Appendix 1 - Hampshire Improvement Programme 2002/04
Part I - Top priorities for community focused service improvements
Priority area |
Activity |
Type of activity |
Progress at end of 2003/04 |
Lead Officer |
Improved educational achievement for children at risk of social exclusion |
Focus on deprived areas |
LPSA theme |
Achievements · Development of Community Strategy and Development plan with focus on deprivation as key priority areas. · LPSA targets aimed at deprived areas are demonstrating some success in raising performance in deprived areas targeted. Wider issues around deprivation are recognised in discussions on developing LPSA2. |
Paddy Hillary |
Pupils educated other than at school |
Best Value review Y3/4 |
Achievements · The EOTAS BV review was completed and reported to Education PRC on 23 March 2003. · Service Improvement Plan to be reported to Education PRC in July 2004 Issues · The BV Service Improvement Plan has identified that significant funding will need to be made available to establish the EOTAS database and the e-learning Virtual Learning Environment. |
Jack Cawthra | |
Supporting school attendance |
Best Value review Y3 |
Achievements · The Education Welfare Service (EWS) implemented the pilot scheme of basing EWOs in schools by locating the Fareham and Gosport team of Education Welfare Officers within local secondary schools. As attendance/absence figures for year 2003/04 are not yet available, it is too early to measure if this initiative has resulted in increases in levels of attendance for participating schools. The implementation of the pilot is currently being reviewed and evaluated. An interim report will be prepared by the end of July 2004. · The EWS has embarked on a programme of researching `evidence-based practice' nationally and locally. This is aimed at adopting/recommending effective initiatives that have been proven elsewhere in order to improve attendance and reduce unauthorised absences in the most cost effective way. · The EWS is also collating and examining statistics relating to attendance and unauthorised absence in Hampshire following intervention by the Hampshire EWS. This will enable analysis of the impact of various interventions and factors that improve performance. · EWS resources are now allocated (to schools) according to needs based on each school's level of attendance and unauthorised absence. · A protocol for working with local authority children's homes has been prepared by the EWS and each home has an allocated EWO attached to it. The Link EWO can ensure that issues regarding non-attendance by children `looked after' are dealt with more efficiently, leading to an overall improvement in the attendance of children in public care. |
Rita Crowne | |
Children in the community |
Best Value review - Y3/4 |
Achievements · The review has had to take account of the changing national childcare agenda, in particular Lord Laming's report into the death of Victoria Climbie and the recently published Green Paper: "Every Child Matters" and the subsequent Children Bill. The review findings are therefore being used to inform Hampshire's future development of Children's Services. Issues · Recruitment and retention issues and targets have been identified by the review. These have been included in the workforce plan and the service plan. |
Natalie Trentham | |
Focus on educational achievement of children looked after (CLA) |
LPSA target |
Achievements · Development of benchmarking standards in education · Focus on liaison with designated teachers and schools · Roll out of PEP dowries · Predicted grades from schools at KS4 suggest that 20% of CLA will achieve 5A*-C · Publication of Corporate Parenting News in 2003 Issues · increase in placement changes at KS3/KS4 · increasing number of young people failing to access full time provision from the LEA. |
Howard Firth | |
Improving stability of home life through adoption and permanent placements |
LPSA target |
Achievements · A new post has been created within the permanent team to "market" the concept of adoption. The reaction to this move has been positive. Issues · At the time of setting the targets for 2003/4 the Government had just announced national recruitment strategy to attract prospective adoptive parents. Nationwide a significant increase in adoptions was forecast as the numbers of children awaiting suitable parents was dramatically reduced. · The national campaign did not yield any significant increase in prospective adopters so our targets were not met. |
Steve Love | |
Improving educational attainment |
LPSA target |
No change |
Bob Eardley | |
An integrated approach with NHS, Housing and Voluntary Sector to meet the needs of Older People |
Supporting independence for older people |
Best Value review |
Agreed in December 2003 that the Best Value review would be covered by the Cabinet Priority Group |
Claire Foreman |
Supporting independence for older people |
Cabinet Priority |
Achievements · improving and expanding the "Safe and Sound" leaflet giving advice and contact information to older people at home · supporting the Hampshire Bobby Trust to provide additional security at home · working with the National Probation Service to provide a source of labour for community clean up projects. |
Paddy Hillary | |
Nursing Care Places |
Joint project with health |
Achievements · Construction is underway on six sites, and is on target First beds will be open in January 2005. · Staff recruitment and training has begun, with nurses recruited from India, in partnership with the DoH. · Planned progress on all fronts is on target. |
Andrew Brooker | |
Supporting people initiative |
Partnership project with district councils and voluntary sector |
Achievements · making contractual arrangements more flexible so people have choice about type of accommodation · IT system being used to increase payment and monitoring efficiency Issues · Government funding cuts have damaged the programme and led to a great deal of tension between commissioners and providers. Our aim is to guide the programme through this difficult period and be able to plan for the future when the funding situation has stabilised |
Alan Haggar | |
Natural Resource Initiative |
Reduction in demand for natural resources |
Corporate NRI project |
Achievements · Emergence of the Material Resources Strategy as the key vehicle for translating NRI concepts into practical strategies and plans, |
Bob Lisney |
Waste diversion programme |
LPSA target |
Achievements · Completion of the programme of demonstration projects for 2003/4 · Dissemination event to update staff `Sustainable Highways Construction and Maintenance through Partnership'. February 2004. · Sites identified for the programme of demonstration projects 2004/5. · Follow up workshops for staff are being organised · Finalising the programme of demonstration projects for 2004/5. |
Clare Saunders | |
Waste management |
Best Value review of Project Integra - Y4 |
The review is reaching the final phase of evidence gathering and an approach for developing a preferred option will be outlined to the Management Board on 8 July 2004. The Review report will be completed by end of August 2004 and a workshop for members has been arranged for 10 September 2004 to undertake the option appraisal. |
Steve Read | |
Reducing congestion and pollution on roads |
SHRT |
PFI Project |
Achievement · Two bids received from private sector consortia to construct and operate on a 30 year concession. Programme envisages contract award in mid 2005 with system opening in 2008 Issue · Government approval awaited to continue with procurement (June 2004). · A decision on this scheme inevitably impacts upon the development of a wider network for south Hampshire |
Les Herbert |
Increased bus use |
LPSA target |
Achievements · a direct marketing campaign encouraging people to make more use of the bus network is showing very positive early results with passenger growth of around 6% on the 'marketed' routes. · new investment by operators in vehicles and improved frequencies as part of Quality Bus Partnership agreements with the County Council have delivered growth of up to 20% in urban areas. Issue · How to influence a target that is largely dependent on market conditions in the bus industry. The outcome 2003/04 is a decline in usage of 4.05% in usage compared with 1999/00. |
Keith Wilcox | |
Keeping traffic safely on the move |
Road quality programme |
LPSA target |
Achievements · achieved the required PSA target one year ahead of schedule. · B & C roads show a significant improvement in the percentage of the network needing maintenance intervention (from 18.09% to 15.52%) Issue · How quickly the additional funding put into the maintenance of footways and rural unclassified roads will start to make a positive impact upon highway condition in these areas. |
Alan Giles |
Road safety programme |
LPSA target |
Achievements: · Funding for road casualty reduction engineering programmes increased to £2.75m in 2003/04 and to £3m in 2004/05 · National target for the reduction in the number of people killed or seriously injured in 2003/04 exceeded, representing the lowest killed and seriously injured toll on Hampshire roads to date. · Reduction in child fatal and serious injury toll ahead of national target by 2003 calendar year. Lowest serious child casualty toll to date on Hampshire roads in 2003 calendar year. · European Road Safety Award in 2004 for excellence in casualty reduction partnership working Issue: · Having exceeded the national target, what additional actions are necessary to meet the more stretching LPSA targets. |
Tim Cheesebrough | |
Increasing community engagement and access to public services |
Democratic Services |
Best Value review Y3 |
Achievements · Marked improvement in the volume and quality of information published on Hantsnet/Hantsweb in relation to decision making, policy review and committee decisions · Reports contain local members' views as a matter of course · E-deputation form has extended choice and opportunity but has seldom been used · All Executive decisions overtly linked to corporate aims · County Council has resolved to progress the development of Scrutiny and area committees by way of pilot area committees in Havant and Test Valley and evolution of the Policy and Resources PRC into the corporate scrutiny body Issues · Additional resources would be needed for full roll out of area committee pilots |
David Hinxman |
E-government strategy |
IEG Statement |
Andrew Smith / Jos Creese | ||
Development of Community Strategies to involve all key sectors |
Aim of LSPs |
· HSP, through HCC budgets, have part-funded various community consultations, focus groups and workshops both in districts and county-wide · HSP established with 30 members representing public, private, voluntary and community · HSP developed own brand, Communications Strategy and Website · 5 community strategies published In Hampshire all adopted and endorsed by HCC, the rest are all in draft form · Community Strategy for Hampshire and Development Plan published May 2004 |
Jo White | |
Community engagement - building on existing external communications and Corporate Assessment recommendation to capitalise on existing consultation and develop full engagement |
Cross-cutting best value review Y4 |
Achievements: · The report on the scope and approach of the review was approved by the P&R PRC. · Phase 2 of the review will use the EFQM model and the 4C's. This begins at the end of June. |
Keith Kerslake | |
Working with young people |
Development of cross-cutting Youth Strategy |
Best Value review - Y2/3 |
Achievements: · Youth Strategy has been linked to the work of the Cabinet Priority group, which is piloting approaches in Andover aimed to achieve the strategy targets. · Connexions personal advisors are re-engaging young people not currently in education, training or work Issues: · There will be some transitional disruption as Connexions contracting arrangements change |
Malcolm Rittman |
Focus on supporting disaffected youth |
Cabinet priority |
Achievements Ongoing support to an array of diversionary activities for young people provided in partnership with Test Valley Borough Council and Testway Housing have continued to hold down lower levels of anti-social behaviour particularly juvenile nuisance: · Holiday activities run in priority areas over February 2004 half-term · Specification drawn up to establish Canoeing Development Programme at Calshot Activities Centre for referred young people · Cultural Activities Programme awayday held on 25-02-04 with partners |
Mike Wickenden | |
Connexions Strategy |
Inter-agency project |
Achievements · Connexions personal advisors are re-engaging young people not currently in education, training or work Issues: · There will be some transitional disruption as Connexions contracting arrangements change |
Malcolm Rittman | |
focus on areas of deprivation |
LPSA theme |
Achievements · Development of Community Strategy and Development plan with focus on deprivation as key priority areas. · LPSA targets aimed at deprived areas are demonstrating some success in raising performance in deprived areas targeted. Wider issues around deprivation are recognised in discussions on developing LPSA2. |
Paddy Hillary | |
Chief Executive leading the group for 2 years |
Hampshire and IOW strategic level YOT |
Our initial targets in relation to vehicle crime and domestic burglary have proved inappropriate and the Youth Offending Team have subsequently decided it would be better to measure the levels of youth re-offending. By taking a closer and more rigorous approach to collecting and monitoring a range of performance information the Youth Justice Board has seen a marked improvement in overall results. |
Peter Robertson |
Part II - Top priorities for investment in infrastructure to increase efficiency, economy and effectiveness of support for frontline services
Priority area |
Activity |
Type of activity |
Progress at end of 2003/04 |
Lead Officer |
Ensuring high quality staff are in place to deliver quality services |
Development of leadership skills through Leadership Project |
Corporate project |
Achievements · Tier 3 complete · 330 - Tier 4 staff invited · Programme redesigned to best fit Tier 4 Issues · Demand for programme is growing, therefore rollout will lengthen Work in Progress · Leadership and Management to be integrated into an ongoing Leadership/Management Programme for others in the organisation |
Chris Locke |
Pay and Benefits Strategy |
Corporate project |
Achievements The project strategy was reviewed and amended in early 2004 and external pay and benefits expertise recruited to the project team. This resulted in a revised plan and indicative time line. This will be reviewed in September/October following pay modelling and the completion of the consultation process · Roles identified, evaluated and resulting rank order reviewed with departments. · Performance development strategy included within Pay Strategy · Data clean up exercise initiated to facilitate modelling of options and costs Work in progress · Pay solutions to be modelled June- September 04 · Pay model implementation expected to begin in 2005/06 · Role of competence framework to be reviewed · Consultation process has commenced |
Pauline Lucas | |
Reduction of employee absence |
Management activity |
Achievements · Target met as absence now 7.4 days per fte This reduction is in part due to a change in method of calculation, but also due to improved management. · Occupational Health has been reorganised to work pro-actively in reducing risk to health · Analysis of trends presented to Cabinet and CMT via annual workforce plans Work in progress · Review of Health and Safety currently being undertaken which will include the exploration of a Wellness Management Strategy |
Pauline Lucas | |
Housing support for key workers, including the teacher recruitment and retention strategy |
Corporate project |
Achievements · Short term accommodation provided for nurses employed on ENHANCE Nursing Care Project. Longer term options being evaluated. · Swaythling Housing Society appointed as `Zone Agent' for Hampshire to provide a more co-ordinated service to key workers. · Increased provision of key worker housing on appropriate land sales by the County Council. Issues · SE Regional Housing Board funding allocated to key worker schemes for 2004/05 and 2005/06. Options for employees not within Government `key worker' definition being considered. |
Andrew Smith | |
Development of Member scrutiny role |
Scrutiny development |
Response to CPA recommendation |
Achievements · Council have agreed to the establish a P&R Scrutiny and Select Committee with effect from July 2004. · A programme of reviews, Member and officer training and the appointment of dedicated officer support is underway · External evaluation is planned via INLOGOV and Audit Commission - on a continuous basis for 12 months and then subject to report |
Malcolm Cole |
Member development |
Response to CPA recommendation |
Achievements · Agreement reached to set up a member/officer group to look at the development of a comprehensive induction, training and development programme for Members based on their role outcomes · Programme of briefings and skills workshops ongoing · Website developed by Hampshire Learning Centre enabling Members to access information about training courses and book on-line · Exploration started into how to co-ordinate local departmental training activities with corporate programme |
Michelle Smith | |
Outcome of Democratic Services review |
Best Value review - Y3 |
Achievements · Marked improvement in the volume and quality of information published on Hantsnet/Hantsweb in relation to decision making, policy review and committee decisions · Reports contain local members' views as a matter of course · All Executive decisions overtly linked to corporate aims in the record of each decision · Positive response by Chief Officers to members' information expectations · County Council has resolved to progress the development of Scrutiny and area committees by way of pilot area committees in Havant and Test Valley and evolution of the Policy and Resources PRC into the corporate scrutiny body |
||
Depending on resources, development of NHS scrutiny |
Project |
Achievements: · Published report on 2003/04 progress with health scrutiny + forward programme · Infrastructure arrangements for health scrutiny established · Collaborative patterns of working with partners emerging Issues: · High, unpredictable workload for members of Health review Committee, coupled with steep learning curve about health issues and need to respond to consultation, referrals etc · Potential difficulty of achieving separation of interest as sensitive issues arise |
Denise Holden | |
Development of performance management |
Integrated planning and performance management framework, to include improved reporting |
Response to CPA and audit recommendations / management activity |
Achievements: · Consultation on and promotion of outline performance management framework has taken place with snr managers, members and performance specialists. · Process issues have been clarified to determine approval mechanisms, accountability / responsibility for functions and linkages between related strands of activity · Integration of key corporate documents with corporate strategy as over-arching document is taking place Issues: · The Policy Unit is experiencing recruiting issues which are impacting on its capacity to deliver in the short term |
Jenny Heath |
Service planning project |
Achievements · Service planning has taken place across the authority, though not all departments have wholly embraced the new process using the corporate givens. We have been reassured that these departments intend to do so for 2005/6 and in some cases they will go straight into integrated planning with budgeting. Issues · Some delays have been incurred by DMT's taking time to approve the plans · There is some difficulty experienced in getting the plans on Hantsnet, which should be addressed by the new Contents Management System. |
Katie Crabb | ||
Integrated improvement programme |
This work has now been incorporated in the following activity streams: · Development of the scrutiny programme for the county-wide select committee · Development of performance monitoring and reporting as part of the performance management framework The annual revision of the Best Value review programme will continue as normal. This programme is now also incorporated within the Corporate Strategy. |
Jenny Heath | ||
Improvement of performance indicator processes and systems |
Achievements · District Auditors undertook preliminary assessments of all 2003/04 indicators deemed to be at `high risk', making recommendations as to how the data collection processes might be improved. · Terms of Reference established for the PI Coordinators Group and roles of `PI Coordinator' and `Nominated Operational Managers' in the process clarified · Work is presently being undertaken on integrating the collection of BVPI data with the monitoring of service plans. · Work begun to exploit investment in SAP to develop integrated PI system Issues · Development of SAP PI system is falling short of expectations. There is considerable concern at the amount of manual data manipulation needed to present information on the performance plan website in time for the statutory deadline. |
|||
Implementation of Pay and Benefits strategy |
Corporate project |
Achievements · Performance development strategy included within Pay Strategy · PDR process to be redeveloped in light of revised direction of Pay Strategy. Process to be in 2 parts, first part on performance, second part on development. Implementation will be in line with Pay and Benefits rollout. |
Pauline Lucas | |
Maintenance of IIP accreditation |
Corporate project |
Achievements · Reviews undertaken · Re-accreditation recognised and awarded · Current "post recognition review" completed successfully · New process used and evaluated · Recognised Nationally as leaders in internal assessment Work in progress · New Corporate and Departmental Action Plans being developed · New Profile approach to be evaluated and adopted where appropriate to individual service plans · Stages, and rolling approach to re-accreditation over the next 3 years agreed |
Chris Locke | |
Development of ICT infrastructure |
SAP - Enterprise project |
Corporate project |
Achievements · The Benefits Realisation Plan has been drafted with savings targets of £800,000 in 2004/05, rising to £2,850,000 per annum by 2007/08. Savings to accrue from investment in Finance, HR, IT and procurement functions. · All departments are now using SAP facilities |
Steve Collins |
IT 2000 strategy |
Corporate project |
Jos Creese |
Outline future improvement programme 2004/06:
Some of the immediate priorities are likely to remain top priorities. Other priorities already identified are:
Service improvements:
Priority area |
Activity |
Type of activity |
Progress at end of 2003/04 |
Lead Officer |
Lifelong learning |
Best Value Review |
On target to deliver the Corporate Strategy for Lifelong Learning by December 2004 |
John Wilkinson | |
Social inclusion |
now Equality and Diversity review |
Best Value review |
· Review team identified, scope agreed, project plan aims to report by Dec. `04 · Level 2 of the Equality Standard achieved April 2003 · CPSG agreed further work to ensure Impact Assessment in service plans |
Jane Goodwin |
Cultural strategy |
Corporate project |
No change |
Nicola Horsey | |
Promoting independent living for vulnerable people |
This work has now been incorporated in service planning and review |
Infrastructure improvements:
Priority area |
Activity |
Type of activity |
Progress at end of 2003/04 |
Lead Officer |
Realisation of new ICT systems efficiency gains: |
Review of HR roles and responsibilities - post-SAP implementation |
Potential Best Value review |
· CPSG to consider as part of deliberations on future Best Value review programme |
|
Review of processes and infrastructure for office / administrative / information support services |
Potential Best Value review |
· no priority given to this review topic at CPSG |
||
Procurement |
Corporate project (Best Value Review will probably no longer be required) |
· The establishment of the CPN and the development of the CP strategy is creating an environment that is supportive of strategic procurement. Work in progress · The Procurement Development Team within PBRS County Supplies will be expanded during 2004/05. · The launch of regional Centres of Procurement Excellence (CoPE) is also expected to move the procurement agenda forward and both the DPBRS and the Head of Business Services have been invited to join the Management Board of the South East CoPE by the host authority (Kent CC). · An allocation of e-government money has been made to support the development of e-procurement within the County Council during 2004/05. · Discussions are taking place through HIOWA with regard to collaboration between local authorities across Hampshire. |