Hampshire County Council Eastleigh Highway and Transport Advisory Panel 15 October 2004 Eastleigh Traffic Management Report of the Head of Engineering, Eastleigh Borough Council |
Item 8 |
Contact: Duncan McVey, tel 023 8068 8234
1. Summary
1.1 This report brings Members up-to-date on progress made and new issues arising since the last report to this Panel in March 2004.
2. Decriminalisation of On-Street Parking Enforcement
2.1 All Traffic Regulation Orders (TROs) relating to waiting restrictions within the Borough have been checked and the Under Secretary of State for Transport has confirmed that he has signed the order necessary for this Borough to assume responsibility for decriminalised parking enforcement, which will come into force on 1 October 2004. In the two-week period prior to the October start the enforcement team will be issuing notices that advise motorists contravening any waiting restrictions of the new arrangements.
3. New Restricted Parking Zones
3.1 The new housing development on the Causton Printing site has a limited provision for public parking, in line with current planning standards. In order to restrict parking within the development, the Eastleigh Local Area Committee approved a Restricted Parking Zone in July 2004. Waiting will not be permitted at any time except in designated areas, where two-hour parking will be permitted from 8.00 am to 8.00 pm, Monday to Saturday (no return within the same day). The necessary signs and Order will be completed in December.
3.2 Progress on introducing a similar Restricted Zone on the Pirelli site has been postponed whilst the development continues to be built. Work on the parking management scheme should be resumed in the autumn.
3.3 The use of Restricted Parking Zones in other parts of the town, such as Leigh Road, is also being investigated as an alternative to the intrusive use of yellow lines in environmentally sensitive areas.
4. New Controlled Parking Zones
4.1 In order to prevent the surrounding residential areas from receiving a significant increase in parked vehicles from both these new developments, proposals for three new Controlled Parking Zones (Residents' Parking) were considered by the Eastleigh Local Area Committee (ELAC) in July 2004 with the following outcome:
(i) Kipling Road/Brookwood Avenue area: A new controlled parking zone was approved at the ELAC meeting on 28 September for the Brookwood Avenue area, to exclude Kipling Road.
(ii) Locksley Road area - approved with the exception of Derby Road (between Burns Road and Passfield Avenue), Locksley Road, Burns Close and Burns Road. Members also requested that consultants carry out a study of parking problems in the Monks Way, Locksley Road, Burns Road and Burns Close area.
(iii) Chadwick Road area - approved with an amendment in Spencer Road (subject to re-advertisement).
5. Change in Hours of Existing Controlled Parking Zones
5.1 Proposals to extend the hours of operation in the existing Controlled Parking Zones (Residents' Parking) from 8.00 am to 6.00pm to 8.00 am to 8. 00 pm from Monday to Saturday were approved by the Eastleigh Local Area Committee in June 2004 and are now in operation.
6. Traffic Studies and Traffic Regulation Orders Work Programme
6.1 The current list of outstanding Traffic Studies and TROs is attached as an appendix. Progress on much of this work has been delayed due to staff shortages and the heavy commitment to decriminalisation and residents' parking over the past six months.
Recommendation
That this report be noted.
|
|
Section 100 D - Local Government Act 1972 - background papers |
|
The following documents disclose facts or matters on which this report, or an important part of it, is based and has been relied upon to a material extent in the preparation of this report. |
|
NB the list excludes: |
|
1. |
Published works. |
|
2. |
Documents which disclose exempt or confidential information as defined in the Act. |
8985/DMcV
APPENDIX
TRAFFIC SECTION WORKPLAN
SEPTEMBER 2004
|
|
|
|
AGENCY TRO PROGRAMME |
TRO |
ISSUE |
TARGET |
COMMENTS |
(BFOHH area) |
Stoke Park Road, Fair Oak Road, Hamilton Road, Old Fair Oak Road, Underwood Road, Witt Road |
Verge Parking Restrictions |
Autumn `04 |
Borough-wide TRO. Advertisement and signing costs to be funded by LAC. |
(BHH area) |
Reeves Way, Lowford |
20mph Zone |
Summer `04 |
Checking if police support proposals. |
Coach Road, Hamble |
One Way |
Winter `04/05 |
Statutory consultation complete. Seeking further information about possible cycle route. |
Kinsbourne Way, Queens View |
Verge Parking Restrictions |
Autumn `04 |
Borough-wide TRO. Advertisement and signing costs to be funded by LAC. |
(CFH area) |
Keble Road/Shaftesbury Avenue/Chalvington Road |
Waiting Restrictions |
Summer `04 |
TRO implemented 2/9/04. Lining works to be carried out shortly. |
Nichol Road Shops |
Waiting Restrictions |
Autumn `04 |
TRO to be sent to HCC for approval prior to public consultation. |
Chandler's Ford Railway Station, Station Lane |
Waiting Restrictions |
Winter `04/05 |
Making initial enquiries. |
Winchester Road |
Taxi Rank |
|
Making preliminary enquiries with taxi companies |
Bodycoats Road, Brownhill Road, Kings Road, Mead Road, Merdon Avenue |
Verge Parking Restrictions |
Autumn `04 |
Borough-wide TRO. Advertisement and signing costs to be funded by LAC. |
(Eastleigh area) |
Leigh Road (Bournemouth Road to M3 north slip road) |
Waiting Restrictions |
Winter `04/05 |
Making initial enquiries. |
Falcon Square, Falkland Road, Lawn Road, St Johns Road, Nightingale Avenue |
Verge Parking Restrictions |
Autumn `04 |
Borough-wide TRO. Advertisement and signing costs to be funded by LAC. |
Nightingale Avenue |
Waiting Restrictions |
|
HCC have removed experimental traffic calming and are replacing it with islands. Await confirmation whether restrictions required. |
|
|
|
|
AGENCY TRO PROGRAMME (continued) |
TRO |
ISSUE |
TARGET |
COMMENTS |
(Eastleigh area) |
Romsey Close |
Waiting Restrictions |
|
Amendment to existing restrictions. Wait to include with amendments to another TRO in the area. |
Doncaster Road |
Waiting Restrictions |
|
Extend permit parking bay near No. 64. Wait to include with amendments to another TRO in the area. |
(HEWEB area) |
Stroudley Way |
One Way and Waiting Restrictions |
Summer `04 |
TROs to be implemented in September '04. HCC arranging works for signing/lining over following months. |
Maunsell Way |
Waiting Restrictions |
Summer `04 |
TRO implemented 2/9/04. HCC arranging lining. |
Moorgreen Road |
Extension of 30mph speed limit |
Autumn `04 |
Checking whether speed limit criteria has been met. |
Allen Road, Bedford Close, Marls Road, Precosa Road, Tickner Close |
Verge Parking Restrictions |
Autumn `04 |
Borough-wide TRO. Advertisement and signing costs to be funded by LAC. |
(Boroughwide) |
Decriminalised Parking |
Consolidation of orders |
October `04 |
Completed. |
|
|
|
|
LAC TRO PROGRAMME (Funded by devolved budgets) |
TRO |
ISSUE |
TARGET |
COMMENTS |
(BFOHH area) |
None |
|
|
|
(BHH area) |
None |
|
|
|
(CFH area) |
None |
|
|
|
(Eastleigh area) |
None |
|
|
|
(HEWEB area) |
Townhill Way, W/E |
7.5 tonne Weight Restriction |
Spring `04 |
Remaining sign for Southampton ordered in August 04. |
|
|
|
|
DEVELOPER FUNDED TROs |
TRO |
ISSUE |
TARGET |
COMMENTS |
Residents' Parking Zones |
3 new controlled zones and 1 new restricted zone |
LAC 28/09/04 March `05 |
Kipling Road Zone: amended proposals to be submitted to LAC. Chadwick Road and Cherbourg Road Zones: to be implemented early 2005. KB arranging signing/lining. Causton site restricted zone: to be implemented December `04. Developer arranging signing. |
The Gardens, Eastleigh |
Waiting Restrictions |
LAC 28/09/04 |
Report to LAC re entitlement of parking permits and amendment of TRO. |
Coach Road |
Waiting Restrictions |
Winter `04/05 |
Statutory Consultation to start Autumn `04. |
Pirelli Site |
Various Restrictions |
Spring `05 |
Meeting with consultant 14/10/04 to discuss how to proceed. |
Eastleigh College |
New access |
Autumn `04 |
Making initial enquiries. |
Hursley Road/Pine Road |
Waiting Restrictions |
2005 |
Deferred until development completed to see if restrictions still required. |
|
|
|
|
CAPITAL WORKS / SAFER ROUTES TO SCHOOL FUNDED TROs |
TRO |
ISSUE |
TARGET |
COMMENTS |
Factory Road Boulevard |
Green Street |
Ongoing |
Input as required. |
TRO to cover all school zigzags Boroughwide |
Waiting Restrictions |
|
Making initial enquiries. |
Long Lane |
Waiting Restrictions |
|
£5000 allocated from Safer Routes to School. |
Kingsway/Brownhill Road/Merdon Avenue/ Kendall Close |
Waiting Restrictions |
|
Awaiting Merdon `School Safety Zone' traffic-calming (STP funding). |
Leigh Road (between Romsey Road and High Street) |
Amendment to waiting restrictions. |
|
Amendments due to environmental improvements. |
Victoria Road, Netley |
Amendment to waiting restrictions. |
|
Amendments due to construction of build-outs at York Road, Manchester Road junctions. |
|
|
|
|
LOCAL AREA COMMITTEE WORK |
TASKS |
ISSUE |
TARGET |
COMMENTS |
BFOHH LAC |
Mortimers Lane, Fair Oak |
Speed Limit Review |
Autumn `04 |
Waiting for consultant's cycle route report to go to LAC before following up remaining recommendation. |
Botley Road: Eastleigh Road to Denhams Corner (1) |
Traffic Study |
|
Not started. |
Fair Oak Road: Riverside to Eastleigh Road, excluding Alan Drayton Way (2) |
Traffic Study |
|
Not started. |
LOCAL AREA COMMITTEE WORK (continued) |
TASKS |
ISSUE |
TARGET |
COMMENTS |
BFOHH LAC |
Allington Lane (3) |
Traffic Study |
|
BFOHH section only. Not started. |
Winchester Road, Fair Oak (4) |
Accident Numbers |
|
Reserve study. Not started. |
BHH LAC |
Bursledon Village |
Speed Limit Review |
Winter `04/05 |
Underway. |
Hamble Lane/Portsmouth Road |
30mph speed limit |
Autumn `04 |
`After' speed surveys following completion of toucan crossing. |
Coach Road area |
Parking Surveys |
Autumn `04 |
For verge parking problems. Not started. |
BHH LAC |
Review of studies already undertaken (1) |
Review |
|
Includes following studies: Portsmouth Road (2000) Ingleside (2001) Satchell Lane (2001) Hound Road (2001) Woolston Road (2001) Station Rd/Victoria Rd (2002) Hamble Lane (2003) |
Grange Road: Victoria Road to Portsmouth Road (2) |
Traffic Study |
|
Not started. |
Lionheart Way (3) |
Traffic Study |
|
Not started. |
New Road, Netley |
Speed survey |
|
Not started. |
CFH LAC |
Chandler's Ford Railway Station |
`After' parking surveys |
September `04 |
HCC carrying out surveys in September '04. Await to hear if any action required from EBC. |
Winchester Road |
`Hatched' centre lines |
Autumn `04 |
`After' speed survey. |
North Millers Dale (1) |
Traffic Study |
|
Not started. |
Bournemouth Road (2) |
Traffic Study |
|
Not started. |
School Lane (3) |
Traffic Study |
|
Not started. |
Leigh Road: Bournemouth Road to M3 north sliproad (4) |
Traffic Study |
|
Not started. To be funded from the Traffic and Road Safety Issues budget. |
Ashdown Road (5) |
Traffic study |
|
Reserve study. Not started. |
Winchester Road, Shell Garage |
Monitoring of Pedestrian Movements |
2005 |
Deferred until re-development started. |
ELAC |
Westfield Road |
Traffic Study |
Winter `04/05 |
Not Started. |
Stoneham Lane |
40mph speed limit |
|
`After' speed survey. Wait until toucan crossing constructed. |
|
|
|
|
LOCAL AREA COMMITTEE WORK (continued) |
TRO |
ISSUE |
TARGET |
COMMENTS |
ELAC |
Nightingale Avenue area |
Verge Parking Study |
|
Not started. |
Woodside Avenue (1) |
Traffic Study |
|
Not started. |
Chestnut Avenue (2) |
Traffic Study |
|
Not started. |
Passfield Avenue (3) |
Traffic Study |
|
Not started. |
St Catherines Road (4) |
Traffic Study |
|
Not started. |
Bishopstoke Road: Southampton Road to Chickenhall Lane (5) |
Traffic Study |
|
Not started. |
HEWEB LAC |
Winchester Road/Street/ Boorley Green |
Traffic study/Accident numbers |
Autumn `04 |
Underway. To go to LAC after October. |
Grange Road (After Study) |
Review of traffic speed after study |
Autumn `04 |
Waiting for speed gun to be repaired. |
Area surrounding Freegrounds Schools: Hobb Lane, Sovereign Drive and Bedford Close. (1) |
Traffic Study |
|
Not started. |
Allington Lane: HEWEB section (2) |
Traffic Study |
|
Not started. |
Burnetts Lane |
Traffic Count |
|
LAC allocated funding. |
|
|
|
|
OTHER AGENCY WORK |
TASKS |
ISSUE |
TARGET |
COMMENTS |
Public/Councillor Enquiries |
|
Ongoing |
|
DDPBs |
New applications & assessments |
Ongoing |
|
DDPBs |
Annual Review |
Autumn `04 |
|
Signing/Lining |
Implementation |
Ongoing |
|
QBP |
Poles, flags, new shelters, hard-standings |
2004/05 |
Work to start shortly. |
Street Name Plates |
Implementation & Maintenance |
Ongoing |
E/L, BFOHH and CFH orders complete. Part of HEWEB done. Started work on BHH. |
Bus Shelters |
Maintenance |
Ongoing |
|
Re-chargeable works |
i.e. Tourist Signs |
Ongoing |
|
Parking around Barton Peveril/Eastleigh Colleges |
Prepare revised brief for consultants. |
Autumn `04 |
|
|
|
|
|
OTHER COMMITMENTS |
Road Safety Council |
|
Ongoing |
Most recent meeting was in July. |