Hampshire County Council Eastleigh Highway and Transport Advisory Panel 11 March 2005 Eastleigh Traffic Management Report of the Head of Engineering, Eastleigh Borough Council |
Item 7 |
Contact: Stuart Robinson-Woledge, tel 02380 688229
email: [email protected]
1. Summary
1.1 This report brings Members up-to-date on progress made and new issues arising since the last report to this Panel in October 2004.
2. On-Street Parking Management
2.1 The Borough Council commenced on-street decriminalised parking enforcement as from 1 October 2004. To ensure that motorists were fully aware of the increased level of enforcement, two weeks prior to this date parking attendants issued warning notices to over 600 vehicles.
2.2 The Borough Council now employs 15 parking attendants who undertake enforcement to all areas of the Borough. Between 1 October 2004 and 31 January 2005 there were 4,221 parking charge notices issued out of which 2,391 have been paid.
2.3 There have been significant road safety benefits since the new levels of enforcement started, particularly around schools, where drivers continually parked on double yellow lines. Also in industrial estates, disabled bays and the town centre residential areas.
3. New Restricted Parking Zones
3.1 The Restricted Parking Zone in the former Causton Site is now successfully in operation.
3.2 Progress on the proposed Restricted Parking Zone in the former Pirelli site has been slow. In order to progress the Traffic Regulation Order (TRO), plans showing the highways to be adopted are required as well as the permission of the land owner(s) to the TRO. Neither have, so far, been forthcoming and until such time as they are the roads remain unadopted and no further progress can be made.
4. New Controlled Parking Zones
4.1 Following changes to committee recommendations, the three proposed new zones in residential areas surrounding the former Pirelli site have been reviewed. It is now proposed to introduce a new zone in Brookwood Avenue only and to combine the roads either side of Derby Road, formerly two zones, into one larger zone. Further consultation has been postponed pending a decision by Eastleigh Borough Council to introduce charging for residents' parking permits.
5. On-Street Parking Problems Associated with Schools and Colleges along Chestnut Avenue
5.1 Consultants are currently being commissioned to investigate and survey the current parking situation around this area and report on possible improvements.
6. Traffic Management Agency Agreement
6.1 In December 2004 Eastleigh Borough Council signed a new agreement with the County Council for traffic management work. In most respects the responsibilities conferred are the same, allowing Eastleigh to continue to manage traffic and parking issues in the Borough.
7. Rose Bowl - West End
7.1 Following previous major events at the Rose Bowl stadium, the Local Area Committee in consultation with Hampshire Constabulary has requested area-wide parking restrictions to assist safety, traffic flow and residential access throughout West End. Statutory consultation on a proposed TRO for the parking restrictions is currently underway.
8. Verge Parking
8.1 An initiative to prevent damaging and unsightly verge parking is underway. Nominations from all Local Area Committees of the most affected roads in their areas have resulted where appropriate in the progression of a TRO prohibiting this practice.
9. School Zig-Zag Markings
9.1 Funded through the Safer Routes to School Programme, all parking prohibitions outside schools in the Borough will soon be covered by a TRO. This is currently awaiting public advertisement and will allow enforcement by the Borough parking attendants and greater safety for children and parents.
10. Traffic Studies and Traffic Regulation Orders Work Programme
10.1 The current list of Traffic Studies and TROs and their status is attached as an appendix. Although much of the work has been delayed due to staff shortages and work generated through new developments in the Borough, significant progress has more recently been possible through overtime arrangements, some temporary assistance and the commitment and effort of staff.
Recommendation
That this report be noted.
Section 100 D - Local Government Act 1972 - background papers | |
The following documents disclose facts or matters on which this report, or an important part of it, is based and has been relied upon to a material extent in the preparation of this report. | |
NB the list excludes: | |
1. |
Published works. |
2. |
Documents which disclose exempt or confidential information as defined in the Act. |
TITLE |
LOCATION |
None. |
9201/SR-W
TRAFFIC SECTION WORKPLAN APPENDIX
JANUARY 2005
BISHOPSTOKE, FAIR OAK AND HORTON HEATH AREA | |||||
Traffic Regulation Orders | |||||
Location |
Issue |
Comments |
Target |
Funding |
Staff |
All schools within area |
Zig-Zag Keep Clear Markings |
TRO to cover zig-zag markings outside all schools in the Borough. |
Spring `05 |
Hampshire County Council (HCC) (Safer Routes to School - SRTS) |
JM |
Stoke Park Road, Fair Oak Road, Hamilton Road, Old Fair Oak Road, Underwood Road, Witt Road |
Verge Parking Restrictions |
Borough-wide TRO. Public consultation ends 30/12/04. |
Autumn `04 |
Agency Programme. Signs/lines funded by Local Area Committee (LAC) |
PG |
Dumpers Drove |
Waiting Restrictions |
To protect Aintree Close junction. Added from traffic management issues. |
|||
Traffic Studies | |||||
Mortimers Lane, Fair Oak |
Speed Limit Review |
Remaining recommendation on hold pending outcome of Construction Team's cycle route feasibility (GB). |
Autumn `04 |
LAC |
PG |
Botley Road: Eastleigh Road to Denhams Corner (1) |
Traffic Study |
Not started (next study to be commenced). |
LAC |
JM | |
Fair Oak Road: Riverside to Eastleigh Road, excluding Alan Drayton Way (2) |
Traffic Study |
Not started. |
LAC |
||
Allington Lane (3) |
Traffic Study |
Not started. |
LAC |
||
Winchester Road, Fair Oak (4) |
Accident Numbers |
Reserve study. Not started. |
LAC |
||
BURSLEDON, HAMBLE AND HOUND AREA | |||||
Traffic Regulation Orders | |||||
Location |
Issue |
Comments |
Target |
Funding |
Staff |
All schools within area |
Zig-Zag Keep Clear Markings |
TRO to cover zig-zag markings outside all schools in the Borough. |
Spring `04 |
HCC (SRTS) |
JM |
Coach Road, Hamble |
One Way |
Statutory consultation complete. Awaiting further information from HCC about impact of cycle route. |
Summer `05 |
Agency Programme |
JM |
BURSLEDON, HAMBLE AND HOUND AREA Traffic Regulation Orders (continued) | |||||
Location |
Issue |
Comments |
Target |
Funding |
Staff |
Coach Road, Hamble |
Waiting Restrictions |
Questions re lining. To go to BHH Team Meeting 12/04. |
Spring `05 |
Developer Funded |
JM |
Kinsbourne Way and Queens View |
Verge Parking Restrictions |
Borough-wide TRO. Public consultation ends 30/12/04. |
Autumn `04 |
Agency Programme Signs/lines funded by LAC |
PG |
Long Lane, Bursledon |
Waiting Restrictions |
Statutory consultation ends 17/12/04. |
Spring `05 |
HCC (SRTS) |
JM |
Reeves Way, Lowford |
20mph Zone |
Waiting for approval by HCC. |
Summer `05 |
Agency Programme |
JM |
Victoria Road, Netley |
Amendment to Waiting Restrictions |
Amendments due to construction of build-outs at York Road and Manchester Road. consulting soon. |
Capital Works |
||
Satchell Lane, Hamble |
Waiting Restrictions |
Extend yellow lines to protect driveway of 11a (13) and those on blind corner. Added from traffic management issues. |
|||
Traffic Studies | |||||
Bursledon Village |
Speed Limit Review |
Analysing results of speed surveys. |
Winter `04/05 |
LAC |
PG |
Review of studies already undertaken (1) |
Review |
Under way. Includes following studies: Portsmouth Road (2000), Ingleside (2001), Satchell Lane (2001), Hound Road (2001), Woolston Road (2001), Station Rd/Victoria Rd (2002), Hamble Lane (2003). |
Spring `05 |
LAC |
JM |
New Road, Netley |
Speed Survey |
Not started. |
LAC |
PG/ SRW | |
Grange Road: Victoria Road to Portsmouth Road (2) |
Traffic Study |
Not started. |
LAC |
||
Lionheart Way (3) |
Traffic Study |
Not started. |
LAC |
||
Westfield Common |
Parking Surveys |
For verge parking problems. Not started. |
Spring `05 |
LAC |
PG |
CHANDLERS FORD AND HILTINGBURY AREA | |||||
Traffic Regulation Orders | |||||
Location |
Issue |
Comments |
Target |
Funding |
Staff |
All schools within area |
Zig-Zag Keep Clear Markings |
TRO to cover zig-zag markings outside all schools in the Borough. |
Spring `04 |
HCC (SRTS) |
JM |
Bodycoats Road, Brownhill Road, Kings Road, Mead Road, Merdon Avenue |
Verge Parking Restrictions |
Borough-wide TRO. Public consultation ends 30/12/04. |
Autumn `04 |
Agency Programme. Signs/lines funded by LAC |
PG |
Brownhill Road |
Waiting Restrictions |
Progressed with Nichol Road restrictions. To be implemented 28/01/05. |
Autumn `04 |
HCC (SRTS) |
PG |
Keble Road/Shaftesbury Avenue/ Chalvington Road |
Waiting Restrictions |
TRO implemented. Problems with access. Awaiting quote from Highways. |
Possible LAC funding for dropped kerbs |
JM | |
Nichol Road Shops |
Waiting Restrictions |
To be implemented 28/01/05. |
Autumn `04 |
HCC |
PG/ KB |
Station Lane |
Waiting Restrictions |
Informal consultation with residents ends mid-January. |
Spring `05 |
HCC and Agency Programme |
PG |
Traffic Studies | |||||
North Millers Dale(1) |
Traffic Study |
Under way. |
Spring `05 |
LAC |
PG |
Bournemouth Road (2) |
Traffic Study |
Not started. |
LAC |
||
School Lane (3) |
Traffic Study |
Not started. |
LAC |
||
Leigh Road: Bournemouth Road to M3 sliproad (4) |
Traffic Study |
Not started. |
Traffic and Road Safety budget |
||
Ashdown Road (5) |
Traffic Study |
Not started. Reserve study. |
LAC |
||
Chandler's Ford Station |
Parking Survey |
Not started. |
HCC |
||
Winchester Road |
`After' Speed Survey |
Completed. |
Agency Programme |
||
Winchester Road, Shell garage |
Pedestrian movements |
Deferred until re-development started. |
LAC |
||
EASTLEIGH LOCAL AREA COMMITTEE AREA | |||||
Traffic Regulation Orders | |||||
Location |
Issue |
Comments |
Target |
Funding |
Staff |
All schools within area |
Zig-Zag Keep Clear Markings |
TRO to cover zig-zag markings outside all schools in the Borough. |
Spring `04 |
HCC (SRTS) |
JM |
Eastleigh College |
Waiting Restrictions |
Completed. |
Autumn `04 |
Developer funded |
MG |
Factory Road environmental improvements |
Waiting Restrictions |
Public consultation to begin January/February. |
Summer `05 |
Capital Works |
PG |
Falcon Square, Falkland Road, Lawn Road, St Johns Road, Nightingale Avenue |
Verge Parking Restrictions |
Borough-wide TRO. Public consultation ends 30/12/04. |
Autumn `04 |
Agency Programme. Signs/lines funded by LAC |
PG |
Leigh Road: Bournemouth Road to M3 sliproad) |
Waiting Restrictions |
Public consultation ends 07/01/05. |
Winter `04/05 |
Agency Programme |
PG |
Leigh Road environmental improvements |
Waiting Restrictions |
Drafting TRO. Statutory consultation to start in January. |
Capital Works |
PG/ DL | |
Nightingale Avenue |
Waiting Restrictions |
Await confirmation from HCC whether restrictions required. |
HCC |
||
Residents Parking Zones |
3 new controlled zones and 1 restricted zone |
Brookwood Avenue: consultation for changes end 23/12/04. Chadwick Road and Cherbourg Road: consultant making changes to Derby Road - will need re-advertising. Implementation on hold pending decision about charging for permits. Causton site: completed. |
Spring `05 |
Developer funded |
PG/ KB/ SRW |
Pirelli site |
Restricted Zone |
Delayed due to developer not providing adoption plans to HCC. |
Spring `05 |
Developer funded |
PG/ SRW |
The Gardens |
Waiting Restrictions |
Complications. LAC to reconsider issue of permits. |
LAC 25/01/05 |
Developer funded |
PG |
Romsey Close |
Waiting Restrictions |
Issue arisen as a result of changes to CPZs. To be included in Leigh Road environmental improvements TRO. |
Agency Programme or Pirelli developer contributions |
PG | |
EASTLEIGH LOCAL AREA COMMITTEE AREA Traffic Regulation Orders (continued) | |||||
Location |
Issue |
Comments |
Target |
Funding |
Staff |
Falkland Road |
Waiting Restrictions |
Between the two roundabouts. To be included with Leigh Road TRO. Added from traffic management issues. |
Agency Programme |
PG | |
Upper Market Street |
Loading Bays |
Analysing results of video survey. Added from traffic management issues. |
Agency Programme |
PG/ SRW | |
Doncaster Road |
Waiting Restrictions |
Extend permit parking bay to outside No. 64. Added from traffic management issues. |
|||
Allbrook Hill |
Waiting Restrictions |
Outside the Hall and Pitmore Road jct. Added from traffic management issues. |
|||
Cranbury Road |
Waiting Restrictions |
To protect backway entrances. Added from traffic management issues. |
|||
Derby Road |
Waiting Restrictions |
To improve Market Street jct visibility. Added from traffic management issues. |
|||
Doncaster Road |
Waiting Restrictions |
Extend parking bay by 1 car length. Added from traffic management issues. |
|||
Twyford Road |
Waiting Restrictions |
Opposite St Catherines Road jct. Added from traffic management issues. |
PG | ||
Traffic Studies | |||||
Westfield Road |
Traffic Study |
Just started. |
Mid `05 |
LAC |
JM |
Stoneham Lane |
`After' speed survey |
Completed. |
MG | ||
Monks Way and area around colleges |
College parking |
Revised brief sent to consultants - awaiting estimates |
LAC (developer contributions) |
PG/ SRW | |
Nightingale Avenue area |
Verge Parking Study |
Not started. |
LAC |
||
Woodside Avenue (1) |
Traffic Study |
Not started. |
LAC |
||
Chestnut Avenue (2) |
Traffic Study |
Not started. |
LAC |
||
Passfield Avenue (3) |
Traffic Study |
Not started. HCC Safety Engineering carried out improvements Dec '04. |
LAC |
||
St Catherines Road (4) |
Traffic Study |
Not started. |
LAC |
||
Bishopstoke Road: Southampton Road to Chickenhall Lane (5) |
Traffic Study |
Not started. |
LAC |
||
HEDGE END, WEST END AND BOTLEY AREA | |||||
Traffic Regulation Orders | |||||
Location |
Issue |
Comments |
Target |
Funding |
Staff |
All schools within area |
Zig-Zag Keep Clear Markings |
TRO to cover zig-zag markings outside all schools in the Borough. |
Spring `05 |
HCC (SRTS) |
JM |
Allen Road, Bedford Close, Marls Road, Precosa Road, Tickner Close |
Verge Parking Restrictions |
Borough-wide TRO. Public consultation ends 30/12/04. |
Autumn `04 |
Agency Programme. Signs/lines funded by LAC |
PG |
Moorgreen Road |
Extension of 30mph speed limit |
Checking to see if HCC has implemented the TRO. |
Winter `04/05 |
HCC |
JM |
Stroudley Way |
One Way and Waiting Restrictions |
TRO implemented. Erect notices nearer time works to be completed. |
Autumn `04 |
HCC |
PG |
Townhill Way |
Weight Restriction |
Completed. |
PG | ||
Wildern Lane |
Waiting Restrictions |
Await further instructions from Construction Team. |
HCC (SRTS) |
||
Traffic Studies | |||||
Winchester Road/Boorley Green |
Traffic study |
Following up recommendations. |
LAC |
JM | |
Grange Road |
`After' traffic study |
Review of traffic speed following improvements. JM to check for distribution. |
LAC |
JM | |
Area surrounding Freegrounds Schools: Hobb Lane, Sovereign Drive, Bedford Close (1) |
Traffic study |
Construction Team to do feasibility work therefore no need for separate traffic study. To be removed from list. |
|||
Allington Lane: HEWEB section (2) |
Traffic study |
Not started. |
LAC |
||
Burnetts Lane |
Traffic count |
LAC allocated funding. JM to arrange in new year. |
LAC |
JM | |
Broad Oak |
Speed survey |
Following improvements from HCC Safety Engineering. |
LAC |
JM | |
OTHER AGENCY WORK AND COMMITMENTS | |||||
Location |
Issue |
Comments |
Target |
Funding |
Staff |
Public/Councillor enquiries |
Ongoing |
Agency Programme |
ALL | ||
OTHER AGENCY WORK AND COMMITMENTS (continued) | |||||
Location |
Issue |
Comments |
Target |
Funding |
Staff |
Disabled bays |
New applications & assessments |
Ongoing |
Agency Programme |
JM/ PG | |
Disabled bays |
Annual Review |
Under way |
Spring `05 |
Agency Programme |
PG |
Signing/lining |
Implementation |
Ongoing |
Agency Programme |
KB | |
Applications to the Traffic Commissioner |
Monitoring new applications |
Ongoing |
Agency Programme and LACs |
PG | |
Quality Bus Partnership (QBP) |
Poles, flags, new shelters, hard standings |
Construction Team making start on work and KB to then take over? |
2004/05 |
Agency Programme |
KB/ KD/ DW |
Street Name Plates |
Implementation and maintenance |
All funds have been committed, works ongoing. |
Ongoing |
Borough |
KB |
Bus shelters |
Maintenance |
Visual cable inspections: SRW to follow-up with DP. |
Ongoing |
Borough/QBP |
KB/ SRW |
Rechargeable works |
inc. tourist and developer signs |
Ongoing |
Rechargeable |
KB | |
Eastleigh Bus Station |
Cleaning of slabs |
Order to be issued. |
Borough |
SRW | |
Sign design |
Design of signs for HCC as and when required |
Consider charging HCC. |
Ongoing |
Agency Programme |
KB |
Road Safety Council |
Most recent meeting was in November. |
Ongoing |
Borough |
JM | |
GIS Working Group |
Ongoing |
Borough |
PG | ||