1. Summary

1.1 This report reviews the traffic management programme for 2004/05 undertaken by Fareham Borough Council.

2. Introduction

2.1 Traffic Regulation Order (TRO) and Traffic Investigation Programmes are approved by the Fareham Borough Council Executive after consultation with County Council officers. The programmes for 2004/05 were approved in January 2004.

2.2 Appendices 1 and 2 attached show the approved programmes and progress to date. In addition to the sites for TRO's shown in Appendix 1, the Executive approved an updated rolling programme for `No Parking on Grass Verges.'

3. Traffic Regulation Orders

3.1 The funding allocation for 2004/05 is £13,000 for routine TRO's. From this, the cost of signs for Phase V of the `No Parking on Grass Verges Order' was £8,500 and the cost of the Notice to bring the Order into force was just over £400. This has allowed six TRO's to be implemented from the programme approved by the Executive; one Order was advertised but not progressed due to public objections and Phase V of the `No Parking on Grass Verges' programme has been brought into force. Two sites shown in Appendix 1 were funded by developers. The final Orders implemented after investigations match the annual allocation of funds for the 2004/05 financial year. This year the County Council has been unable to offer a top up of funding. Consequently, sites shown on the 2004/05 programme which have not yet been investigated must now be carried over to 2005/06.

3.2 Sites for inclusion in the 2005/06 programmes will be considered by the Executive in March. For the first time, the 2005/06 TRO programme will be funded from the capital programme. Overall funding levels will continue to support an extensive county- wide programme of schemes with scope for top-up funding on a priority basis to individual Traffic Management Agencies over and above the annual allocation.

3.3 An additional Traffic Regulation Order has been investigated during 2004/05 as a result of investigations carried out by the Casualty Reduction Partnership. This Order, a change to the speed limit on a section of West Street, Portchester, will be brought into force in 2005/06.

3.4 Temporary road closures and diversions for road works, including works carried out by the public utility companies, are now processed by the Borough Council. The temporary closures are processed on request and include closures requiring an Order, those that can be dealt with by site notices and emergency closures.

4. Traffic Investigations

4.1 The Market Quay Development is almost complete and the first units now open to the public. It is anticipated that the development will be fully open by Easter 2005. Involvement in the completion and handing over of the car park, cycleway, footway and taxi rank has resulted in minor delays to the traffic investigations programme.

4.2 Funding is released by the County Council for specific schemes through the Hampshire Local Transport Plan (LTP) and from developer contributions. District Councils have been asked to continue providing assistance to deliver schemes from the LTP programme. These schemes have therefore been included in Fareham's programme in addition to the normal programme of traffic investigations.

4.3 The 2004/05 traffic investigation programme includes ongoing schemes from 2003/04 and is set out in Appendix 2.

Recommendation

That this report be noted.

Section 100 D - Local Government Act 1972 - background papers

 

The following documents disclose facts or matters on which this report, or an important part of it, is based and has been relied upon to a material extent in the preparation of this report.

 

NB the list excludes:

 

1.

Published works.

 

2.

Documents which disclose exempt or confidential information as defined in the Act.

TITLE

LOCATION

None.

 

9209/AV

APPENDIX 1

LIST OF TRAFFIC REGULATION ORDERS 2004/05

SUGGESTED PRIORITY

SITE

DESCRIPTION & JUSTIFICATION

 

1

Stubbington Village Centre

Member request for additional disabled parking bays

Implemented January 2005

2

West Street

Fareham North

Request from Southern Focus Trust, 235 West Street for a disabled bay to be provided at Maytree Road.

Advertised but not brought into force due to lack of funds

3

Castle Street

Portchester East

Member request for waiting restrictions at junction with White Hart Lane

Justification: Accident, pedestrian/cyclist safety, obstruction to visibility

Implemented August 2004

4

Highlands Road/ Oak Road

Fareham West

Member request for waiting restrictions at junction

Justification: Accidents, obstruction to visibility

Implemented August 2004

5

Locks Road/ Heath Road

Locks Heath

Member request to investigate on-street parking at junction

Justification: Accidents, pedestrian/cycle safety, obstruction to visibility

Implemented August 2004

6

Harlequin Grove

Fareham West

Request by member of public for waiting restrictions

Justification: Accidents, pedestrian/cyclist safety, obstruction to visibility

Implemented August 2004

7

Chapel Road

Sarisbury

Member request to investigate on-street parking by Church Hall

Justification: Pedestrian safety, obstruction to visibility, access to emergency vehicles, congestion

Advertised but not implemented due to high level of objections from local residents.

8

Cams Hill and Wallington Shore Road

Portchester West

Fareham East

Requests by Police for limited waiting in Cams Hill and by Village Trust to investigate on-street parking in Wallington Shore Road

Justification: Obstruction to visibility, access to emergency vehicles

Transferred to 2005 / 06 programme due to lack of funds

9

Highlands Road

Fareham North West

Member request for waiting restrictions in vicinity of Somerfield store

Justification: Cycle safety, obstruction to visibility

Implemented August 2004

10

Funtley Road/ The Waters

Fareham North

Request from public for waiting restrictions

Justification: Obstruction to visibility

Request to review speed limit by Roebuck Avenue

No action to date due to lack of funds

11

Foy Gardens

Warsash

Request by member of public for waiting restrictions at junction

Justification: Restricted access into Garden Mews (opposite)

No action to date due to lack of funds

12

Allotment Road

Sarisbury

Request from member of public for waiting restrictions by park entrance

Justification: Pedestrian safety

No action to date due to lack of funds

13*

Hook Park Road

Warsash

Member request for 30 mph speed limit

No action to date due to lack of funds

14

Bishopsfield Road (Southern end)

Fareham South

Request by members of public for waiting restrictions at southern end

Justification: traffic congestion

No action to date due to lack of funds

15

Belvoir Close/

Elmhurst Road

Fareham South

Request from member of public to review waiting restrictions

Justification: Congestion

No action to date due to lack of funds

16

Newtown

Portchester East

Request from member of public for waiting restrictions on bend due to commuter parking

Justification: visibility on bend

No action to date due to lack of funds

17*

Hunts Pond Rd

Locks Heath

Member request for weight limit

No action to date due to lack of funds

18

Common Lane

Titchfield

30 mph speed limit.

Transferred to 2005/06 programme due to lack of funds

       

* County interest or reserved matter

 

Barnes/ Sherwood Gardens, Sarisbury

Waiting restrictions carried over from 2003/04 programme. Linked to School Travel Plan Developer Funded

Implemented September 2004

 

Upper Cornaway Lane, Portchester West

Private funding.

Waiting restrictions at northern end to overcome problems of obstruction.

Implemented August 2004

APPENDIX 2

PROGRAMME OF SCHEMES AND TRAFFIC INVESTIGATIONS 2003/04

(COMPLETED AND PROGRESSING)

 

SCHEME TITLE

JUSTIFICATION

DETAILS

PROGRESS

 

1

Hill Road and Station Road, Portchester - Traffic calming and priority working under railway bridge

The former Highways and Transportation Sub-Committee instructed the initiation of a scheme. Developer funded.

Design and supervision of traffic calming scheme including priority working beneath bridge - subject to trial.

Traffic calming measures implemented. Priority working beneath Station Road railway bridge introduced as a trial July 2003. Monitoring completed April 2004Funding allocated for signalising priority working beneath bridge

2

Newgate Lane/Tukes Avenue Cycleway

LTP Capital Programme 2002/03.

Project management, design and construction of cycleway scheme.

Scheme completed with the exception of minor additional works requested by Gosport BC

3

Park Lane, Fareham

Traffic calming

(including Westbury Road Cycleway)

As above.

Design and supervision of traffic calming scheme.

Design completed. Awaiting outcome of detailed safety audit and project appraisal

4

Town Centre direction signing

As above.

Design and supervision of comprehensive signing scheme for Fareham Town Centre.

Completed. Final account paid January 2005

5

Fareham Town Centre Pedestrian Signing

Funding available in association with the Market Quay Development

Design and implementation of signing scheme in conjunction with Town Centre Working Group.

Design completed. Contract due to commence January 2005

6

Highlands Road near Hilson Drive (Fareham West)

Pedestrian crossing facility

Petition for pelican crossing.

Referred by Borough Council Planning and Transportation Committee.

12 hour vehicle and pedestrian count undertaken July 2003.

Results submitted to County Council for inclusion into Pedestrian Facility Programme.

7

Parking in Titchfield Village Centre

Request by Titchfield Village Trust following their own investigations.

Study of on- and off-street parking in conjunction with Members and Titchfield Village Trust. Public consultation programmed for March 2004.

Study and public consultation completed. Measures to be implemented in 2005 / 06 financial year

8

Salterns Lane Traffic Calming

Developer Funded.

Alternative to speed cushions which were removed due to maintenance difficulties.

Design and implementation of traffic calming scheme. Preliminary design progressing.

Design and public consultation completed. Detailed safety audit completed. Awaiting project appraisal.

9

East Street / High Street

Fareham

Request by school for pedestrian crossing (Executive 24/03/03)

12 hour count required

Undertaken 25.05.04 (High St) and 13.07.04 (East St). Funding requested for crossing at High Street. Inception meeting held and land surveys now being undertaken to establish site for crossing

10

Southampton Road/

Park Lane, Fareham

Member request for pedestrian crossing

12 hour count required

Undertaken 12.07.04. Criteria not met

11

Salterns Road

Hill Head

Problems with vehicle speeds and `rat-running'

Safe crossing point for sports field needed

Traffic investigation

Investigation commenced January 2005

12

Portchester

(north of A27)

Problems with vehicle speeds and `rat-running'

Traffic investigation

 

13

Highlands Road/

Fareham Park Road/Gudge Heath Lane junction

Pedestrian access around the junction

Review the need for crossing/signal facility

Review completed 01.09.04. Pedestrian and vehicle counts undertaken November 2004

14

Hartlands Road/West Street Fareham

Provision of pedestrian crossing

Design and implementation

Design being finalised taking into account Safety Audit report.

15

Advance Direction Signs on a route priority basis from the town centre

New advance directions signs on a specific route from the town centre

Sign design and bid for funding