|
|
|
|
|
|
1 |
Summary |
| |
|
1.1 |
The DfES announced for the fifth consecutive year a further allocation of New Deal for Schools (NDS) Modernisation funding for 2005/06. The allocation is just over £21 million. The overall Modernisation allocation is split between suitability (improvement) work managed by the Executive Member for Education and funding to address the backlog of building condition work, which is managed by the Executive Member for Policy and Resources. |
1.2 |
A split of these resources for 2005/06 (see table below) is in the ratio of 54% to condition and 46% suitability. The Modernisation allocation for 2005/06 includes a specific sum earmarked by DfES to safeguard investment in Primary School buildings. |
| |
NDS Modernisation Allocation 2005/06 |
NDS Suitability £'m |
NDS Condition £'m |
NDS Total £'m |
| |
Basic Allocation |
5.526 |
6.487 |
12.013 |
| |
Additional Primary Allocation |
4.135 |
4.854 |
8.989 |
| |
Total Allocation |
9.661 |
11.341 |
21.002 |
| |
|
1.3 |
This report seeks approval to the allocation of NDS Condition funding for 2005/6. |
| |
|
2 |
NDS Condition Project Selection And Programme For 2005/06 |
| |
|
2.1 |
A strategic approach has been taken to select major capital repairs that will have the greatest impact at schools and reduce future maintenance cycles. Specific priority areas, include repair and replacement of: · life expired SCOLA Mark 1 cladding systems · life expired roof, window and other cladding systems · obsolete heating, electrical and fire alarm systems · structural defects to buildings · external redecoration and associated repairs · external paving, fencing and drainage systems.
|
2.2 |
Appendix 1 details the 2005/06 NDS "Condition" allocation for schools based on the above priorities. Work is planned at 90 Schools, maintaining the momentum of previous years. |
| |
|
2.3 2.3.1 |
Contributions to Capital SchemesThere are increasing demands to undertake Landlord's repairs and maintenance works as an integral part of Education capital schemes. The benefits of doing so include: · less disruption to schools in the short/medium term · improved integration of work, particularly of engineering systems · economy of scale and efficiency from combined working.
It is proposed to set aside £1m from the Landlord's NDS Condition programme for this purpose. |
| |
|
|
3 |
Schools benefiting from NDS Condition 2001/02 to 2005/06 inclusive |
| |
|
3.1 |
It is estimated that some 50% of Hampshire Schools have now experienced at least one major capital repairs project from the NDS Condition Fund and some have had several major projects over this period. |
| |
|
3.2 |
Some key points to note include: · almost £56.7 million of NDS funding has been invested in addressing schools condition issues over the last five years. The investment should be seen against an overall liability in excess of £250 million. · Over 70% of the SCOLA mark 1 buildings have been reclad. · 70 school buildings have had major re-roofing. · 114 schemes of major heating and/or electrical renewals have been carried out. · 58 modern fire alarms schemes have been designed and implemented, mainly at secondary schools. · 223 schools have benefited from enhanced external redecoration with major capital repairs. · Over 65% of all pupils (110,000) are benefiting from the NDS capital repairs and external redecoration programmes that have been undertaken. |
| |
|
4 |
Conclusion |
| |
|
4.1 |
The NDS condition programme is continuing to have a noticeable impact on school buildings. Protecting the County Council's building and engineering asset base requires significant capital investment and the NDS programmes are an opportunity to address large scale replacement of building and engineering components as opposed to patch and mend strategies. |
4.2 |
The Government has indicated that there will be two further years (06/07 and 07/08) of NDS Modernisation (condition and suitability) investment. Beyond this, the investment picture is uncertain. It is important that the opportunity is taken to replace as many major building and engineering components as possible during this period of NDS investment. |
| |
|
4.3 |
The Government will be providing greater levels of devolved capital to schools and it will be important to work with schools to help guide them in directing devolved capital at the highest AMP priorities. |
| |
|
Recommendation |
That the Panel advises the Executive Member for Policy and Resources that approval be given to the priorities and programmes for the NDS Condition Fund allocation for 2005/06 as detailed in Appendices 1 and 2. |
The following documents disclose facts or matters on which this report, or an important part of it, is based and has been relied upon to a material extent in the preparation of this report.
2 Documents which disclose exempt or confidential information as defined in the Act
........................
........................
NDS Condition Programme 2005/06 |
| |
Schemes up to £50,000 |
| |
Building Works: |
| |
Alderman Quilley Secondary School. Replace asbestos ceilings. |
Brookfield Secondary School. Replace asbestos ceilings. |
Connaught Sec School. Replacement flat roof coverings. |
Cove Secondary School. Replacement flat roof coverings. |
Cove Secondary School. Contribution to School funded courtyard improvements. |
Crestwood Community School. Second phase of mall roofing. |
Eggars Secondary School. Replace asbestos ceilings. |
Eggars Secondary School. Replacement flat roofing. |
Fernhill Secondary School. Replacement roof finishes. |
Hounsdown Secondary School. External works. |
Neville Lovett Secondary School. External works. |
Petersfield Secondary School. Replace asbestos ceilings. |
Portchester Community School. External works. |
The Wavell School. Replace asbestos ceilings. |
Warblington Secondary School. Replace asbestos ceilings. |
Wyvern Technology College. Replace asbestos ceilings. |
Wyvern Technology College. Replacement drainage. |
Wyvern Technology College. Replacement rooflights. |
| |
Mechanical and Electrical Engineering Works: |
| |
Alderman Quilley School. Replace fan convectors. |
Alderman Quilley School. Rewiring and lighting replacement. |
Amery Hill School. Replace galvanised hot and cold pipework. |
Bridgemary School. Improve access to water tanks. |
Brune Park School, Wyvern College and Priestlands. Improve access to plantrooms. |
Brune Park School. Replace gate valves. |
Cove School. Convert boilers to gas. |
Cowplain Secondary School. Replace underground pipes at Centre/Sports Hall block. |
Fairfield Primary School. Replace lighting. |
Fairfield Primary, Hart Plain Infant and Ashford Hill Primary. Improve site access to plantroom. |
Fernhill Secondary School. Replace fan convectors. |
Foxhills Junior School. Replace HWS boiler. |
Fryern Junior School. Replace lighting. |
Guillemont Junior School. Replace heating and HWS boiler. |
Heatherside Junior School. Convert to cold water mains. |
Henry Cort School. Convert to cold water mains. |
Henry Cort School. Improve access to water tank. |
Horndean School. Renew hot water generator and gas pipework. |
Hurst Community College. Additional fire alarm link to Sports Hall. |
Kings School House. Rewiring and lighting replacement. |
Langdown Primary School. Extensive replacement pipework. |
Locksheath Junior School. Replace all domestic hot and cold pipework and convert to mains. |
Marnel Infant School. Replace main hall lighting. |
North Baddesley Infant School. Replace lighting in hall. |
Park Gate Primary School. Replace all domestic hot and cold pipework. |
Park Primary School. Replace cold water mains. |
Richard Aldworth School. Replace lighting. |
Rotherley Boarding House. Rewiring and lighting replacement. |
Salterns Special School. Replace boilers. |
Shipton Bellinger Primary. Replace galvanised pipework. |
Staunton Park Secondary School. Replace fan convectors. |
Stockbridge Primary School. Replace boiler/burners and controls. |
Swanmore College of Technology. Electrical rewiring. |
Swanmore College of Technology. Replace calorifier. |
Testbourne School. Modification to heating system. |
Thornden Secondary School. Modify boiler flue. |
Wallisdean Junior School. Replace all domestic hot and cold pipework. |
Wallisdean Junior School. Replace oil tanks. |
Westfield Infant School. Replace lighting. |
Westfield Junior School. Replace lighting. |
Yateley Secondary School. Replace lighting. |
| |
Schemes over £50,000 up to £100,000 |
Building Works: |
| |
Alderman Quilley School. Renew M & E services in Science rooms (as part of major capital scheme). |
Castle Primary School. Wall tie replacement. |
Connaught School. Window replacements. |
Connaught Secondary School. Re-clad sports hall. |
Costello Technology College. Replacement flat roof coverings. |
Court Moor Secondary School. Repairs to Redgra games pitch. |
Crookhorn Secondary School. Replacement roof finishes. |
Fordingbridge Infant School. Re-cladding. |
Hamble Secondary School. Surface water drainage. |
Henry Beaufort School. Window replacement. |
Henry Beaufort/Horndean/Brookfield. Structural fire precaution improvements. |
Hythe Primary School. Re-cladding/window replacements. |
Minstead Study Centre. Building refurbishment. |
Nightingale Primary School. Renew flat roof covering. |
Nightingale Early Years Centre. Building refurbishment |
Various Primary Schools. Hard landscaping repairs. |
| |
Mechanical and Electrical Engineering Works: |
| |
Barncroft Infant School. Boiler replacement. |
Barncroft Junior School. Boiler replacement. |
Brockhurst Junior School. Boiler replacement. |
Calthorpe Park School. Boiler replacement and asbestos removal. |
Neville Lovett School. Electrical mains upgrade. |
Oak Meadow Primary School. Boiler replacement. |
Oakley Infant and Junior Schools. Replacement cold mains to both schools and galvanised pipework replacement. |
Purbrook School - contribution to replacement fire alarm |
Romsey Infant School. Replace underground galvanised mains. |
Sopley Primary School. Replace boiler plant. |
South View Junior School. Boiler house refurbishment, new controls and asbestos removal. |
Stockbridge Primary School. Replace pipework. |
The Clere School. Replace lighting. |
The Vyne. New fire alarm system. |
Vigo Infant and Junior Schools. Replace boiler plant. |
Wallisdean Junior School. Boiler replacement and convert to gas. |
Wyvern Technology College. Boiler replacement. |
| |
Schemes over £100,000 up to £250,000 |
Building Works: |
| |
Amery Hill School. Replacement Windows. |
Brookfield Secondary School. Phase 2 re-cladding of SCOLA 1 buildings. |
Henry Cort Secondary School. Replacement Flat roof coverings. |
Netley Marsh CE Infant School. Structural Repairs/Asbestos removal. |
Neville Lovett Secondary School. Replacement Flat Roof Coverings. |
Noadswood Secondary School. Re-clad the Sports Hall. |
Oakridge Infant School. Re-cladding. |
South View Infant School. Re-cladding SCOLA 1 building. |
Staunton Park School. Refurbishment of the changing rooms and Sports Hall Windows work (as part of major Capital scheme). |
Various Primary Schools. Window Replacements associated with external redecoration schemes. |
Waterside Primary School. (Langdown). Renew flat roofs covering and fire precaution works. |
Yateley Secondary School. Replace asbestos ceilings and re-clad sports hall. |
| |