Archived decisions

Hampshire County Council

East Hampshire Highway and Transport Advisory Panel

5 November 2004

Highway Maintenance and Minor Capital Works
Programmes 2004/05

Report of the Director of Environment

Item 7

Contact: Michael Rolfe, tel 01730 266411 email: [email protected]

1. Summary

1.1 This report outlines progress with regard to the 2004/05 Highway Maintenance and Minor Capital Works programmes and gives an update on the 2004/05 Highway Maintenance budget. Two important issues for the Environment Department, namely the Traffic Management Act 2004 and Asset Management, are also discussed.

2. Background

2.1 As previously reported, the highway maintenance programme is funded from both revenue and capital allocations.

2.2 The revenue maintenance programme funds minor works such as pothole repairs, routine drainage work (including gully cleaning), signs and road markings, environmental maintenance of grass verges, trees and shrubs, weed control and highway emergencies. Minor bridge works and winter maintenance are also funded from revenue allocations. Budgets are set at a level that ensures the safety and serviceability of the highway network.

2.3 The capital maintenance programme funds planned maintenance, including special maintenance, resurfacing and surface dressing, and also provides for essential repairs to the structure of the highway, eg hot patching.

3. Highway Maintenance Budget and Programme 2004/05

3.1 The county-wide Highway Maintenance budget for 2004/05, approved by the Executive Member for Environment, is £52,513,000. This sum comprises £21,284,000 revenue funding and £31,229,000 funding from the capital programme provision. From this overall budget, £26,868,000 is used to fund centrally managed services and programmes such as street lighting, bridgeworks, surface dressing, winter maintenance and performance elements of the highways term maintenance contract. The remainder is spread across the 11 districts for local service delivery.

      Revenue Maintenance Budget and Programme

3.2 The total revised allocation for East Hampshire for 2004/05 is £686,000. Progress throughout the year has been in line with the spend profile and it is expected that the programme will be completed within time and budget constraints. A budget monitoring statement is included within Appendix 1.

      Capital Maintenance Budget and Programme

3.3 The total allocation for East Hampshire in 2004/05 is £2,245,000, which includes £343,000 additional funding to cover problems caused by clay shrinkage and £248,000 from the £3.5 million county-wide additional funding to improve highway maintenance. The funding allocation for the capital maintenance `planned works' programme is based on the proven Highways Assessment of Maintenance Priorities (HAMP) rating system and has reflected the agreed intervention levels. The HAMP rating intervention level directs funding to those maintenance schemes displaying a higher maintenance need. Planned maintenance repairs undertaken through the capital maintenance programme include surface dressing, special maintenance and resurfacing schemes.

3.4 As reported previously, an extra £1 million was awarded to Hampshire by the Government to address clay shrinkage problems associated with the long hot and dry summer of 2003. A total of £343,000 was allocated to the East Hampshire area for 2004/05 and this has already been spent to treat areas of footway and carriageway affected by shrinkage.

3.5 This year's schemes are progressing well with the expectation that the `planned' maintenance programme will be delivered within time and budget constraints. Progress on this year's schemes is shown in Appendix 2.

3.6 Surface dressing is an extremely cost-effective way of prolonging the life of the carriageway, sealing any existing cracks and restoring skid resistance. The total county-wide programme for 2004/05 is £2,727,000 (including approximately £700,000 for safety engineering related surface dressing) which is managed centrally. All sites in this year's programme for the East Hampshire area have now been successfully treated. This year's schemes are listed in Appendix 2.

4. Minor Capital Works

4.1 The Minor Capital Works programme (also known as the Under £10,000 programme) is funded from the capital allocation based on the Local Transport Plan submission to the Department for Transport. A total of £17,000 was allocated for the East Hampshire area in 2004/05 and the schemes included in the programme are:

        (i) Anstey Bridge to Bentley Station, Bentley

            new footway £10,000

      (ii) South Green farm to Anstey Bridge

          new footway £7,000

          Total £17,000

      Both schemes have now been designed and will be constructed shortly.

5. Traffic Management Act 2004

5.1 The Traffic Management Act received Royal Assent in July 2004 and places a new duty on the County Council to keep traffic moving and minimise congestion and disruption for all users of roads, footways and cycle tracks.

5.2 New and extended powers have been introduced to assist with this new duty, key of which is the requirement to appoint a Traffic Manager who will be the focal point within the authority with regard to activities that affect movement on the road network and to ensure the co-ordination of all works on the highway.

5.3 A new permit system for those wishing to work on the highway has been included, as well as improved works coordination, provision of better travel information to the public and decriminalisation powers to give civil penalties for traffic violations. It is not clear yet when the new legislation will be enacted but it is anticipated that it will be introduced in stages as the specific regulations and Codes of Practice are finalised.

5.4 There are powers for the Government to intervene should an Authority not perform adequately in this new duty and performance measures will be developed for this.

5.5 The Environment Department is already well placed to meet most of the requirements but some organisational changes may be required to meet the challenges of the new Act. These are presently being considered.

6. Asset Management

6.1 New Government resource accounting rules and the Best Practice approach to the management of the highway network have led to the requirement to start development of Asset Management Plans in the UK for highway networks. Asset Management planning is a relatively new concept in the UK but is well established in New Zealand, Australia and the USA.

6.2 The basic principles are that the whole life value of the highway network asset is taken into account when considering deterioration, maintenance and improvements of the asset. This not only includes the structural condition of the highway network but also its `serviceability', eg making best use of the asset in the safest way. The Environment Department has for some time had policies and procedures which already form key elements of Asset Management planning but further development is now required. This includes things such as the need to more accurately record and value the asset and look at whole life costing, longer term needs and scheme strategies.

6.3 The County Surveyors' Society has produced an Asset Management framework for guidance and it will be a requirement to report on the progress of County Asset Management Plans as part of the LTP process.

6.4 Consultants OPUS, who are recognised as world leaders in this field, have been appointed to help with the development of Asset Management planning for the Environment Department.

Recommendation

That progress on the highway maintenance programmes be noted.

Section 100 D - Local Government Act 1972 - background papers

The following documents disclose facts or matters on which this report, or an important part of it, is based and has been relied upon to a material extent in the preparation of this report.

NB the list excludes:

1.

Published works.

2.

Documents which disclose exempt or confidential information as defined in the Act.

TITLE

LOCATION

None

8992/MR

    APPENDIX 1

 

2004/5

original current

allocation allocation

% committed

     

Revenue Budget 2004/05

   
     

Routine Maintenance (carriageway, footway repairs)

£336,000 £369,000

 

Gully Cleansing

£30,000 £30,000

 

Aids to Movement (signs and road markings)

£65,000 £65,000

 

EHDC District grass cutting

£104,000 £104,000

 

Environmental (grass, shrubs)

£62,000 £62,000

 

Weed Control

£36,000 £36,000

 

Hazard Clearance

£20,000 £20,000

 

Total

£653,000 £686,000

51%

     
     

Capital Budget 2004/05

Principal Roads

   

Principal Roads Routine Structural Repairs

£45,000 £45,000

 

Principal Roads Special Maintenance

£343,000 £343,000

 

Principal Roads Resurfacing

£46,000 £46,000

 
     

Capital Budget 2004/05

Non-Principal Roads

   

Non-Principal Roads Routine Structural Repairs

£383,000 £383,000

 

Non-Principal Roads Special Maintenance

£181,000 £181,000

 

Non-Principal Roads Resurfacing

£649,000 £649,000

 

Additional £3.5 m Footway Maintenance

£248,000 £248,000

 

Addition to cover clay shrinkage

Nil £343,000

 

Non-Principal Roads Tactile Paving Crossing Points

£7,000 £7,000

 

Total

£1,902,000 £2,245,000

66%

     

Total Maintenance Budget Allocation

£2,555,000 £2,931,000

63%

                 
 

Special Maintenance Programme

APPENDIX 2

 
                 
                 
             
                 

ROAD NO.

NAME

     

PARISH

WORK

STATUS

COST

                 

U211

Tankerdale Road

Liss

resurface

complete

25,000

U211

Willow Road

Liss

resurface

complete

34,000

U230

Cakerstream

 

Alton

resurface

complete

28,000

U227

Stancombe Lane

 

Shalden

resurface

complete

28,000

U230

Anstey Mill Lane

Alton

resurface

complete

25,000

U229

Lipscombe Rise

Alton

resurface

complete

21,000

U216

Borough Road

 

Petersfield

resurface

complete

23,000

U216

Bedford Road

Petersfield

resurface

complete

172,000

C197

Hewshott Lane

 

Bramshott & Liphook

resurface

complete

30,000

C114

Bradshott Lane

 

Selborne

resurface

complete

42,000

C154

Old Odiham Road

 

Alton

footway

complete

20,000

U214

High Cross Lane

Froxfield

footway

complete

 

A325

Camp Road Bordon

Whitehill

patching

complete

155,000

C154

School Lane Sheet

Sheet

footway

designed

30,000

C124

Old Odiham Road Alton

Alton

footway

completed

20,000

U219

Prospect Lane Rowlands Castle

Rowlands Castle

haunching

deferred

60,000

U216

The Causeway service road Petersfield

Petersfield

haunching

deferred

52,000

C138

Hawkley Road Hawkley

Hawkley

haunching

complete

45,000

C124

Old Odiham Road Alton

Alton

haunching

complete

106,000

U229

School Lane Bentley

Bentley

haunching

complete

25,000

U229

Blacknest Road Bentley

Bentley

haunching

deferred

 

U153

Bighton Hill Ropley

Ropley

cwy RS

 

26,000

A31

Winchester Road Ropley

Four Marks

footway

designed

19,000

A31

Winchester Road Four Marks

Four Marks

footway

designed

32,000

A31

Winchester Road Four Marks

Ropley

drainage

designed

50,000

U230

Cakerstream Alton

Alton

new footway

pending

3,000

C440

Town Centre Petersfield

Petersfield

cycleway

underway

120,000

U214

High Cross Lane Froxfield

Froxfield

footway

completed

 

C116

Catherington Lane Lovedean

Horndean

footway

underway

27,000

C18

Station Road/Winchester Road Petersfield

Petersfield

cwy RS

 

46,000

C98

High Thicket Road Dockenfield

Dockenfield

cwy RS

pending

 

U217

Ivy Orchard Clanfield

Clanfield

footway

pending

10,000

A339

Basingstoke Road Alton

Alton

footway

designing

54,000

A339

Whitedown Lane Alton

Alton

footway

designing

14,000

A31

Farnham Road Bentley

Bentley

cwy RS

 

22,000

B2070

London Road Adhurst

Sheet

drainage

deferred

33,000

B3006

Hill Brow Road Liss

Liss

drainage

deferred

98,000

U218

Bulls Copse Lane Horndean

Horndean

footway

designing

40,000

C98

Bentley Station (under £10,000 improvement)

Bentley

footway

designed

25,000

2004/5 Surface Dressing Programme

All schemes complete

Road no.

Road name/area

B3349

New Odiham Road Alton

B2149

Durrants Road Rowlands Castle

U227

Upper Soldridge Road Medsted

U227

Stancombe Lane Medsted

U228

Court Lane Ropley

U229

Woodfields Kingsley