, shrubs, Trees(Gosport Borough

Council)

53,000

89,000

Weed Control

26,000

28,000

Hazard Clearance

10,000

37,000

Total

266,000

340,000

Capital Budget 2004/05

Principal Roads

Principal Roads Routine Structural Repairs

6,000

7,000

Principal Roads Special Maintenance

47,000

-

Principal Roads Resurfacing

-

-

Total

53,000

7,000

Capital Budget 2004/05

Non Principal Roads

Non Principal Roads Routine Structural Repairs

216,000

221,000

Non Principal Roads Special Maintenance

240,000

177,200

Non Principal Roads Resurfacing

185,000

266,000

Non Principal Roads Tactile Paving Crossing Points

14,000

14,000

Total

655,000

678,200

Footway maintenance additional funding

60,000

48,500

Resurfacing additional funding

19,800

Total additional funding

60,000

68,300

Total Maintenance Budget Allocation Gosport

1,034,000

1,093,500

APPENDIX 4

PROVISIONAL SPECIAL MAINTENANCE PROGRAMME 2004/2005

Gosport

Drainage

 

Estimate

Rating

Leesland Road

O/s 10 to junction Lees Lane

15k

223

Tukes Avenue

Rear of 192 to rear of 181

27.6k

149

Footway/Kerbing

 

South Street

North side from Computer Quote to loading road

3.3k

431

Crescent Road

50 metres north-west of Admiralty Cottage to opposite junction with Marks Road

4.3k

284

Crescent Road

Admiralty Cottage to 50 metres north-west

4.3k

145

Portal Road

Side of 9 to number 15

8k

230

Portal Road

Side of 24 to Nobes Avenue

8k

151

Portal Road

O/s 15 to o/s 24

8k

137

St Marks Road

Junction of Crescent Road to junction The Lane

5.8k

218

Brighton Avenue

O/s 53 to o/s 69

4.1k

147

Brighton Avenue

O/s 71 to junction Eastbourne Avenue

3.6k

100

Copse Lane

From l/c 4 to l/c 3

2.9k

144

Copse Lane

Junction The Spinney to l/col3

2.6k

113

Carlyle Road

Whole Length-north side

5.4k

137

Elmore Avenue

O/s 65 to o/s 73

4.8k

137

Lyndhurst Road

Junction Carnarvon Road to end of cul de sac

16.7k

133

Broomfield Crescent

o/s 1 to o/s 3

2.5k

131

Broomfield Crescent

o/s 21 to o/s 25

2.6k

131

Broomfield Crescent

O/s 48 to o/s 19

6k

131

Turner Avenue

Side of 105 to o/s 103

2.7k

131

Turner Avenue

Opposite 25 to opposite 27

2.7k

115

Elmore Road

o/s 55 to o/s 67

4.2k

129

Skipper Way

o/s 63 to o/s 93

6.7k

127

Skipper Way

o/s 19 to o/s 33

6.9k

125

Skipper Way

o/s flats 11-15 to o/s 19

3.6k

117

Selsey Avenue

o/s 11 to o/s 41

5.9k

125

Selsey Avenue

o/s 18 to o/s 48

6.2k

121

Selsey Avenue

o/s 41 to o/s 67

5.8k

121

Selsey Avenue

Junction Elson Road to o/s 18

6.1k

118

Selsey Avenue

o/s 48 to o/s 80

6.5k

114

Testcombe Road

Side of 11 Anglesey Road to l/c 2 Testcombe Road

5.2k

124

Testcombe Road

L/c 72 to o/s 38

5k

112

Torquay Avenue

Junction Eastbourne Avenue to o/s 16 Torquay Avenue

5.3k

122

Torquay Avenue

Junction Eastbourne Avenue to o/s 13 Torquay Avenue

5.3k

111

Battery Close

Rear of 1 Beryl Avenue to garages

5.8k

999

Additional Funded Footway/Kerbing

*Crescent Road

Junction St Marks Road to l/c 10 at school

4.3k

108

*Skipper Way

Junction Elmore Avenue to o/s flats 11 and 15

3.3k

109

*Testcombe Road

L/c 2 to o/s 10

4.1k

109

*Testcombe Road

o/s 9 to o/s 19

4.1k

101

*Layton Road

Side of 39 to side of 73

9.5k

110

*St Nicholas Avenue

Junction Vanstone Road

5.4k

106

*Rowan Close

Junction Elmore Road to o/s 12 Rowan Close

3.3k

103

*Little Green Orchard

o/s 1 to o/s 4

3.4k

102

*St Nicholas Avenue

Junction Ayling Close to junction Dampier Close

4.3k

101

*Military Road

100 metres north opposite l/c 50 to 50 metres further north

3k

100

Carriageway Resurfacing

Zetland Road

r/o 10 to end of alleyway (r/access)

16.2k

223

Zetland Road

Junction Zetland Road to r/o 10 (r/access)

8k

218

Endeavour Close

Junction Willis Road to side 7 Shamrock Close

19k

149

Anglesey Road

Junction Anglesey Road to junction Foster Road

14.5k

125

Elson Road

Side of 173 Elson Road to o/s Red Cross Centre

22.2k

123

Nimrod Drive

Entrance to car park to entrance of school

14.5k

119

Harbour Road

Mumby Road to Harbour and Spur

18.3k

87

San Diego Road

Junction St Vincent Road West to junction St Vincent Road East

33.4k

82

Grove Road

Junction Grove Road to junction Green Lane (Roundabout)

12.9k

86

Gomer Lane

Stokes Bay Road junction to Browndown Road

50k

82

Green Crescent

From 67 to junction Rowner Lane

80k

82

Green Crescent

From junction of Beauchamp Avenue to 33

70k

85

Additional funded Carriageway Resurfacing

*Anns Hill Road

O/s 238 to hospital entrance

13k

83

Group 2 Carriageway Surface Dressing

Carisbrooke Road

Junction Totland Road to Rowner traffic lights

St Nicholas Avenue

Junction Rowner Road to Shackleton Road

Manor Way

Junction Grove Road to l/c 17

St Nicholas Avenue

Junction Shackleton Road to Broomfield Crescent

St Nicholas Avenue

Broomfield to Rowallen

Clayhall Road

Junction Anglesey Road to junction Leep Lane

Group 3 Carriageway Surface Dressing

Dell Quay Close

Whole length

Wilton Close

Junction Greyshott Road to end of cul de sac

Goodwood Close

Junction Goodwood Road to end

Acorn Close

Junction Tichborne Way to end

Morris Close

Junction Wych Lane to end

Cavanna Close

Junction Carisbrooke Road to end

Battenburg Close

Junction Avenue Road to junction Queens Road

Mallard Gardens

Junction The Curve to end of road

Chantry Road

Junction Brockhurst Road to junction Palmyra Road

Albatross Walk

Junction The Curve to End

Bramble Way

Junction The Curve to End

Glebe Drive

Junction Gorran Avenue to End

Russell Road

Junction The High Street to junction Leamington Crescent

Leesland Road

Junction Anns Hill Road to junction Whitworth Road

Kings Road

Junction St Andrews Road to junction Queens Road

Queens Road

Junction Stoke Road to junction Kings Road

Fell Drive

Opposite 22 Fell Drive to roundabout

Dunkeld Road

Junction Chantry Road to junction Chantry Road

Footway Surface Dressing

Anns Hill Road

East side Southcroft to shops and Leesland to Norman Road

West side Norman Road to Carnarvon Road

Spring Garden Lane

Forton Road to Stoke Road

Waterloo Road

All

Mabey Close

All

The Redan

East side only

Beach Road

Beach Road to Cambridge Road

Lee High Street

Beach Road to Cambridge Road

Cambridge Road Lee

North side to Marine Parade to Gosport Road and south side Marine Parade to Portsmouth Road

Military Road

A32 to Station Road

St Marks Close

All

Dolphin Crescent

From Alver View including Crossland Close

St Valerie Road

All

Mount Pleasant Road

All

Ash Close

All

Additional funded Footway Surface Dressing-

*Shaftesbury Road

South Street to end of cul de sac

*South Street

Both sides Foster Road to Willis Road and South Side long stay car park to Esplanade

*Beatty Drive

All

*Beech Grove

All

*Avenue Court

All

*Palmyra Road

Bramber Road to Albemarle Avenue