Archived decisions
Hampshire County Council Executive Member - Environment 21 January 2005 Hamble Yacht Services Limited: Extension to Working Berths - Statutory Duties of the Harbour Authority Report of the Director of Environment |
Item 1 |
Contact: Tony Clatworthy, ext 01489 576387
email : [email protected]
1. Summary
1.1 The River Hamble Harbour Authority has been consulted and asked to comment on matters of navigational safety by the agencies referred to above. As part of the Harbour Authority's statutory duties it has to grant consent permitting harbour works in the navigation of the River Hamble, including works to modernise, extend and relocate pontoons. This consent is in addition to the planning permission required.
1.2 This is a re-submission following modification of the original proposals. This report recommends that consent be granted, subject to a number of conditions.
1.3 This report was deferred from 7 December 2004 meeting following deputations and the decision to undertake a site visit.
2. Details
2.1 Consent may be granted by the Harbour Authority permitting harbour works in the navigation of the River Hamble to accord with the Southampton Harbour Act 1924 and 1949, as amended by the River Hamble Harbour Revision Orders 1969 to 1989. Within the Harbour Authority's statutory duties lies the responsibility to ensure that all matters concerning navigational safety are addressed. This area of responsibility includes the area known as the Main Navigation Channel and other secondary and mooring channels in that location.
2.2 The proposed development will move the yard's working berths out into the river and displace a number of Crown Estate moorings. These moorings will be moved to a new pontoon further upstream from their present location. The new pontoon for the displaced moorings will also help remove a number of fore and aft moorings that tend to swing out into the main fairway, reducing the main channel and thereby causing a hazard to navigation.
3. Effects of the Development on Navigational Safety
3.1 The following points have been noted by the Harbour Master regarding navigational safety and are highlighted in the Risk Assessment attached to this report. These points were brought to the attention of the River Hamble Executive Member's Group on 26 July 2004, along with the engineering drawings of the proposed development numbered 2328-P-100, and again on 25 October with the following drawings: Bridge Arrangement SOL-1724-SC03-000 dated 30 September 2004; Proposed Arrangement SOL-1724-SC02-000 dated 30 September 2004; and Existing Arrangement SOL-1724-SC01-000 dated 30 September 2004.
3.2 The main fairway would be 70 metres wide at its upstream end, which would be 10 metres wider than with the G piles in place. The downstream end of the proposed pontooning would be directly over the location of the displaced G Piles, making the main channel 60 metres wide at that point.
3.3 The XODs departing and arriving back at their pontoon between F1 and F4 sometimes experience difficulties with the current situation as they are not fitted with engines and rely purely on the wind for propulsion. This can be a difficult departure and approach in low winds and strong tides. The proposed enlargement of the entry and exit gaps would allow the XODs direct access to their mooring pontoon. The proposed layout would therefore benefit the XODs and would be an improvement to safety.
3.4 The proposed new pontoon upstream above G27 would replace the current fore and aft moorings and would run for 132 metres. This pontoon would accommodate the displaced vessels from G20 to G25 public moorings. The replacing of the fore and aft moorings, which are double berths for vessels up to 35 feet, would overcome the problems experienced during strong tides and winds. At present, these moorings are forced out into the main channel in a westerly wind and into the mooring/access channel in an easterly wind. The replacement of these moorings would be a benefit to navigational safety and overcome the narrowing of the main channel width by as much as 10 to 12 metres during westerly winds.
3.5 The gap between the new pontoon and the pontoon at F5 to F7, which forms the access channel, would be fixed at 17.33 metres and would no longer be affected by the movement of the fore and aft moorings.
4. Hamble Yacht Services Limited Impact Assessment
4.1 The following is an impact assessment and a consolidation of the important points brought to the Harbour Master's attention by various groups during the consents process, along with explanations and in some cases recommendations by the Harbour Master to ensure navigational safety.
Impact on the Width of the Main Channel
4.2 The width of the main channel would not be altered in any way apart from increasing the width by ten metres at the upstream end of the proposed extension. The removal of the mooring piles from G20 to G24 would provide the extra width to the channel.
4.3 The installation of a pontoon on the eastern side of the river for the boat scrubber (immediately opposite Hamble Yacht Services Limited) would reduce the number of boats moored at that location to one only. At present, there could be up to four boats abreast on the visitors piles at that location.
4.4 The maximum beam of boats that would use the proposed outside berths at Hamble Yacht Services Limited is six metres (a Swan 82), including fendering. With a typical three metre boat width on the eastern side of the river there would be a main channel of between 51 and 61 metres. A 50 metre channel is safe at that location and would be exactly the same as at present, after taking into account the presence of moored vessels.
4.5 Removing the fore and aft moorings above G27 and installing a pontoon to relocate the displaced moorings would also improve navigational safety. Currently, vessels on the fore and aft moorings can be forced out into the main channel (in the prevailing westerly wind) or can be blown towards the shallower moorings reducing the manoeuvring space between them in an easterly wind. The movement of vessels on these moorings can be as much as 10 to 12 metres laterally. This does depend on the state of the tide and the wind direction. The movement of these vessels also effects the space available for vessels to manoeuvre through the gaps to reach their moorings. This is important for the XOD fleet.
Access and Egress for Other River Users
4.6 The proposed development would improve access to F pontoon for the XOD fleet by widening the available gap from the main channel, allowing them to sail directly onto the pontoon at two locations (from downstream and upstream of F pontoon) when returning to their moorings. These gaps are from the proposed outer upstream end of the Hamble Yacht Services Limited pontoon to G25 (a gap of 45 metres) and the gap between G27 and the downstream end of the proposed new G pontoon (a gap of 22 metres). These extended gaps would allow the XOD fleet and other vessels under sail or power to join the main channel safely.
4.7 Vessels proceeding downstream from inshore moorings and joining the flow of outbound traffic on the starboard side of the channel would have the full 45 metres gap available, which would allow them to join the flow of traffic at a shallow angle (in accordance with the Collision Regulations) and in complete safety.
Impact on Secondary/Access Channels
4.8 Should the development proceed, the secondary channel from upstream of G27 will be protected and will not be reduced by the movement of the fore and aft moorings.
Impact on Tenders Using the Proposed Tender Bridge
4.9 The proposed bridge has been designed to allow small tenders to use it and this is reflected in its dimensions: not less than 1.5 metres high and not less than 3 metres wide. The thwart height of a tender is unlikely to be more than 0.5 metres above the waterline and a man sitting would be approximately one metre above this. The proposed bridge gives 1.5 metres clearance, which is sufficient.
4.10 The bridge would be available at all states of the tide and a clear defined route would always be available which would be enforced by the harbour patrols and the Harbour Master.
4.11 The lateral depth of the bridge would only be three metres therefore a passing situation is unlikely to arise. The bridge would be part of a working marina complex and if difficulties arose tenders would have the option to come alongside or call for assistance.
4.12 A sign giving warning of clearance would be displayed at the entrance to the tender channel. Should tenders get into difficulties they may come alongside a yacht or pontoon or call for assistance. The route through the pontoon complex would be four metres wide at its narrowest and considerably wider than this where it passes the bow and stern of moored yachts. These wider points would provide adequate passing places for tenders and small craft .
4.13 The use of the bridge for tenders would be a much safer option than the present arrangement as tenders would no longer need to proceed into the main channel with its associated traffic, and they would be able to route upstream and return in an area of the river with less tidal stream.
Access and Egress for Vessels Using the Hamble Yacht Services Facilities
4.14 Vessels departing from the facility and using the proposed upstream Hamble Yacht Services Limited gap would also have the 45 metre gap available, which would give them excellent visibility of vessels moving down stream before moving into the main channel at a shallow angle.
4.15 Vessels entering the marina upstream to take up berths would have more room to manoeuvre than previously, making the approach safer. Inbound vessels would inevitably have to turn to cross the channel, into the path of outgoing traffic, as they do at present.
4.16 Vessels departing from Hamble Yacht Services Limited downstream exit would be protected by the proposed development and would be able to join the traffic flow at a shallow angle and every bit as safely as they do now.
Recommendation
That, under Section 10 of the Southampton Harbour Act 1924 and Section 48 of the Southampton Harbour Act 1949, as amended by the River Hamble Harbour Revision Orders 1969 to 1989, conditional consent be granted to Hamble Yacht Services Limited for harbour works in the navigation of the River Hamble, permitting Hamble Yacht Services Limited to extend the working berths G Pile moorings at Hamble Yacht Services Limited, as shown on the drawings supplied by Solent Marine Limited:
(i) Bridge Arrangement SOL-1724-SC03-000 dated 30 September 2004;
(ii) Proposed Arrangement SOL-1724-SC02-000 dated 30 September 2004;
(iii) Existing Arrangement SOL-1724-SC01-000 dated 30 September 2004; and
(iv) Drawing No. 2328/P/100 dated 1 November 2004;
and subject to the following conditions:
(i) No dredging to be involved;
(ii) That passage through the bridge designed for tenders be available at all states of the tide and access to this channel not to be blocked by moored vessels in the working berths. The access route to the bridge to have a four metre channel available to allow tenders to route through the pontoon complex at all times. The bridge, to allow tenders to pass through, must not be less than three metres wide and not less than 1.5 metres high. The bridge to be lit within, to enable those using it to identify the location;
(iii) Hamble Yacht Services Limited to meet the cost of erecting and maintaining signs on the piles at the entrance to the tender channel warning of the bridge clearance available;
(iv) Hamble Yacht Services Limited to meet the cost of establishing and maintaining a solar powered navigation light on the downstream pontoon pile and also to paint the pile in high visibility red paint (initial painting to be carried out upon installation);
(v) Hamble Yacht Services Limited to meet the cost of establishing and maintaining two vertical fixed red navigation lights on the upstream outermost pile/pontoon and paint the pile with high visibility red paint (initial painting to be carried out upon installation) all within one week of installation;
(vi) The above conditions must all be met within one week of installation of the new pontoon structure;
(vii) At no time is Hamble Yacht Services Limited to allow double berthing to take place on the outside face of the proposed jetty head; and
(viii) All other appropriate consents being obtained.
Section 100 D - Local Government Act 1972 - background papers | |
The following documents disclose facts or matters on which this report, or an important part of it, is based and has been relied upon to a material extent in the preparation of this report. | |
NB the list excludes: | |
1. |
Published works. |
2. |
Documents which disclose exempt or confidential information as defined in the Act. |
TITLE |
LOCATION |
Risk Assessment Report to the River Hamble Executive Member's Group on 26 July 2004 Report to Executive Member for Environment on 14 September 2004 Report to River Hamble Executive Member's Group on 25 October 2004 Report to Executive Member for Environment on 9 November 2004 |
Hamble Harbour Office Room 418, Ashburton Court West Hantsweb Room 418, Ashburton Court West Room 418, Ashburton Court West Hantsweb Room 418, Ashburton Court West |
9093Rpt-rev/TC
APPENDIX 1
RIVER HAMBLE HARBOUR AUTHORITY
PORT MARINE SAFETY CODE
RISK ASSESSMENT REPORT
NAVIGATION CHANNEL
ADJACENT
HAMBLE YACHT SERVICES
AND
ALTERATIONS TO G PILES
26 July 2004
1. INTRODUCTION
The Government looks to all Harbour Authorities to implement the requirements of the Port Marine Safety Code (The Code). The Code is intended to apply to all Harbour Authorities to the extent that they have duties and powers relating to marine safety.
It is particularly directed at Harbour Authorities and to Directors, Commissioners or Trustees who are members of the boards of such Harbour Authorities. The Code is not optional it applies to ports of all sizes, irrespective of resources or levels of traffic.
The Code represents the national standard against which policies, procedures and performance of Harbour Authorities may be measured. It is obligatory for the purpose of meeting the standard in the Code that measures are taken to reduce all risks associated with port marine operations to As Low As Reasonably Practical (ALARP).
1. SCOPE
The Code does not apply to duties and powers other than those related to marine operations. Marine operations are those that facilitate the safe use of a harbours by vessels. They include the direction of shipping and the regulation of safety of navigation in a harbour and the maintenance of aids to navigation within the jurisdiction of a harbour.
2. RISK ASSESSMENT
The Code requires that each Harbour Authority assess risks associated with marine operations and manages those risks to reduce them to As Low As Reasonably Possible (ALARP). Risk assessment is an ongoing process to this end the Risk Assessment has been carried out by the Harbour Master to consider the risks associated with the proposed development at Stone Pier Yard.
3. DEFINITIONS
For the purpose of this report the following definitions will apply:
A hazard is anything that can cause harm to a person, property or the environment;
A risk is the chance, high or low, that a person, property or the environment will be harmed by the hazard.
4. METHODOLOGY
To assess risks in The River Hamble 4 steps are followed:
1. Hazards are identified;
2. The consequence of the hazard materialised are assessed;
3. The risk and existing precautions are evaluated;
4. The findings are recorded.
It is also recognised that provision must be made to review and revise this assessment as necessary.
The aim of the Risk Assessment is to ensure that all of the significant hazards (potential accidents) associated with marine operations are identified and quantified in terms of risk to people, property and/or the environment.
This information provides an essential input to the continual development of The River Hamble Harbour Authority Safety Management System and will be used by the Harbour Authority as a rational basis on which to decide priorities and to set objectives for eliminating hazards and or reducing risks to As Low As Reasonably Practical.
The Risk Assessment identifies each hazard and then categorises them as either a collision, contact, grounding or a swamping hazard:
Collision:
Collision between two or more vessels which are underway, regardless of whether the vessel(s) are not under command or disabled in any way but excluding wrecks.
Contact:
A vessel striking, or being struck by, an external object or a vessel that is not underway (e.g. anchored or moored), excluding the sea bed.
Grounding:
A vessel coming to rest on, or riding across, underwater features or objects.
Swamping:
The excessive ingress of water over the gunwale of a vessel such that it becomes waterlogged and may sink.
An estimated degree of risk is assigned to each identified hazard to provide a relative rating between risks. The following scoring system has been applied:
LIKELIHOOD OF OCCURRENCE
SCORE: | |
Very Likely |
5 |
Probable |
4 |
Possible |
3 |
Remote |
2 |
Improbable |
1 |
To People: |
To Property: |
To Environment: |
Score: |
Fatal |
Catastrophic |
Major |
5 |
Major Injury |
Major damage |
Serious |
4 |
3 day + injury |
Severe damage |
Moderate |
3 |
Minor injury |
Minor damage |
Minor |
2 |
Accident/incident |
Negligible |
Negligible |
1 |
Each hazard has been assigned a score of 1 to 5 for the "likelihood of occurrence" and a score of 1 to 5 for "consequence". The "risk rating" has then been obtained by multiplying the two scores together giving a maximum rating of 25. The higher the rating the more serious the potential consequences. Rating risks help to give an indication of their significance.
As a guide it is considered that any "risk rating" of 12 and above, is not ALARP and therefore additional precautions should be implemented to ensure compliance with the Code.
RISK ASSESSMENT FOR THE PROPOSED DEVELOPMENT OF HAMBLE YACHT SERVICES
Serial: |
Hazard: |
Likelihood: |
Consequences: |
Highest Risk Rating: | ||||
People |
Property |
Environment |
||||||
1 |
Risk of Collision between vessels operating in the main channel. |
2 |
3 |
2 |
1 |
6 | ||
2 |
Risk of vessels running aground. |
1 |
1 |
1 |
1 |
1 | ||
3 |
Risk of collision with sailing vessels under sail by vessels operating in the main channel. |
3 |
2 |
2 |
1 |
6 | ||
4 |
Risk of collision with a moored vessel. |
3 |
2 |
2 |
1 |
6 | ||
5 |
Risk of swamping to small tenders and other small vessels with low freeboard navigating in the main channel outside the proposed working berths at HYS. |
3 |
3 |
2 |
1 |
9 | ||
6 |
Risk of collision or swamping of tenders during passage through the working berths and negotiating the proposed bridge system to be provided. |
2 |
1 |
1 |
1 |
2 | ||
7 |
Risk of collision by vessels in the main channel with dinghies/XOD entering and departing their moorings. |
3 |
3 |
3 |
1 |
9 | ||
Serial: |
Hazard: |
Likelihood: |
Consequences: |
Highest Risk Rating: | ||||
People |
Property |
Environment |
||||||
8 |
Risk of Dinghies/XOD being in collision or experiencing difficulties in departing or entering the main channel owing to wind or tide. |
3 |
3 |
3 |
1 |
9 | ||
9 |
Risk of collision to vessels departing, arriving or approaching the moorings on the lower F pontoon. XOD under sail with no engines. |
3 |
1 |
2 |
1 |
6 | ||
10 |
Risk of collision with commercial craft to include barges, hoppers and large leisure commercial craft. |
3 |
4 |
4 |
2 |
12 | ||
11 |
Risk of collision to vessels departing, arriving or approaching the moorings on the upstream F pontoon, using access gaps. |
2 |
2 |
2 |
1 |
4 | ||
12 |
Risk of collision to vessels departing, arriving or approaching the inner moorings between the F pontoon and the G Piles, using access gaps. |
2 |
2 |
2 |
1 |
4 | ||
13 |
Risk of collision with commercial craft operating to set/lay-out or repair moorings. |
2 |
2 |
2 |
1 |
4 | ||
Serial: |
Hazard: |
Likelihood: |
Consequences: |
Highest Risk Rating: | ||||
People |
Property |
Environment |
||||||
14 |
Risk of collision by vessels departing, arriving or approaching the upstream proposed working berths at HYS. |
2 |
2 |
2 |
2 |
4 | ||
15 |
Risk of collision to vessels approaching the fairway at the point of narrowing from 100 to 60 metres. |
2 |
2 |
2 |
2 |
4 | ||
5. RESULT OF RISK ASSESSMENT AND RISK MANAGEMENT
Of the 15 identified hazards 1 obtained risk ratings that would indicate that it would not at present be ALARP.
The following table lists precautions that would be introduced to manage the identified risks and therefore reducing the Highest Risk Rating to ALARP. These precautions reduce the risk to the figures denoted within the ( )
10 |
Risk of collision with commercial craft to include barges, hoppers and large leisure commercial craft |
3 (2) |
4 (3) |
4 (3) |
2 (3) |
12 (9) |
Precautions:
Control of entrance or departure to the river of all commercial craft. Commercial vessel deemed a danger will not be allowed entrance during periods of heavy volumes of traffic.
If necessary an escort will be given by the harbour patrol vessel.
The River Hamble Safety Management System will be amended to address these hazards so that identified risks will be managed to be as low as reasonably practical.
Full consideration will be given to the precautions identified above, reducing the Highest Risk Rating to below 12.
Precautions to be introduced:
(i) Harbour Authority to control the entrance or departure to the river of all commercial or large craft. Commercial and large vessel deemed a danger will not be allowed entrance during periods of heavy volumes of traffic. If necessary an escort will be given by the harbour patrol vessel.
(ii) Continue to educate those that use tenders and small dinghies to wear buoyancy aids or life jackets. To also carry torch and bailers etc.
(iii) To continue to make masters of larger vessels aware of the safety implications of travelling to fast and to ensure a good lookout is kept at all times by all masters and crews.
(iv) By using signage and other methods, attempt to make masters of vessels departing marinas reduce speed and to keep a good lookout for dinghies and small tenders.
6. CONCLUSION AND HARBOUR MASTER'S RECOMMENDATIONS
The Risk Assessment indicates that the proposed development will not result in the creation of any risks that are not considered to be As Low As Reasonably Practical and therefore all risks can be managed and reduced to As Low As Reasonably Practical, this accords with the Port Marine Safety Code.
Having carefully considered this Risk Assessment the Harbour Master recommends that the proposed development at Hamble Yacht Services will not adversely effect navigational safety.
6.1 The Harbour Masters also makes the following recommendations and comments;
(i) Hamble Yacht Services to establish a solar powered navigation light on the down stream outer pile and also paint the pile with high visibility red paint.
(ii) Hamble Yacht Services to establish two vertical fixed red lights at the upstream outer pontoon and also paint the pile with high visibility red paint.
(iii) Hamble Yacht services to design the ends of the pontoons, and pile guides to be rounded and fixed with fendering.
(iv) The XOD fleet, in the main, is sailed by dedicated and experienced sailors who understand the risks and manage those risk successfully every week when sailing in the river. Even so, because the river is changing and the type of vessel and those that operate them are changing, a new mooring location should be investigated. Ideally any new location should afford the same shelter and give easy and direct access to the entrance of the river. Negotiations between the Crown Estates and the XOD fleet should be encouraged by the Harbour Authority.
(v) Even though the bridge is being supplied to allow tenders to transit the proposed new working berths within Hamble Yacht Services the Harbour Master would recommend the following:
(1) Those in small craft such as tenders would be recommended not to transit the river on the western side owing to the dangers of proceeding around the fuel berth and the seven blind exits from Port Hamble Marina. A small craft such as a tender with low freeboard will be difficult to see from a craft exiting the marina and would be liable for swamping or collision.
(2) Rowing boats would be safer to proceed on the eastern side of the river as this is deemed a safer route by the Harbour Master for the reasons given above and the tidal strength on the eastern side is weaker at this point of the river.
(3) The Harbour Master would recommend to all who use tenders to wear lifejackets and to carry aboard the recommended safety equipment for dinghies and tenders.
7. ONGOING RISK ASSESSMENTS
The assessments of risks is an ongoing process. This Risk Assessment will be regularly reviewed and updated and/or amended as appropriate. New risks that emerge as conditions or the use of the harbour change will be given immediate attention.
Risk assessment and the management of risks is a continual process.
AG Clatworthy
Harbour Master
26 October 2004
APPENDIX
Index to Points Raised by Deputations at the Executive Member's Decision Day on 9 November 2004
Concerning Navigational Safety
Point Raised |
Reference within the report |
1. Unacceptable narrowing of the fairway. |
Paragraph 4.2, 4.3, 4.4 and 4.5 |
2. The effective permanent reduction in the width of the River combined with the other effects to be identified will create an unacceptable position. |
Paragraph 4.2, 4.3, 4.4 and 4.5 |
3. A reduction of the main fairway by 43%. |
Paragraph 4.2, 4.3, 4.4 and 4.5 |
4. The berthing of large vessels would hamper the main channel. |
The 45 metre gap allows sufficient room for vessels to manoeuvre into the berths upstream of the proposed development. Vessels would be able to come alongside the proposed outer berths easily. Paragraph 4.14, 4.15, 4.16 |
5. The 22 metre gap north of the proposed development presents an unacceptable risk. |
The gap is 45 metres. Paragraph 3.3, 4.6 Paragraph 4.14, 4.15, 4.16 |
6. The gap between F4 and the southern end of the new pontoon is potentially hazardous. |
Paragraph 3.3, 4.6 |
7. Vessels without engines will experience significant difficulties. |
Paragraph 3.3 |
8. Vessel to the west of the G piles who do not use the exits downstream will have to navigate in shallower water. |
This is no change from the current situation. |
9. Vessels departing HYS will experience difficulties. |
The 45 metre gap allows sufficient room for vessels to manoeuvre into the berths upstream of the proposed development. Vessels would be able to come alongside the proposed outer berths easily. Paragraph 4.14, 4.15, 4.16 . |
10. Effect of tenders and small craft using the westerly passage. |
Dinghies do not sail along narrow channels unless the wind happens to be in the right direction. Normally dinghies tack across all channels making use of the whole River. |
11. Obstructed access the secondary channel for small craft and tenders. |
Paragraph 4.9, 4.10, 4.11, 4.12, 4.13 |
12. Lack of passing places within the proposed development for tenders. |
Paragraph 4.11, 4.12 |
13. All small vessels above 1.5 metres will not be able to use the bridge. |
1.5 metres head room is thought to be sufficient clearance for a small tender. Vessel with a beam of more than two metres might reasonably be expected to use the main channel in comparative safety. |
14. Crossing the main channel twice on a journey upstream increases the risk. |
The route through the RAFYC, RSYC past the fuel berth and the many entrances of Port Hamble is not recommended and is considered more dangerous than crossing the fairway. This is a decision that must be taken considering wind, tide and volume of traffic at the time of the journey. |
Point Raised |
Response |
15. Serial 6 of the Risk Assessment deals with the risk of collision or swamping of tenders using the passage through the working berths, and the scoring is 2,1,1,1, giving a highest risk of only 2. Compare this with serial 8 in the Hamble Jetty to Port Hamble Risk Assessment where the scoring is 3,3,2,1 giving a higher risk rating of 9. It might be assumed that the risk rating should be similar. |
15a. The two locations are dissimilar in many ways as the RSYC and RAFYC channels are more dangerous to tenders than the area in the proposed development. Tenders could meet RIBs and larger vessels coming head-on, club launches arriving and departing. And other small and large craft who's helms may not have sight of a small tender. The higher scoring was deliberate to envisage the dangers of proceeding through the RAFYC and RSYC passage. Risk assessments should not be quoted outside of other factors that impact on them. |
16. Serial 8 of the HYS Risk Assessment received a scoring of 3,3,3,1 with a scoring of 9 this sounds very similar to serial 17 of the Stone Pier Yard Risk Assessment where the risk to sailing dinghies entering the main channel. In that assessment the scoring was 3,5,2,1 with a scoring of 15. |
16a. Dinghies moving out into the main channel downstream of Stone Pier Yard must go directly out into the channel against the flow of traffic. They must negotiate vessels approaching or manoeuvring in and around the fuel jetty. The visibility is poor looking upstream because of the fuel jetty and its height. They must negotiate the fore and aft moorings on the edge of the main channel. For craft to join the main channel upstream of HYS they will be moving with the main flow of traffic. They will have a gap of 44 metres to merge into the main channel, which is an ample distance both for large sailing boats and XODs. Risk assessments should not be quoted outside of other factors that impact on them. |
17. The Mooring Holders Association does not accept that it will be practical at all times to secure a number of conditions relating to the use of the proposed facility. |
17a. The policing of the River is the responsibility of the Harbour Master and his staff. |
18. Definition of a Working Berth. |
18a. A Working Berth is used by a boatyard to berth vessels undergoing a refit, repairs or final completion of a build on the water. It will also be used for the berthing of vessel during trials. The boatyard is used mainly by visiting and local performance racing boats who undergo prolonged sea trials during fitting out of new equipment and rigging. The fitting out and maintenance of larger ocean going vessels is also undertaken. |
19. The impact of the proposed development on the capacity of the River and the implications for the provisions of moorings including providing a range of moorings. |
19a The provision of mooring types is not a matter for the Harbour Authority but a matter for those that own and provide them such as The Crown Estates, the Yacht Clubs and the commercial and marina operators. The Harbour Master has stated that the proposed development will not have a detrimental effect on the safety of navigation. |
20. Mooring of vessels within the 16 metres width available will not leave sufficient room for tenders. |
20a. The Harbour Master has set a limit of 4 metres to be left available for tenders to have access to the bridge designed for the use of tenders. On discussions with the yard owner a compromise in berthing vessels to enable those limits is easily achieved. The following dimensions are an example. A Swan 82 with a beam of 5.86 + fendering of .5 of a metre and Swan 56 with a beam of 4.73 metres with fendering of .5 metre leaves a channel of approximately 4.5 metres available for tenders. |
21. The route for tenders will not allow a 3.5 or 4 metre beamed tender to proceed through the designated channel. |
21a. The average beam of a small tender is 1¼ metres and the largest 1½ metres. A small boat with a beam of 2 metres or more would not be classed as a tender. |
22. The Risk Assessment of the 14 September suggested that the proposed development should only be permitted to extend out 23 metres. Why has that danger disappeared. |
22a. The introduction of a bridge in the proposed development allowing tenders to route through the development removed the danger of small tenders having to face oncoming vessels in the main fairway. |
23. There are concerns that the XODs have not been consulted on the amended plan and other stakeholders have also indicated the lack of being informed. |
23a The XOD fleet was represented at the initial consultation when all of their fears were recorded in detail. The Harbour Master visited the location on four Wednesday evenings and on one Saturday to observe the departure and sailing back onto the F pontoon by the XOD fleet. The Harbour Master, who has an understanding of the handling of this type of boat, is of the opinion that the proposed gaps of 44 metres downstream and 22 metres upstream, to allow the XODs to join the main channel or enter it, is safe and in some respects a better option that the current situation. See paragraph 3.3 of the background report and 6. (iv) of the Risk Assessment. The Harbour Master met with the Captain of the XOD fleet on Wednesday 24 November to discuss the new proposed plans and arrived at the following: (i) XODs moored on the F pontoon will have a very clear approach and departure route through the 45 and 22 metre gaps. (ii) XODs will have a limited view upstream when entering the main channel through the 45 metre gap at the downstream end of F pontoon. They will have a safety space of 22 metres in which to join and merge with the traffic flow. (iii) The upstream end of the F pontoon will be more accessible because the proposed pontoon has been moved to increase the gap available to 22 metres allowing boats to sail around the upstream end of F pontoon. This increased gap will also allow a better return approach to the F pontoon from the main channel. (iv) XODs moored on the eastern side of F pontoon may have difficulties in departing in low wind speeds with the tide on the ebb. This can be overcome by preparation and walking the boat around to a better departure point. This option may not be available owing to other boats. (v) XODs will be forced into the 60 metre main channel when returning to their mooring and will not have a direct approach to the F pontoon. They will also have to compete with the traffic flow. (vi) The XODs consider the proposed plans for HYS as on one hand introducing some new difficulties but at the same time providing safer and better conditions than those currently available. These considerations are dependant on the state of the tide, the wind direction and its strength. (vii) The risk of an incident may exist during very difficult conditions such as an ebb tide with little wind, when boats will have no steerage on. The conditions at the time and the decision to sail in those conditions is the responsibility of the skipper and is a decision which can be made by made by him alone. (viii) XODs do depart the moorings knowing that they may return on an unfavourable tide and in a reduced wind. The sailing and control of a 22 foot sailing keel boat that is not fitted with an engine can be challenging. Having to proceed for one mile through moorings and moving craft in the main fairway, sometimes in light winds, against the tide and wind, must be considered as a risk. Therefore the Harbour Master draws attention to the Harbour Masters comments in the Risk Assessment paragraph 6. (iv). |
24. The Warsash (east side) of the River Hamble is more exposed to the prevailing wind, so in windy conditions, it is safer for small dinghies to proceed up and down river on the west side. |
24a The Warsash Sailing Club members use the eastern side of the River to travel to their moorings. Others who launch their tenders at Warsash use the eastern side of the River. The oxers and other dinghies hold meetings and training takes place for juniors on the eastern side of the River every week. The route through the RAFYC, RSYC channels and then past the fuel berth and the many entrances of Port Hamble are more dangerous than crossing the fairway. This is a decision that must be taken considering wind, tide and volume of traffic at the time of the journey. |
Index to Points Raised by Deputations at the Executive Member's Decision Day on 9 November 2004
Not Concerning Navigational Safety
Points Raised |
Response |
(i) Viability and the business case for the proposed development. |
The Harbour Authority supports the provision of a range of affordable moorings and, whenever possible puts the case forward on behalf of mooring holders. |
(ii) Comparison of Hamble Yacht Services with Moody's. | |
(iii) Comparison of working berths and marina. | |
(iv) To encourage the Crown Estate's Commissioners to accept that they owe a duty of responsibility to the local population to provide a range of affordable moorings. |
APPENDIX 2
Hampshire County Council River Hamble Executive Member's Group 26 July 2004 Hamble Yacht Services Extension to Working Berths Report of the Director of Environment |
Item 3 |
Contact: Tony Clatworthy, tel 01489 576387
email: [email protected]
1. Consents: Hamble Yacht Services
1.1 Attached are the details of the proposed new layout of Hamble Yacht Services and the risk assessment completed by the Harbour Master for the proposed redevelopment and how it will affect navigational safety. The plans are supplied by Hamble Yacht Services Limited (HYS) and produced and supplied by John Pattisson Associates Limited. Plans of the proposed layout will also be displayed at the meeting. The plans give details of the old pontoon layout, the intended rebuild locations, Sites of Special Scientific Interest areas, mooring restricted areas and secondary channels. The Harbour Authority has been asked to comment on these plans by Eastleigh Borough Council and at a latter stage by other planning consent agencies.
1.2 Held in the Harbour Office is a copy of the Environmental Report to Inform Appropriate Assessment (under Regulations 48 of the Conservation (Natural Habitats & C) Regulations 1994). This will be available at the meeting.
1.3 The proposed development is a continuation of the phased development and improvements as set out in the report to the Executive Member for Environment dated 13 December 2001.
2. Corporate Strategy
2.1 The decision supports Aims 1 to 5 of the Corporate Strategy (Maximising Life Opportunities, Stewardship of the Environment, Achieving Economic Prosperity, Building Strong and Safe Communities, and Improving Services) by contributing to the statutory duties entailed in the management of the River Hamble.
3. Introduction
3.1 The proposed development of HYS has been the subject of discussions and consultations with stakeholders and interested parties by HYS and the Crown Estate for more than 18 months.
3.2 The Harbour Master has had detailed consultation with all stakeholders and also organised a site visit to discuss the issues. The proposed development has been altered and adjusted many times following consultations with those affected and other user groups. The plan to extend the working berths and move the displaced moorings remains the subject of some concern by various river users. Concerns and remarks relevant to the safety of navigation have been taken into account during the investigation and completion of the risk assessment by the Harbour Master.
4. Background and Commercial Brief
4.1 The Harbour Master is only commenting on navigational safety but this brief has been included to set out the background and inform Members of the reasons behind the proposed development.
4.2 Hamble Yacht Services Limited (HYS), which operates from Port Hamble Marina on the western shore of the River, is one of the leading service providers to the performance yachting sector in the United Kingdom (UK). HYS is an independent company which, over the last eight years, has progressed with a plan to refurbish the buildings in order to make it a centre of excellence in boat repair and maintenance. Boats ranging from 34 foot to 80 foot are constructed and commissioned in the yard. HYS is also the UK agent for Swan Nauter and therefore requires permanent dedicated berthing for yachts up to 80 foot, together with suitable electricity supplies and other services to enable the yachts to be serviced efficiently.
4.3 HYS is an important local employer with a permanent staff of around 75, employing all the marine trades and fully supporting an apprenticeship scheme which continues to train youths in the marine industry skills. Other small businesses located in and around the yard employ a further 100 people who largely rely on HYS to provide the customer base.
4.4 The proposed development is intended to allow the streamlining of operations at the boatyard and specifically to enable the yard to accommodate 80 foot maxi yachts, which currently experience difficulty getting alongside. It is expected that the proposed development will allow HYS to increase its staff by around 10 people.
5. Effects of the Development Affecting Navigational Safety
5.1 The following points have been noted by the Harbour Master regarding navigational safety and are highlighted from the risk assessment - a copy of which is attached. Copies of the submitted chart and that of the Harbour Master's recommendation are also attached.
(i) The extension of the working berths removes the direct approach to the pontoon mooring area on the F piles used by the XOD boats. The loss of this area has been the main comment from stakeholders who would be forced out into oncoming vessels in the main channel. The area taken up by the pontoon extension is also used by boats and small tenders to gain access to the moorings area further upstream. It allows direct access to the channel running between the F and G piles. It is therefore necessary for the safety of small vessels and sailing vessels without engines to only allow the working berths to extend out to 23 metres, not 35 metres. On further investigation the Harbour Master decided that the gap would better serve navigational safety if pile G25 was also removed, making the gap 50 metres. The pile guide and pontoon will also be rounded off and fendering will be fixed to reduce damage should vessels find themselves in difficulties. The developer has investigated this modification and may make it standard throughout the modifications. The gap will give good sailing access to the F pontoon and also to the mooring channel upstream from the proposed development (marked 1 on the chart).
(ii) The installation of the Boatscrubber pontoon on pile HP15 to HP16 on the eastern side of the river will introduce a small amount of traffic to that area. This is not thought to be significant (marked 2 on the chart). This traffic will not alter significantly from the present visiting vessels that use the moorings. It will also reduce the amount of space taken, as normally four to eight boats raft out at this location.
(iii) The main fairway will be 70 metres, which is 10 metres wider than when the G piles were in place (marked 3 on the chart).
(iv) The access gap between the upstream pontoon of the proposed development and mooring pile (now) G25 will be 50 metres - see (i) above (marked 4 on the chart).
(v) The XODs departing and arriving back at their pontoon between F1 and F4 may have difficulties as they are not fitted with engines and rely purely on the wind for propulsion. This can be a difficult departure and approach in low winds and strong tides. An XOD may have difficulty in entering the main channel when the volume of traffic is high. See (i) above with reference to the 50 metres access gap (marked 5 on the chart).
(vi) The gap between pile G27 and the proposed new pontoon should be increased to 22 metres to allow sailing vessels, XODs, to round the upstream end of the F pontoon. This can be achieved by reducing the 22 metre gap upstream of this pontoon to 15 metres (marked 6 and 9 on the chart).
(vii) The proposed new pontoon will replace the current fore and aft moorings and will run for 24 metres. This pontoon will accommodate the displaced vessels from G20 to G25 public moorings. The replacing of the fore and aft moorings, which are double berths for vessels up to 35 feet, will halt the problems experienced during strong tides and winds. These moorings are forced out into the main channel or westwards therefore reducing the channel by F5 to F7. The replacement of these moorings will be a benefit to navigational safety and halt the reduction of the channel width of up to 10 to 12 metres during strong westerly winds (marked 7 on the chart).
(viii) The gap between the new pontoon and the pontoon at F5 to F7, which forms the access channel, will be fixed at 17.33 metres and will no longer be affected by the movement of the fore and aft moorings (marked 8 on the chart).
(ix) The gap between the upstream end of the proposed pontoon and the remaining G piles will be 17 metres (marked 9 on the chart).
6. Summary
6.1 The proposed development places another obstacle for tenders and dinghies attempting to move into the access channel and to the moorings area upstream of HYS. This obstacle is no different from that of others found on the river which are negotiated safely by tenders and dinghies.
6.2 The 50 metre gap will allow the XOD fleet direct access to the F pontoon. This gap will also be sufficient for vessels to enter and depart the main channel safely.
6.3 It is worth noting that the Harbour Master classes the westerly route along the outside of Port Hamble as dangerous for small tenders. Vessels depart from Port Hamble suddenly appearing and proceeding into the main channel at speed. Even harbour patrol launches have experienced difficulties with inexperienced skippers suddenly appearing and charging into the main channel.
Recommendation
That under Section 10 of the Southampton Harbour Act 1924 and Section 48 of the Southampton Harbour Act 1949, the Executive Member be advised to grant consent for the harbour works as set out in the drawings supplied and recorded as John Pattisson Associates drawing number 2328-P-100 (extension to working berths) dated January 2004, subject to the following alterations and conditions, that:
(i) no dredging is involved;
(ii) the plan be modified to overcome the navigational safety issues. These modifications to be:
(a) the working berths restricted to extending 23 metres and not 35 metres out into the main channel as proposed on the drawings;
(b) pile G25 to be removed; and
(c) the gap between pile G27 and the downstream end of the new pontoon to be 22 metres;
(iii) Hamble Yacht Services obtains consent of the Crown Estate and meets the cost of any additional rent;
(iv) Hamble Yacht Services meets the cost of establishing and maintaining a solar powered navigation light on the downstream pontoon pile and also to paint the pile in high visibility red paint;
(v) Hamble Yacht Services establishes and maintains two vertical fixed red navigation lights on the upstream outermost pile/pontoon and paints the pile with high visibility red paint; and
(vi) all other appropriate consents are obtained.
Section 100 D - Local Government Act 1972 - background papers | |
The following documents disclose facts or matters on which this report, or an important part of it, is based and has been relied upon to a material extent in the preparation of this report. | |
NB the list excludes: | |
1. |
Published works. |
2. |
Documents which disclose exempt or confidential information as defined in the Act. |
TITLE |
LOCATION |
None. |
8840/TC
APPENDIX 3
Hampshire County Council Executive Member - Environment 14 September 2004 Hamble Yacht Services Limited: Extension to Working Berths - Statutory Duties of the Harbour Authority Report of the Director of Environment |
Item |
Contact: Tony Clatworthy, ext 01489 576387
email : [email protected]
1. Summary
1.1 The following decision is sought:
That, under Section 10 of the Southampton Harbour Act 1924 and Section 48 of the Southampton Harbour Act 1949, as amended by the River Hamble Harbour Revision Orders 1969 to 1986, conditional consent be granted to Hamble Yacht Services Limited for harbour works in the navigation of the River Hamble, permitting Hamble Yacht Services Limited to modernise, extend and relocate its pontooning at Hamble Yacht Services Limited, as shown on the drawing supplied by John Pattison Associates Limited (drawing number 2328-P-100) and displayed at the River Hamble Executive Member's Group at Warsash on 26 July, and the two sketch drawings supplied as an attachment to the Harbour Master report on consents for Hamble Yacht Services, and subject to the following conditions:
(i) no dredging is involved;
(ii) the proposed new berths only to be used as working berths;
(iii) the plan be modified to overcome the navigational safety issues.
These modifications to be:
(a) the working berths restricted to extending 23 metres and not 35 metres out into the main channel as proposed on the attached sketch plans;
(b) piles G20 to G23 to be removed; and
(c) the gap between pile G27 and the downstream end of the new pontoon to be 22 metres;
(iv) Hamble Yacht Services Limited meets the cost of establishing and maintaining a solar powered navigation light on the downstream pontoon pile and also to paint the pile in high visibility red paint (initial painting on installation);
(v) Hamble Yacht Services Limited to establish and maintain two vertical fixed red navigation lights on the upstream outermost pile/pontoon and paint the pile with high visibility red paint (initial painting on installation); and
(vi) all other appropriate consents being obtained.
2. Reason
2.1 This decision supports Aims 1 to 5 of the Corporate Strategy. The management of Hamble Yacht Services Limited has requested the harbour works to overcome various operational restrictions. Hamble Yacht Services Limited, which operates from Port Hamble Marina on the western shore of the river, is one of the leading service providers to the performance yachting sector in the UK. Hamble Yacht Services Limited is an independent company, which over the last eight years has progressed with a plan to refurbish the buildings in order to make Hamble Yacht Services Limited a centre of excellence in boat repair and maintenance. Boats ranging from 34 foot to 80 foot are constructed and commissioned in the yard. Hamble Yacht Services Limited also acts as the UK agents for Swan Nauter and therefore requires permanent dedicated berthing for yachts up to 80 feet, together with suitable electricity supplies and other services to enable the yachts to be serviced efficiently.
2.2 Hamble Yacht Services Limited is an important local employer with a permanent staff of around 75 people, employing all the marine trades and fully supporting an apprentice scheme which continues to train youths in marine industry skills. Other small businesses located in and around the yard employ a further 100 people who largely rely on Hamble Yacht Services Limited to provide the customer base.
2.3 The proposed development is intended to allow the streamlining of operations at the boatyard and specifically to enable the yard to accommodate 80 foot maxi yachts, which currently experience difficulty getting alongside.
3. Other Options Considered and Rejected
3.1 Not to extend the pontoon.
4. Conflicts of Interest Declared by the Decision Maker or Other Executive Member Consulted - None.
5. Dispensation granted by the Standards Committee - Not applicable.
6. Reason(s) for the Matter being dealt with if Urgent - Not applicable.
Approved by: Date:
Councillor K B Estlin
7. Background
7.1 The developer, Hamble Yacht Services Limited, has applied to Fareham Borough Council, the Marine Consents and Environment Unit, the Department for Environment, Food and Rural Affairs and the Department for Transport for planning permission for the development and extension of the pontooning and piling at Hamble Yacht Services Limited at Hamble, Port Hamble Marina.
7.2 The River Hamble Harbour Authority has been consulted and asked to comment on matters of navigational safety by the agencies referred to above. As part of the Harbour Authority's statutory duties it has to grant consent permitting harbour works in the navigation of the River Hamble, including works to modernise, extend and relocate pontoons. This consent is in addition to the planning permission required.
7.3 Consent may be granted by the Harbour Authority permitting harbour works in the navigation of the River Hamble to accord with the Southampton Harbour Act 1924 and 1949, as amended by the River Hamble Harbour Revision Orders 1969 to 1989. Within the Harbour Authority's statutory duties lie the responsibilities to ensure that all matters concerning navigational safety are addressed. This area of responsibility includes the area known as the Main Navigation Channel and other secondary and mooring channels in that location.
7.4 The Harbour Authority held a consultation process with all stakeholders before writing the risk assessment which is attached to this report.
8. Effects of the Development Affecting Navigational Safety
8.1 The following points have been noted by the Harbour Master regarding navigational safety and are highlighted from the risk assessment attached to this report. These points were brought to the attention of the River Hamble Executive Member's Group on 26 July 2004, along with the engineering drawings of the proposed development numbered 2328-P-100.
8.2 The extension of the working berths removes the direct approach to the pontoon mooring area on the F piles used by the XOD boats. The loss of this area has been the main point of note from stakeholders who would be forced out into the path of oncoming vessels in the main channel. The area taken up by the pontoon extension is also used by boats and small tenders to gain access to the moorings area further upstream. It allows direct access to the channel running between the F and G piles. It is therefore necessary for the safety of small vessels and sailing vessels without engines to only allow the working berths to extend out to 23 metres, not 35 metres. The pile guide and pontoon will also be rounded off and fendering will be fixed to reduce damage should vessels find themselves in difficulties. The developer has investigated this modification and may make it standard throughout the modifications. The gap will give good sailing access to the F pontoon and also to the mooring channel upstream from the proposed development (marked as 1 on the chart).
8.3 The installation of the Boatscrubber pontoon on pile HP15 to HP16 on the eastern side of the river will introduce a small amount of traffic to that area. This is not thought to be significant (marked as 2 on the chart). This traffic will not alter significantly from the present visiting vessels that use the moorings. It will also reduce the amount of space taken as normally four to eight boats raft out at this location.
8.4 The main fairway will 70 metres, which is 10 metres wider than when the G piles were in place (marked as 3 on the chart).
8.5 The XODs departing and arriving back at their pontoon between F1 and F4 may have difficulties as they are not fitted with engines and rely purely on the wind for propulsion. This can be a difficult departure and approach in low winds and strong tides. An XOD may have difficulty in entering the main channel when the volume of traffic is high.
8.6 The gap between pile G27 and the proposed new pontoon should be increased to 22 metres to allow sailing vessels, XODs, to round the upstream end of the F pontoon. This can be achieved by reducing the 22 metre gap upstream of this pontoon to 15 metres (marked as 6 and 9 on the chart).
8.7 The proposed new pontoon will replace the current fore and aft moorings and will run for 24 metres. This pontoon will accommodate the displaced vessels from G20 to G24 public moorings. The replacing of the fore and aft moorings, which are double berths for vessels up to 35 feet, will halt the problems experienced during strong tides and winds. These moorings are forced out into the main channel or westwards therefore reducing the channel by F5 to F7. The replacement of these moorings will be a benefit to navigational safety and halt the reduction of the channel width of up to 10 to 12 metres during strong westerly winds (marked as 7 on the chart).
8.8 The gap between the new pontoon and the pontoon at F5 to F7, which forms the access channel, will be fixed at 17.33 metres and will no longer be affected by the movement of the fore and aft moorings (marked as 8 on the chart).
8.9 The gap between the upstream end of the proposed pontoon and the remaining G piles will be 17 metres (marked as 9 on the chart).
9. Conclusion
9.1 The proposed development places another obstacle for tenders and dinghies attempting to move into the access channel and to the moorings area upstream of Hamble Yacht Services Limited. This obstacle is no different from that of other obstacles found on the river that are negotiated safely by tenders and dinghies.
9.2 The 30 metre gap will allow the XOD fleet direct access to the F pontoon. This gap will also be sufficient for vessels to enter and depart the main channel safely.
Note: It is worth noting that the Harbour Master classes the westerly route along the outside of Port Hamble as dangerous for small tenders. Vessels departing from Port Hamble suddenly appear and proceed into the main channel at speed. Even harbour patrol launches have difficulties with inexperienced skippers suddenly appearing and charging into the main channel.
Section 100 D - Local Government Act 1972 - background papers | |
The following documents disclose facts or matters on which this report, or an important part of it, is based and has been relied upon to a material extent in the preparation of this report. | |
NB the list excludes: | |
1. |
Published works. |
2. |
Documents which disclose exempt or confidential information as defined in the Act. |
TITLE |
LOCATION |
Risk Assessment |
Hamble Harbour Office |
8869/TC
APPENDIX 5
Hampshire County Council Executive Member - Environment 9 November 2004 Hamble Yacht Services Limited: Extension to Working Berths - Statutory Duties of the Harbour Authority Report of the Director of Environment |
Item 1 |
Contact: Tony Clatworthy, ext 01489 576387
email : [email protected]
1. Summary
1.1 The following decision is sought:
That, under Section 10 of the Southampton Harbour Act 1924 and Section 48 of the Southampton Harbour Act 1949, as amended by the River Hamble Harbour Revision Orders 1969 to 1986, conditional consent be granted to Hamble Yacht Services Limited for harbour works in the navigation of the River Hamble, permitting Hamble Yacht Services Limited to modernise, extend and relocate its pontooning at Hamble Yacht Services Limited, as shown on the drawings supplied by Solent Marine Limited and displayed at the River Hamble Executive Member's Group at Warsash on 25 October 2004:
Bridge Arrangement SOL-1724-SC03-000 dated 30 September 2004;
Proposed Arrangement SOL-1724-SC02-000 dated 30 September 2004; and
Existing Arrangement SOL-1724-SC01-000 dated 30 September 2004
(the overall drawing showing all relevant moorings will be displayed at the meeting - Drawing No 2328/P/100 dated 1 November 2004)
and subject to the following conditions:
(i) no dredging to be involved;
(ii) the proposed new berths only to be used as working berths. A working berth is defined as a berth used to accommodate a vessel during building or repair;
(iii) that passage through the bridge designed for tenders be available at all states of the tide and access to this channel not to be blocked by moored vessels in the marina berths. The access route to the bridge to have a four metre channel available to allow tenders to route through the marina at all times. The bridge, to allow tenders to pass through, must not be less than three metres wide and not less than 1.5 metres high. The bridge to be lit within, to enable those using it to identify the location;
(iv) Hamble Yacht Services to meet the cost of erecting signs on the piles at the entrance to the tender channel warning of the bridge clearance available;
(v) Hamble Yacht Services Limited to meet the cost of establishing and maintaining a solar powered navigation light on the downstream pontoon pile and also to paint the pile in high visibility red paint (initial painting on installation);
(vi) Hamble Yacht Services Limited to establish and maintain two vertical fixed red navigation lights on the upstream outermost pile/pontoon and paint the pile with high visibility red paint (initial painting on installation);
(vii) at no time is Hamble Yacht Services Limited to allow double berthing to take place on the outside face of the proposed jetty head; and
(viii) all other appropriate consents being obtained.
2. Reason
2.1 This decision supports Aim 3 (Achieving economic prosperity) and Aim 4 (Building strong and safe communities) of the Corporate Strategy by supporting the marine industry based at the Hamble whilst protecting the safety of the navigation channel for all users.
2.2 The management of Hamble Yacht Services Limited has requested the harbour works to overcome various operational restrictions. The proposed development is intended to allow the streamlining of operations at the boatyard and specifically to enable the yard to better accommodate 80 foot maxi yachts, which currently experience difficulty getting alongside.
2.3 On 14 September 2004 the Executive Member for Environment made the following decision on the report submitted on behalf of Hamble Yacht Services:
"(i) That the application be refused.
(ii) That delegated authority be granted to the Director of Environment to determine any subsequent application which addressed the reason for refusal, subject to no new objections being received."
2.4 The Reason for Refusal was given as:
"The loss of the secondary channel poses an unacceptable risk to `tenders' and small craft during periods of higher tidal flow".
2.5 It is considered that the revised proposals have addressed the unacceptable risk to tenders and small craft.
3. Other Options Considered and Rejected
3.1 Not to permit the extension of the pontoon.
3.2 To approve the proposals submitted to the Executive Member for decision on 14 September 2004.
4. Conflicts of Interest Declared by the Decision Maker or Other Executive Member Consulted - None.
5. Dispensation granted by the Standards Committee - Not applicable.
6. Reason(s) for the Matter being dealt with if Urgent - Not applicable.
Approved by: Date:
Councillor K B Estlin
Hampshire County Council Executive Member - Environment 9 November 2004 Hamble Yacht Services Limited: Extension to Working Berths - Statutory Duties of the Harbour Authority Report of the Director of Environment |
Contact: Tony Clatworthy, ext 01489 576387
email : [email protected]
1. Summary
1.1 The developer, Hamble Yacht Services Limited, has applied to Eastleigh Borough Council, the Marine Consents and Environment Unit, English Nature and the Environment Agency for the necessary consents for the development and extension of the pontooning and piling at Hamble Yacht Services Limited at Hamble, Port Hamble Marina.
1.2 The River Hamble Harbour Authority has been consulted and asked to comment on matters of navigational safety by the agencies referred to above. As part of the Harbour Authority's statutory duties it has to grant consent permitting harbour works in the navigation of the River Hamble, including works to modernise, extend and relocate pontoons. This consent is in addition to the planning permission required.
1.3 This is a resubmission following modification of the original proposals. The report recommends that consent be granted, subject to a number of conditions.
2. Details
2.1 Consent may be granted by the Harbour Authority permitting harbour works in the navigation of the River Hamble to accord with the Southampton Harbour Act 1924 and 1949, as amended by the River Hamble Harbour Revision Orders 1969 to 1989. Within the Harbour Authority's statutory duties lie the responsibilities to ensure that all matters concerning navigational safety are addressed. This area of responsibility includes the area known as the Main Navigation Channel and other secondary and mooring channels in that location.
2.2 Hamble Yacht Services Limited, which operates from Port Hamble Marina on the western shore of the river, is one of the leading service providers to the performance yachting sector in the UK. Hamble Yacht Services Limited is an independent company, which over the last eight years has progressed with a plan to refurbish the buildings in order to make the company a centre of excellence in boat repair and maintenance. Boats ranging from 34 foot to 80 foot are constructed and commissioned in the yard. Hamble Yacht Services Limited also acts as the UK agents for Swan Nautor and therefore requires permanent dedicated berthing for yachts up to 80 feet, together with suitable electricity supplies and other services to enable the yachts to be serviced efficiently.
2.3 Hamble Yacht Services Limited is an important local employer with a permanent staff of around 75 people, employing all the marine trades and fully supporting an apprentice scheme which continues to train youths in marine industry skills. Other small businesses located in and around the yard employ a further 100 people who largely rely on Hamble Yacht Services Limited to provide the customer base.
2.4 The applicant's proposed development would allow the yard to continue building and servicing large ocean-going yachts and support the international and national fleet of off-shore racing yachts from the Solent and Europe. The proposed development will move the yard's working berths out into the river and displace a number of Crown Estate moorings. These moorings will be moved to a new pontoon further upstream from their present location. The new pontoon for the displaced moorings will also help remove a number of fore and aft moorings that tend to swing out into the main fairway, reducing the main channel and therefore causing a danger.
2.5 The plans were first brought to the Executive Member's Decision Day on 26 July 2004. At that meeting various concerns where identified and the Harbour Master highlighted the risk to small tenders being forced out into the main channel and meeting traffic coming head on. As the only concern was the risk to small tenders, managing that risk was investigated and the provision of a bridge to allow small tenders to navigate and transit through the area was suggested as a solution to the problem.
2.6 The applicant was asked to investigate the possibility of the inclusion of a bridge and a route for tenders through the marina into a new plan. Should the new scheme satisfy concerns highlighted in the risk assessment, the Director of Environment would be able to grant consent for the revised proposals. The Harbour Master was to facilitate this procedure. The Harbour Master presented the revised scheme to interested parties but Hamble River Sailing Club have opposed the revised plans on several grounds, as set out in paragraph 3.8. The Harbour Master then brought the revised plan before the River Hamble Executive Member's Group for consideration on 25 October. At that meeting all Members were in agreement that a bridge for tenders, useable at all states of the tide, incorporated into the marina plans would overcome the safety issues for tenders highlighted in previous risk assessments.
3. Effects of the Development on Navigational Safety
3.1 The following points have been noted by the Harbour Master regarding navigational safety and are highlighted from the Risk Assessment attached to this report. These points were brought to the attention of the River Hamble Executive Member's Group on 26 July 2004, along with the engineering drawings of the proposed development numbered 2328-P-100 and again on 25 October with the following drawings: Bridge Arrangement SOL-1724-SC03-000 dated 30 September 2004; Proposed Arrangement SOL-1724-SC02-000 dated 30 September 2004; and Existing Arrangement SOL-1724-SC01-000 dated 30 September 2004.
3.2 The Harbour Authority held a consultation process with all stakeholders before producing the original risk assessment. The original development proposal indicated a number of concerns that could not be managed safely, therefore the Harbour Master proposed a reduced development and produced a risk assessment for those proposals at the Executive Member for Environment meeting on 26 July 2004. The risk assessment attached to this report covers the new revised plans from the developer and indicates that all identified risks can be managed safely.
3.3 The installation of the Boatscrubber pontoon on pile HP15 to HP16 on the eastern side of the river will introduce a small amount of traffic to that area. This is not thought to be significant. This traffic will not alter significantly from the present visiting vessels that use the moorings. It will also reduce the amount of space that was taken up by four to five boats that rafted out at this location (visitors' piles).
3.4 The main fairway will be 70 metres wide at its upstream end, which is 10 metres wider than when the G piles were in place. The downstream end of the proposed pontooning will be over the location of the displaced G Piles, making the main channel 60 metres wide at that point.
3.5 The XODs departing and arriving back at their pontoon between F1 and F4 may have difficulties as they are not fitted with engines and rely purely on the wind for propulsion. This can be a difficult departure and approach in low winds and strong tides. The proposed entry and exit gap will now allow the XODs direct access to their mooring pontoon. The proposed layout will therefore benefit the XODs.
3.6 The proposed new pontoon will replace the current fore and aft moorings and will run for 24 metres. This pontoon will accommodate the displaced vessels from G20 to G25 public moorings. The replacing of the fore and aft moorings, which are double berths for vessels up to 35 feet, will halt the problems experienced during strong tides and winds. These moorings are forced out into the main channel in a westerly wind and into the mooring/access channel in a easterly wind. The replacement of these moorings will be a benefit to navigational safety and halt the reduction of the main channel width of up to 10 to 12 metres during westerly winds.
3.7 The gap between the new pontoon and the pontoon at F5 to F7, which forms the access channel, will be fixed at 17.33 metres and will no longer be affected by the movement of the fore and aft moorings.
3.8 The main objections in allowing the proposed scheme to proceed with a bridge provided for tenders are as follows:
OBJECTION |
PROPOSED OFFICER RESPONSE |
(i) The aperture of the bridge is very narrow and will not allow two small dinghies to pass. |
The lateral depth of the bridge will be less than three metres and therefore a passing situation will not arise. |
(ii) An oarsman with 8.1 (sic) metre oars would have difficulty in passing through a three metre gap. |
One pull and then ship oars will allow the tender under oars to glide through the bridge. |
(iii) Mooring pontoons and vessels would obstruct passage of tenders. |
The channel will be kept clear at all times and will be policed by the Harbour Authority. The yard has also confirmed that the channel will remain free at all times to allow tenders to proceed. |
(iv) The clearance under the bridge will not allow a tender to pass through without the helm bending double. |
The seat height of a tender is unlikely to be more than 0.5 metres above the water and a man sitting would be approximately one metre high. The proposed bridge gives 1.5 metres clearance, which is sufficient. |
(v) The design height makes no allowance for action in an emergency. |
The proposed bridge is less than three metres in lateral depth and a tender would complete passage through such a bridge very quickly. The bridge is in a working marina and if difficulties arose it would have the option to come alongside or call for assistance. |
(vi) The bridge will not allow sailing dinghies to pass through. |
Correct. They would use the main channel or the secondary channel on the eastern shore as they currently do. |
(vii) The bridge, because of the clearance, would not allow the passage of small craft to transit through the bridge. |
The bridge is designed for tenders and other small craft such as canoes should they whish to use the facility. Other small craft such as RIBs would use the main channel as they always have done in the past. |
OBJECTION |
PROPOSED OFFICER RESPONSE |
(viii) The closure of the access route because of the proposed development, with a bridge that may obstruct or, by design of insufficient clearance, risks trapping dinghies and small craft that have proceeded to the bridge through the channel. In effect the bridge creates a blind channel without an escape route. |
A sign giving warning of the clearance will be displayed at the entrance to the channel. Should tenders get into difficulties they may come alongside in the marina or call for assistance. |
(ix) The proposed development obstructs a secondary channel. |
It is worth noting that the Harbour Master classes the westerly route along the outside of Port Hamble as dangerous for small tenders. Vessels departing from Port Hamble suddenly appear and proceed into the main channel at speed. Even harbour patrol launches have difficulties with inexperienced skippers suddenly appearing, charging into the main channel. Vessels waiting or approaching the fuel berth are also a danger to small vessels with a low freeboard. The Harbour Master recommends using the eastern side of the river for passage of small tenders. |
Recommendation
That, under Section 10 of the Southampton Harbour Act 1924 and Section 48 of the Southampton Harbour Act 1949, as amended by the River Hamble Harbour Revision Orders 1969 to 1986, conditional consent be granted to Hamble Yacht Services Limited for harbour works in the navigation of the River Hamble, permitting Hamble Yacht Services Limited to modernise, extend and relocate its pontooning at Hamble Yacht Services Limited, as shown on the drawings supplied by Solent Marine Limited and displayed at the River Hamble Executive Member's Group at Warsash on 25 October 2004:
Bridge Arrangement SOL-1724-SC03-000 dated 30 September 2004;
Proposed Arrangement SOL-1724-SC02-000 dated 30 September 2004; and
Existing Arrangement SOL-1724-SC01-000 dated 30 September 2004
(the overall drawing showing all relevant moorings will be displayed at the meeting - Drawing No 2328/P/100 dated 1 November 2004)
and subject to the following conditions:
(i) no dredging to be involved;
(ii) the proposed new berths only to be used as working berths. A working berth is defined as a berth used to accommodate a vessel during building or repair;
(iii) that passage through the bridge designed for tenders be available at all states of the tide and access to this channel not to be blocked by moored vessels in the marina berths. The access route to the bridge to have a four metre channel available to allow tenders to route through the marina at all times. The bridge, to allow tenders to pass through, must not be less than three metres wide and not less than 1.5 metres high. The bridge to be lit within, to enable those using it to identify the location;
(iv) Hamble Yacht Services to meet the cost of erecting signs on the piles at the entrance to the tender channel warning of the bridge clearance available;
(v) Hamble Yacht Services Limited to meet the cost of establishing and maintaining a solar powered navigation light on the downstream pontoon pile and also to paint the pile in high visibility red paint (initial painting on installation);
(vi) Hamble Yacht Services Limited to establish and maintain two vertical fixed red navigation lights on the upstream outermost pile/pontoon and paint the pile with high visibility red paint (initial painting on installation);
(vii) at no time is Hamble Yacht Services Limited to allow double berthing to take place on the outside face of the proposed jetty head; and
(viii) all other appropriate consents being obtained.
Section 100 D - Local Government Act 1972 - background papers | |
The following documents disclose facts or matters on which this report, or an important part of it, is based and has been relied upon to a material extent in the preparation of this report. | |
NB the list excludes: | |
1. |
Published works. |
2. |
Documents which disclose exempt or confidential information as defined in the Act. |
TITLE |
LOCATION |
Risk Assessment Report to the River Hamble Executive Member's Group on 26 July 2004 Report to Executive Member for Environment on 14 September 2004 Report to River Hamble Executive Member's Group on 25 October 2004 |
Hamble Harbour Office Room 418, Ashburton Court West Hantsweb Room 418, Ashburton Court West Room 418, Ashburton Court West |
9071/TC