1. Summary

1.1 This report brings Members up-to-date on progress made and new issues arising since the last report to this Panel in March 2004.

2. Decriminalisation of On-Street Parking Enforcement

2.1 All Traffic Regulation Orders (TROs) relating to waiting restrictions within the Borough have been checked and the Under Secretary of State for Transport has confirmed that he has signed the order necessary for this Borough to assume responsibility for decriminalised parking enforcement, which will come into force on 1 October 2004. In the two-week period prior to the October start the enforcement team will be issuing notices that advise motorists contravening any waiting restrictions of the new arrangements.

3. New Restricted Parking Zones

3.1 The new housing development on the Causton Printing site has a limited provision for public parking, in line with current planning standards. In order to restrict parking within the development, the Eastleigh Local Area Committee approved a Restricted Parking Zone in July 2004. Waiting will not be permitted at any time except in designated areas, where two-hour parking will be permitted from 8.00 am to 8.00 pm, Monday to Saturday (no return within the same day). The necessary signs and Order will be completed in December.

3.2 Progress on introducing a similar Restricted Zone on the Pirelli site has been postponed whilst the development continues to be built. Work on the parking management scheme should be resumed in the autumn.

3.3 The use of Restricted Parking Zones in other parts of the town, such as Leigh Road, is also being investigated as an alternative to the intrusive use of yellow lines in environmentally sensitive areas.

4. New Controlled Parking Zones

4.1 In order to prevent the surrounding residential areas from receiving a significant increase in parked vehicles from both these new developments, proposals for three new Controlled Parking Zones (Residents' Parking) were considered by the Eastleigh Local Area Committee (ELAC) in July 2004 with the following outcome:

      (i) Kipling Road/Brookwood Avenue area: A new controlled parking zone was approved at the ELAC meeting on 28 September for the Brookwood Avenue area, to exclude Kipling Road.

      (ii) Locksley Road area - approved with the exception of Derby Road (between Burns Road and Passfield Avenue), Locksley Road, Burns Close and Burns Road. Members also requested that consultants carry out a study of parking problems in the Monks Way, Locksley Road, Burns Road and Burns Close area.

      (iii) Chadwick Road area - approved with an amendment in Spencer Road (subject to re-advertisement).

5. Change in Hours of Existing Controlled Parking Zones

5.1 Proposals to extend the hours of operation in the existing Controlled Parking Zones (Residents' Parking) from 8.00 am to 6.00pm to 8.00 am to 8. 00 pm from Monday to Saturday were approved by the Eastleigh Local Area Committee in June 2004 and are now in operation.

6. Traffic Studies and Traffic Regulation Orders Work Programme

6.1 The current list of outstanding Traffic Studies and TROs is attached as an appendix. Progress on much of this work has been delayed due to staff shortages and the heavy commitment to decriminalisation and residents' parking over the past six months.

Recommendation

That this report be noted.

Section 100 D - Local Government Act 1972 - background papers

The following documents disclose facts or matters on which this report, or an important part of it, is based and has been relied upon to a material extent in the preparation of this report.

NB the list excludes:

1.

Published works.

2.

Documents which disclose exempt or confidential information as defined in the Act.

TITLE

LOCATION

None.

8985/DMcV

APPENDIX

TRAFFIC SECTION WORKPLAN

SEPTEMBER 2004

AGENCY TRO PROGRAMME

TRO

ISSUE

TARGET

COMMENTS

(BFOHH area)

Stoke Park Road, Fair Oak Road, Hamilton Road, Old Fair Oak Road, Underwood Road, Witt Road

Verge Parking Restrictions

Autumn `04

Borough-wide TRO. Advertisement and signing costs to be funded by LAC.

(BHH area)

Reeves Way, Lowford

20mph Zone

Summer `04

Checking if police support proposals.

Coach Road, Hamble

One Way

Winter `04/05

Statutory consultation complete. Seeking further information about possible cycle route.

Kinsbourne Way, Queens View

Verge Parking Restrictions

Autumn `04

Borough-wide TRO. Advertisement and signing costs to be funded by LAC.

(CFH area)

Keble Road/Shaftesbury Avenue/Chalvington Road

Waiting Restrictions

Summer `04

TRO implemented 2/9/04. Lining works to be carried out shortly.

Nichol Road Shops

Waiting Restrictions

Autumn `04

TRO to be sent to HCC for approval prior to public consultation.

Chandler's Ford Railway Station, Station Lane

Waiting Restrictions

Winter `04/05

Making initial enquiries.

Winchester Road

Taxi Rank

Making preliminary enquiries with taxi companies

Bodycoats Road, Brownhill Road, Kings Road, Mead Road, Merdon Avenue

Verge Parking Restrictions

Autumn `04

Borough-wide TRO. Advertisement and signing costs to be funded by LAC.

(Eastleigh area)

Leigh Road

(Bournemouth Road to M3 north slip road)

Waiting Restrictions

Winter `04/05

Making initial enquiries.

Falcon Square, Falkland Road, Lawn Road, St Johns Road, Nightingale Avenue

Verge Parking Restrictions

Autumn `04

Borough-wide TRO. Advertisement and signing costs to be funded by LAC.

Nightingale Avenue

Waiting Restrictions

HCC have removed experimental traffic calming and are replacing it with islands. Await confirmation whether restrictions required.

AGENCY TRO PROGRAMME (continued)

TRO

ISSUE

TARGET

COMMENTS

(Eastleigh area)

Romsey Close

Waiting Restrictions

 

Amendment to existing restrictions. Wait to include with amendments to another TRO in the area.

Doncaster Road

Waiting Restrictions

 

Extend permit parking bay near No. 64. Wait to include with amendments to another TRO in the area.

(HEWEB area)

Stroudley Way

One Way and Waiting Restrictions

Summer

`04

TROs to be implemented in September '04. HCC arranging works for signing/lining over following months.

Maunsell Way

Waiting Restrictions

Summer `04

TRO implemented 2/9/04. HCC arranging lining.

Moorgreen Road

Extension of 30mph speed limit

Autumn `04

Checking whether speed limit criteria has been met.

Allen Road, Bedford Close, Marls Road, Precosa Road, Tickner Close

Verge Parking Restrictions

Autumn `04

Borough-wide TRO. Advertisement and signing costs to be funded by LAC.

(Boroughwide)

Decriminalised Parking

Consolidation of orders

October `04

Completed.

LAC TRO PROGRAMME (Funded by devolved budgets)

TRO

ISSUE

TARGET

COMMENTS

(BFOHH area)

None

(BHH area)

None

(CFH area)

None

(Eastleigh area)

None

(HEWEB area)

Townhill Way, W/E

7.5 tonne Weight Restriction

Spring `04

Remaining sign for Southampton ordered in August 04.

DEVELOPER FUNDED TROs

TRO

ISSUE

TARGET

COMMENTS

Residents' Parking Zones

3 new controlled zones and 1 new restricted zone

LAC

28/09/04

March `05

Kipling Road Zone: amended proposals to be submitted to LAC.

Chadwick Road and Cherbourg Road Zones: to be implemented early 2005. KB arranging signing/lining.

Causton site restricted zone: to be implemented December `04. Developer arranging signing.

The Gardens, Eastleigh

Waiting Restrictions

LAC 28/09/04

Report to LAC re entitlement of parking permits and amendment of TRO.

Coach Road

Waiting Restrictions

Winter `04/05

Statutory Consultation to start Autumn `04.

Pirelli Site

Various Restrictions

Spring `05

Meeting with consultant 14/10/04 to discuss how to proceed.

Eastleigh College

New access

Autumn `04

Making initial enquiries.

Hursley Road/Pine Road

Waiting Restrictions

2005

Deferred until development completed to see if restrictions still required.

CAPITAL WORKS / SAFER ROUTES TO SCHOOL FUNDED TROs

TRO

ISSUE

TARGET

COMMENTS

Factory Road Boulevard

Green Street

Ongoing

Input as required.

TRO to cover all school zigzags Boroughwide

Waiting Restrictions

Making initial enquiries.

Long Lane

Waiting Restrictions

£5000 allocated from Safer Routes to School.

Kingsway/Brownhill Road/Merdon Avenue/ Kendall Close

Waiting Restrictions

Awaiting Merdon `School Safety Zone' traffic-calming (STP funding).

Leigh Road (between Romsey Road and High Street)

Amendment to waiting restrictions.

Amendments due to environmental improvements.

Victoria Road, Netley

Amendment to waiting restrictions.

Amendments due to construction of build-outs at York Road, Manchester Road junctions.

LOCAL AREA COMMITTEE WORK

TASKS

ISSUE

TARGET

COMMENTS

BFOHH LAC

Mortimers Lane, Fair Oak

Speed Limit Review

Autumn `04

Waiting for consultant's cycle route report to go to LAC before following up remaining recommendation.

Botley Road: Eastleigh Road to Denhams Corner (1)

Traffic Study

Not started.

Fair Oak Road: Riverside to Eastleigh Road, excluding Alan Drayton Way (2)

Traffic Study

Not started.

LOCAL AREA COMMITTEE WORK (continued)

TASKS

ISSUE

TARGET

COMMENTS

BFOHH LAC

Allington Lane (3)

Traffic Study

BFOHH section only. Not started.

Winchester Road, Fair Oak (4)

Accident Numbers

Reserve study. Not started.

BHH LAC

Bursledon Village

Speed Limit Review

Winter `04/05

Underway.

Hamble Lane/Portsmouth Road

30mph speed limit

Autumn `04

`After' speed surveys following completion of toucan crossing.

Coach Road area

Parking Surveys

Autumn `04

For verge parking problems. Not started.

BHH LAC

Review of studies already undertaken (1)

Review

Includes following studies:

Portsmouth Road (2000)

Ingleside (2001)

Satchell Lane (2001)

Hound Road (2001)

Woolston Road (2001)

Station Rd/Victoria Rd (2002)

Hamble Lane (2003)

Grange Road: Victoria Road to Portsmouth Road (2)

Traffic Study

Not started.

Lionheart Way (3)

Traffic Study

Not started.

New Road, Netley

Speed survey

Not started.

CFH LAC

Chandler's Ford Railway Station

`After' parking surveys

September `04

HCC carrying out surveys in September '04. Await to hear if any action required from EBC.

Winchester Road

`Hatched' centre lines

Autumn `04

`After' speed survey.

North Millers Dale (1)

Traffic Study

Not started.

Bournemouth Road (2)

Traffic Study

Not started.

School Lane (3)

Traffic Study

Not started.

Leigh Road: Bournemouth Road to M3 north sliproad (4)

Traffic Study

Not started. To be funded from the Traffic and Road Safety Issues budget.

Ashdown Road (5)

Traffic study

Reserve study. Not started.

Winchester Road, Shell Garage

Monitoring of Pedestrian Movements

2005

Deferred until re-development started.

ELAC

Westfield Road

Traffic Study

Winter `04/05

Not Started.

Stoneham Lane

40mph speed limit

`After' speed survey. Wait until toucan crossing constructed.

LOCAL AREA COMMITTEE WORK (continued)

TRO

ISSUE

TARGET

COMMENTS

ELAC

Nightingale Avenue area

Verge Parking Study

Not started.

Woodside Avenue (1)

Traffic Study

Not started.

Chestnut Avenue (2)

Traffic Study

Not started.

Passfield Avenue (3)

Traffic Study

Not started.

St Catherines Road (4)

Traffic Study

Not started.

Bishopstoke Road: Southampton Road to Chickenhall Lane (5)

Traffic Study

Not started.

HEWEB LAC

Winchester Road/Street/ Boorley Green

Traffic study/Accident numbers

Autumn `04

Underway. To go to LAC after October.

Grange Road (After Study)

Review of traffic speed after study

Autumn `04

Waiting for speed gun to be repaired.

Area surrounding Freegrounds Schools: Hobb Lane, Sovereign Drive and Bedford Close. (1)

Traffic Study

Not started.

Allington Lane: HEWEB section (2)

Traffic Study

Not started.

Burnetts Lane

Traffic Count

LAC allocated funding.

OTHER AGENCY WORK

TASKS

ISSUE

TARGET

COMMENTS

Public/Councillor Enquiries

Ongoing

DDPBs

New applications & assessments

Ongoing

DDPBs

Annual Review

Autumn `04

Signing/Lining

Implementation

Ongoing

QBP

Poles, flags, new shelters, hard-standings

2004/05

Work to start shortly.

Street Name Plates

Implementation & Maintenance

Ongoing

E/L, BFOHH and CFH orders complete. Part of HEWEB done. Started work on BHH.

Bus Shelters

Maintenance

Ongoing

Re-chargeable works

i.e. Tourist Signs

Ongoing

Parking around Barton Peveril/Eastleigh Colleges

Prepare revised brief for consultants.

Autumn `04

OTHER COMMITMENTS

Road Safety Council

Ongoing

Most recent meeting was in July.