Hampshire County Council

New Forest Transport Strategy Panel

31 March 2004

Capital Programme

Report of the Director of Environment

Item 8

Contact: Jim Soutar, ext 6049 email: jim [email protected]

1. Summary

1.1 This report sets out the finalised Capital Programme for 2004/05, the draft programme for 2005/06 and the preparation pool of schemes to be considered beyond 2005/06, focusing particularly on the New Forest area. The Panel is asked to note the 2004/05 programme and to endorse the 2005/06 draft programme.

2. Integrated Transport Capital Programme

2.1 On 23 January 2004 the Executive Member for Environment agreed the County Council's Environment Capital Programme being submitted to Cabinet on 23 February 2004. The report updated progress on and proposed amendments to the 2003/04 Integrated Transport Programme and set out the proposed Capital Programme for 2004/05 to 2007/08. These programmes were submitted for approval to the County Council on 25 February 2004.

2.2 The Integrated Transport Capital Programme is primarily funded by Government, either through specific grant and credit approvals (for schemes costing over £5 million) or through the general allocation of credit approval in the Local Transport Plan Settlement (for schemes costing less than £5 million). Additional funding is also available for specific schemes from external bodies, primarily contributions associated with major new developments, but in some cases from district councils' own Capital Programmes. Relevant schemes are included in the capital programme when it is anticipated that this external funding (EF) will be available and a scheme is sufficiently developed for implementation. In some cases schemes may be funded through both EF and Government funding.

2.3 On 19 December 2003 notification was received from the Government Office for the South East on its assessment of the County Council's Annual Progress Report submitted in July 2003 and its allocation of resources. The total block allocation is £31.179 million, comprising £15.783 million for integrated transport and £15.396 million for maintenance. This compares with indicative allocations of £13.120 million and £7.893 million respectively, notified in the December 2000 LTP settlement. The integrated transport total includes £900,000 for schemes in the A27 corridor, and reward funding of £1.763 million for the County Council's continued strong performance. A ring fenced allocation for 2004/05 of £7.5 million has also been made for the A3 Bus Priority Corridor which was accepted as a major scheme by the Government on 28 October 2003.

2.4 The new programme has been produced on the basis that, from the £31.2 million available for 2004/05 through the LTP process, £17.3 million will be spent on highway maintenance and bridges, and £13.9 million on integrated transport. In 2005/06 the forecast resource totals are £17 million for highways maintenance and bridges and £14 million for integrated transport. The 2005/06 figures anticipate that the allocations will continue to be well in excess of the previously published indicative allocations for those years (as in 2004/05). The years 2006/07 and 2007/08 will be the first two years of the next five year LTP. For planning purposes it has been assumed that the allocations will be the same as 2005/06. For integrated transport the 2004/05 resources will need to cover expenditure required to complete the 2003/04 and earlier programmes and development costs of post 2004/05 projects, including major schemes as well as the cost of implementing the 2004/05 programme. A 2004/05 starts programme has been approved by the County Council, which will be managed to deliver the required spending during the financial year.

2.5 The new programme is based on the draft programmes presented to the former Area Transport Strategy Panels in autumn 2003. Each scheme was assessed against LTP objectives, the County Council's Corporate Objectives and the Government's ten-year transport objectives of economy, environment, accessibility, safety and integration. These Panels supported the programmes as submitted. However, some additional schemes had been added or brought forward where they are specifically related to the County Council's Public Service Agreement with regard to promoting bus patronage (a total of £4 million) and reducing road accident casualties (a total of £2.6 million). There is also additional funding for the Safer Routes to School Programme (a total of £1.25 million) which was identified as a priority by the Environment Policy Review Committee. In some cases LTP funding has been introduced to supplement schemes which are largely funded from developers' contributions but there is a shortfall. Some schemes have been delayed, either from 2003/04 into 2004/05 or from 2004/05 into 2005/06, because of programme slippage either on that particular scheme or a related project.

2.6 The integrated transport capital programme for the New Forest Transport Strategy area is shown in Appendices 1 to 4. Appendix 1 shows the casualty reduction and county-wide/other programmes for 2004/05 and 2005/06. Details of some county-wide programmes will be subsequently submitted to the Executive Member for Environment for approval. Appendix 2 shows, for information, the 2004/05 programme, and includes the previous strategy areas together with the current status of individual schemes. In some cases the title has been amended as compared to previous reports. These are primarily to clarify matters given that the new programme includes schemes previously reported to the former ten Transport Strategy Panels. Where appropriate details are given in the remarks column. The proposed programme for 2005/06 shown in Appendix 3 is based upon the draft programmes presented to the former Area Panels last autumn. Appendix 4 shows the current list of Preparation Pool schemes. The development of the new LTP for 2006-2011 could lead to significant amendments. This could include proposed deletions of schemes because of poor ratings against objectives and new schemes resulting from the development of the new LTP. A report will be presented to the autumn meeting of the Panel.

National Cycle Route

2.7 The cycle route down the old Brockenhurst to Ringwood railway line has two bridges missing along the Longslade Bottom stretch. The route forms part of the National Cycle Network and means that cyclists have to cycle down embankments that are steep and provide cause for concern regarding safety of the cyclist. A partnership has been formed between Sustrans, the Forestry Commission and Hampshire County Council to reinstate the bridges. The Forestry Commission has agreed to design and build them and enter into a maintenance agreement with Sustrans once the work is complete. The design will support the safe passing of two horses (deck 3.4 metres wide) and will not be suitable for vehicular access. It will also be sympathetic in appearance to the sites and landscape.

2.8 There is an allocation of £10,000 in the Recreational Cycling budget to pay for part of the works, however the estimate is £25,000 for both bridges.

2.9 Members' views are requested as to whether they consider that it should be recommended to the Executive Member for Environment to include a sum of £25,000 in the 2004/05 Capital Programme to enable both bridges to be constructed in the same contract.

3. Proposed Planning Obligations Reform

3.1 The Office of the Deputy Prime Minister issued a consultation paper in November 2003 on the reform of the planning obligations policy. Such a change would affect the way in which developers contributions towards transport improvements are assessed and collected. Developers currently pay a contribution towards appropriate infrastructure and other improvements or measures following a negotiating process with the relevant local authority. The Government is minded to introduce a change whereby applicants for development could instead pay a 'planning charge'. This would lead to a tariff based approach to contributions from development. Draft regulations and a revised circular will be published for consultation in March/April 2004.

Recommendation

That the Panel notes the approved programme for 2004/05 together with the addition of Longslade Bottom and endorses the proposed programme for 2005/06.





Section 100 D - Local Government Act 1972 - background papers

The following documents disclose facts or matters on which this report, or an important part of it, is based and has been relied upon to a material extent in the preparation of this report.

NB the list excludes:

1.

Published works.

2.

Documents which disclose exempt or confidential information as defined in the Act.

TITLE

LOCATION

None

8543/MJS

APPENDIX 1

2004/05 and Draft 2005/06 County-wide Casualty Reduction Programme

The object of the programme is to meet the County Council's Public Service Agreement targets for casualty reduction.

Scheme

LTP Allocation £'000

Remarks

2004/05

2005/06

Low cost safety programme

1500

1500

Site specific schemes, usually comprising signing, road markings and surfacings

Water Lane, Totton (plus 130,000 EF)

120

Initial design under way

Future Safety Schemes

1000

1000

Programme to be determined

TOTAL (plus £130,000 EF)

2620

2500

APPENDIX 1 (contd)

2004/05 and Draft 2005/06 County-wide/Other Capital Programme

Programme

LTP Allocation £000

Remarks

2004/05

2005/06

Pedestrian Crossings

500

300

Continuing programme of new Pelican and Zebra crossings

MIRACLES

100

EU supported project for Winchester City, including air quality, freight distribution and alternatives to car use

Central Intelligent Transport Systems

200

200

Continuing programme of new computer based traffic management systems

Community Safety Initiative (Lighting)

60

60

Local schemes in association with parish and district councils.

Community Transport Schemes

650

650

New and replacement vehicles

Rural Partnership Schemes

200

200

Continuing programme of local traffic management schemes

Minor Works

250

250

Continuing programme of schemes costing less than £10,000 to meet local priorities

Passenger Transport Information

130

130

Contribution to national computer based public information systems

Safer Routes to Schools

1250

1500

Infrastructure improvements associated with approved School Travel Plans

Railway Stations/Interchanges

200

100

Continuing programme. Schemes to be determined

Air Quality and Noise Monitoring

50

50

Continuing programme of new remote stations

Home Zones/Community Strategies

100

100

Programme to be determined

LTP Monitoring/Initiatives

200

200

Continuing programme of new remote survey sites

Hythe Pier

90

90

Continuing programme of contributions to structural maintenance

Recreational Cycling

100

100

Continuing programme. Schemes to be determined

TOTAL

4080

3930

APPENDIX 2

2004/05 Capital Programme - New Forest Transport Strategy Area

(FOR INFORMATION ONLY)

Scheme

Previous LTP Area

Allocation £'000

Remarks

LTP

EF

North Street, Pennington - Traffic Management

CTTS

50

Consultation complete. Detail design under way

Station Road, New Milton - Puffin Crossing

CTTS

65

15

Previous title `Station Road/Manor Road, New Milton'. Detail design under way

A337: Pennington Cross to Belmore Road - Cycleway

CTTS

125

Previous title `Priestlands School, Lymington'. Toucan crossing funded from Pedestrian Crossings Programme. Detail design under way.

New Forest Bus Infrastructure Improvements

CTTS

100

Previous title `CTTS Public Transport Infrastructure and Information'. Discussions with operator under way.

Rookes Lane and Ridgeway Lane, Lymington - Traffic Management

CTTS

150

Consultation complete. Detail design under way.

New Forest Decriminalised Parking

NFTS

120

Administrative procedures under way.

Lyndhurst to Ashurst Cycleway

NFTS

400

Initial consultation complete. Detail design under way

Ringwood - Pedestrians and Cycles

NFTS

100

Initial feasibility under way.

TOTAL

1110

15

APPENDIX 3

2005/06 Draft Capital Programme - New Forest Transport Strategy Area

Scheme

Previous LTP Area

Allocation £'000

Remarks

LTP

EF

New Forest Bus Infrastructure Improvements - Phase 2

CTTS

100

Previous title `CTTS Public Transport Infrastructure and Information'. Continuation of 2004/05 programme.

Pennington to Town Centre Cycleway, Lymington

CTTS

150

Previous title `Pennington- South Lymington Cycles'. Feasibility study complete.

Whitefield Road/Station Road, New Milton - Traffic Signals

CTTS

175

Feasibility study required following completion of Old Milton/Gore Road (2003/04) and Station Road Puffin crossing (2004/05).

Ringwood-Pedestrians and Cycles - Phase 2

NFTS

100

Continuation of 2004/05 scheme.

New Forest Demand Management/Car Free Tourism

NFTS

125

Discussions with interest groups under way.

New Forest Cycle Plan

NFTS

100

To be published summer 2004.

TOTAL

750

0

APPENDIX 4

Preparation Pool - New Forest Transport Strategy Area

Scheme

Previous LTP Area

Remarks

Old Milton to North Milton Cycleway

CTTS

Feasibility study complete

High Street, Lymington - Traffic Management

CTTS

Investigation required.

Lyndhurst Village Cycleway

NFTS

Preliminary design complete

Ringwood Interchange

NFTS

Investigation required.

Brockenhurst Village Traffic Management

NFTS

Investigation required.

West Wellow Traffic Management

NFTS

Investigation required.