Archived decisions

Hampshire County Council

Havant Highway and Transport Advisory Panel

2 November 2004

Highway Maintenance and Minor Capital Works
Programmes 2004/05

Report of the Director of Environment

Item 7

Contact: Peter Mitchell, Tel 023 9244 6159 email [email protected]

1. Summary

1.1 This report outlines progress with regard to the 2004/05 Highway Maintenance and Minor Capital Works programmes and gives an update on the 2004/05 Highway Maintenance budget. Two important issues for the Environment Department, namely the Traffic Management Act 2004 and Asset Management, are also discussed.

2. Background

2.1 As previously reported, the Highway Maintenance programme is funded from both revenue and capital allocations.

2.2 The revenue maintenance programme funds minor works, such as pothole repairs and routine drainage work, including gully cleaning, signs and road markings, environmental maintenance of grass verges, trees and shrubs, weed control and highway emergencies. Minor bridge works and winter maintenance are also funded from revenue. Budget allocations are set at a level that ensures the safety and serviceability of the highway network.

2.3 The capital maintenance programme funds planned maintenance, including special maintenance, resurfacing and surface dressing, and also provides for essential repairs to the structure of the highway, for example surface patching works.

3. Highway Maintenance Budget and Programme 2004/05

3.1 The county-wide Highway Maintenance budget for 2004/05, approved by the Executive Member for Environment, is £52,513,000. This sum comprises £21,284,000 revenue funding and £31,229,000 funding from the capital programme provision. From this overall budget, £26,868,000 is used to fund centrally managed services and programmes, such as street lighting, bridge works, surface dressing, winter maintenance and performance related elements of the highways term maintenance contract. The remainder is distributed across the 11 districts for local service delivery.

    Revenue Maintenance Budget and Programme

3.2 The total revised allocation for Havant for 2004/05 is £593,000. Progress throughout the year has been in line with the spend profile and it is expected that the programme will be completed within time and budget constraints. A budget monitoring statement is attached at Appendix 1.

    Capital Maintenance Budget and Programme

3.3 The total allocation for Havant for 2004/05 is £1,072,000, which includes £456,000 from the £3.5 million county-wide additional funding to improve highway maintenance. The funding allocation for the capital maintenance `planned works' programme is based on the proven Highways Assessment of Maintenance Priorities (HAMP) rating system and reflects the agreed intervention levels. The HAMP rating intervention level directs funding to those maintenance schemes displaying a higher maintenance need. Planned structural maintenance repairs undertaken through the capital maintenance programme include surface dressing, special maintenance and resurfacing schemes.

3.4 As reported previously, an extra £1 million was awarded to Hampshire by the Government to address clay shrinkage problems associated with the long hot and dry summer of 2003. A total of £43,000 was allocated to the Havant area for 2004/05 and this will be used to treat areas of carriageway affected by the shrinkage within the borough.

3.5 This year's schemes are progressing well with the expectation that the planned maintenance programme will be delivered within time and budget constraints. Progress on this year's schemes is shown at Appendix 2.

3.6 Surface dressing is an extremely cost-effective way of prolonging the life of the carriageway, sealing cracks and restoring skid resistance. The total county-wide programme for 2004/05 is £2,727,000 (including approximately £700,000 for safety engineering related surface dressing) which is managed centrally. All sites on this year's programme for the Havant area have now been successfully treated and are listed at Appendix 2.

4. Minor Capital Works

4.1 The Minor Capital Works programme (also known as the Under £10,000 programme) is funded from the capital allocation based on the Local Transport Plan submission to the Department for Transport. A sum of £15,000 was allocated for Havant in 2004/05 and the schemes included in the programme are:

    (i) Beaulieu Avenue, Warren Park £5,000

      new footway

    (ii) A259 Havant Road, Emsworth £10,000

      removal of layby and widening of footway

      Total £15,000

    The Beaulieu Avenue footway is now complete and the outstanding works are scheduled to be completed by the end of the year.

5. Traffic Management Act 2004

5.1 The Traffic Management Act received Royal assent in July 2004 and places a new duty on the County Council to keep traffic moving and minimise congestion and disruption for all users of roads, footways and cycle tracks.

5.2 New and extended powers have been introduced to assist with this new duty, a key one being the requirement to appoint a Traffic Manager who will be the focal point within the authority with regard to activities that affect movement on the road network and to ensure the co-ordination of all works on the highway.

5.3 A new permit system for those wishing to work on the highway has been included, as well as improved works co-ordination, provision of better travel information to the public and de-criminalisation powers to give civil penalties for traffic violations. It is not yet clear when the new legislation will be brought into effect but it is anticipated that it will be introduced in stages, as the specific regulations and Codes of Practice are finalised.

5.4 There are powers for the Government to intervene should an authority not perform adequately in this new duty and performance measures will be developed for this.

5.5 The Environment Department is already well placed to meet most of the requirements but some organisational changes may be necessary to meet the challenges of the new Act. These are presently being considered.

6. Asset Management

6.1 New Government resource accounting rules and the Best Practice approach to the management of the highway network have led to the requirement to start development of Asset Management Plans in the UK for highway networks. Asset Management planning is a relatively new concept in the UK but is well established in New Zealand, Australia and the USA.

6.2 The basic principles are that the whole life value of the highway network asset is taken into account when considering deterioration, maintenance and improvements of the asset. This not only includes the structural condition of the highway network but also its serviceability; for example, making best use of the asset in the safest way. The Environment Department has for some time had policies and procedures which already form key elements of Asset Management planning but further development is now required. This includes such things as the need more accurately to record and to value the asset and to look at whole life costing, longer term needs and scheme strategies.

6.3 The County Surveyors' Society has produced an Asset Management framework for guidance and it will be a requirement to report on the progress of County Asset Management Plans as part of the LTP process.

6.4 Consultants OPUS, who are recognised as world leaders in this field, have been appointed to help with the development of Asset Management planning for the Environment Department.

Recommendation

That this report be noted.

Section 100 D - Local Government Act 1972 - background papers

The following documents disclose facts or matters on which this report, or an important part of it, is based and has been relied upon to a material extent in the preparation of this report.

NB the list excludes:

1.

Published works.

2.

Documents which disclose exempt or confidential information as defined in the Act.

TITLE

LOCATION

None

9029/PM

APPENDIX 1

HAMPSHIRE HIGHWAYS HAVANT

Original

Allocation

£

Revised

Allocation

£

Commitment(to 05/10/04)

%

Revenue Budget 2004/05

Routine Maintenance (carriageway, footway repairs)

£172,000

£172,000

55

Gully Cleansing

£5,000

£5,000

30

Aids to Movement ( signs and road markings )

£84,000

£84,000

86

Traffic Management TROs

£13,000

£21,000

44

Environmental ( grass, trees, shrubs )

£184,000

£186,000

100

Weed Control

£50,000

£50,000

91

Hazard Clearance

£75,000

£75,000

68

Total

£583,000

£593,000

79

Capital Budget 2004/05

Principal Roads

Principal Roads Routine Structural Repairs

£16,000

£16,000

78

Principal Roads Special Maintenance

Nil

Nil

N/A

Principal Roads Resurfacing

Nil

Nil

N/A

Total

£16,000

£16,000

78

Capital Budget 2004/05

Non-Principal Roads

Non-Principal Roads Routine Structural Repairs

£362,000

£362,000

67

Non-Principal Roads Special Maintenance

£139,000

£139,000

76

Non-Principal Roads Resurfacing

£41,000

£41,000

134

Resurfacing & Patching for Clay Shrinkage

Nil

£43,000

94

Additional Footway Maintenance (£3.5m)

£152,000

£369,000

101

Carriageway Haunch & Resurfacing (£3.5m)

£22,000

£87,000

95

Non-Principal Roads Tactile Paving Crossing Points

£15,000

£15,000

92

Total

£731,000

£1,056,000

87

Total Maintenance Budget Allocation for Havant

1,330,000

1,655,000

84