Archived decisions
Hampshire County Council | |||
Recreation and Heritage Policy Review Committee 14 July 2005 Executive Member - Recreation and Heritage service |
Item 9 Item 4 | ||
14 July 2005 |
|||
Final Accounts 2004/05- Recreation and Heritage service | |||
Report of the County Treasurer and Director of Recreation and Heritage | |||
Contact: Bevis Ingram, Contact Ext. 7508, e-mail: [email protected]
1 Summary
1.1 This report summarises the Recreation and Heritage service's spending in 2004/05, and it recommends that the final accounts for 2004/05 be approved.
1.2 Decisions on (Recreation and Heritage service) revenue, expenditure and capital programmes impact on the financial resources available to this service to contribute to the following corporate strategy aims:
i) maximising life opportunities
ii) stewardship of the environment
iii) achieving economic prosperity
iv) building strong and safe communities
v) improving services
vi) developing councillors and staff
1.3 Overall there is no variation against the 2004/05 adjusted revised revenue cash limit of £28m. This has been achieved because of a planned transfer from capital of £352,000 to accommodate Library and Information service budget pressures of £420,000 offset by net budget savings of £68,000 on other services. This represents an improved position since reported in the latest budget monitoring report. The required transfer from capital to revenue has reduced from £420,000 to £352,000.
1.4 The major variations are:
£'000 |
£'000 | |
Museums and Archives |
-33 | |
Milestones |
-33 | |
Libraries and Information Services |
+420 |
|
Transfer from capital |
-352 |
+68 |
1.5 The County Council's policy is to carry forward into the following year 100% of net overspendings and 50% of net unplanned underspendings. Cabinet decides what use should be made of the other 50% underspending. Because the Recreation and Heritage variation is zero none of these apply.
1.6 The outturn position on the service's business and trading unit Arts Marketing Hampshire is a deficit of £11,000.
1.7 On capital, schemes to the value of £3.1m were committed in the year and schemes to the value of £0.9m have been approved to be carried forward to start in 2005/06. In total the value of the cash limit is to be carried forward is £1.1m.
1.8 Further details on the main differences between the actual revenue expenditure and the revised budget for cash limited expenditure are given in Part A below while details of revenue expenditure which is not included in the cash limit are contained in the appendices at the end of the report. The results of the trading units are reported in Part B. Part C deals with capital schemes. Part D explains the basis of the control assurance statement included as Appendix 8.
2 Part A - Revenue expenditure under the service's control
2.1 Revenue expenditure under the service's direct control is subject to a cash limit. For 2004/05 the adjusted amount is £28m as set out in Appendix 1.
2.2 The final outturn was equal to the adjusted cash limit. The position has improved since the March monitoring report with a reduced capital transfer requirement of £352,000 (the March report forecast £425,000 capital transfer). The overall position is analysed in Appendices 2 and 3. Appendix 4 includes a more detailed statement of variations from the revised budget.
2.3 Variations from budget in recent years have been:
Variations from revised budget | |||
£'000 |
% |
||
2001/02 |
+593 |
2.4 | |
2002/03 |
-18 |
-0.1 | |
2003/04 |
-32 |
-0.8 | |
2004/05* |
- |
- | |
* Note The planned transfer from capital has matched what would otherwise have been an overspend of £352,000 (1.3%)
The most significant elements within the total net under/overspending are explained in the following paragraphs.
2.4 Museums and Archives (-£33,000)
Museums vacancy savings (-£60,000) and additional spending requirements on supplies and services (+£64,000), in particular the purchase of the Tichborne Collection funded by additional grant income (-£31,000).
2.5 Milestones (-£33,000)
Increased income and retail margin, partially offset by a reduction in catering income.
2.6 Library and Information service (+£68,000)
Pressures arose on the library Service as a result of reduced income (£277,000) while libraries closed for refurbishment, and also additional spending on bookstock for refurbished libraries. Management action to address these pressures resulted in vacancy management savings of £246,000 and a planned transfer from capital of £352,000. Previous monitoring reports (1 March 2005 and November 2004) have endorsed this action.
3 Key achievements
3.1 The library investment and refurbishment programme referred to earlier enabled the opening of Gosport Discovery Centre and the new library at Alton. Refurbishment was also completed at the libraries at:
· Odiham Bridewell
· Chandlers Ford
· Yateley
· Farnborough.
3.2 Other key achievements in 2004/05 have included:
· A successful bid for Cultural Pathfinder status
· The opening of a new accommodation block at Tile Barn Outdoor Centre
· Work began on new residential accommodation at Calshot Activities Centre
· Increased participation in cultural activities and visits
· Higher levels of satisfaction with our services (MORI survey)
· Implementation of new "open access" rights to countryside
· Green Flag recognition for Queen Elizabeth County Park
· Strategic reviews of Arts and Museums and Archives services
· Mini, Parallel and Youth Games
4 Part B - Trading units
Details of the financial performance of Arts Marketing Hampshire are set out in Appendix 5
5 Part C - Capital expenditure 2004/05
5.1 The outturn for 2004/05 is set out below with details of the total resources and of the individual schemes committed in the year appearing in Appendix 7.
Total | |||
£,000 | |||
Total resources (after adjustments detailed in Appendix 1) |
4,229 | ||
Value of schemes committed in 2004/05 |
-3,107 | ||
Value of schemes carried forward to 2005/06 |
-945 | ||
Undercommitment against the cash limit |
177 | ||
5.2 The total programme limit for 2004/05 amounted to £4,229,000 and schemes to the value of £3,107,000 were committed in the year
5.3 Schemes approved to be carried forward to start in 2005/06 included Romsey library extension, grants to village halls and countryside and rights of way improvements. The list of schemes committed and carried forward are included in Appendix 7.
5.4 The combined value of schemes which were committed in 2004/05 and those carried forward to start in 2005/06 is £4,052,000 which is below the cash limit and the balance of the cash limit can also be carried forward to 2005/06.
5.5 In accordance with the County Council's Financial Procedures, the final costs of capital schemes controlled on a starts basis completed in 2004/05 are listed in Appendix 7. "Completed" in this context means when the final payment has been made. Some of these schemes may have been in operation prior to April 2004, but the final payment was only made in 2004/05.
5.6 The final cost of the schemes completed in 2004/05 is £1,000 more than the latest approved estimate for those schemes charged to the service's capital cash limit.
5.7 It is proposed that the additional cost is charged to the capital cash limit for 2005/06.
6 Part D - Departmental assurance statement
6.1 From 2003/04 the Code of Practice on Local Authority Accounting in the UK requires the County Council within its Statement of Accounts to publish a Statement of Internal control signed by the Leader and the Chief Executive. As part of this process the Chief Internal Auditor is required to provide an independent opinion on the adequacy and effectiveness of the system of internal control operating in each department and in the County Council as a whole. These opinions are reviewed by the Governance Committee. Appendix 8 contains the statement relating to the Recreation and Heritage service and concludes that the Recreation and Heritage service has an effective framework of control which provides reasonable assurance regarding the effective, efficient and economic achievement of the County Council objectives.
Recommendations
1 That the final acounts for 2004/05 be approved.
2 That the cash limit adjustments, as detailed in Appendix 1, be approved.
3 That the additional cost of capital schemes completed in 2004/05 be deducted from the 2005/06 capital programme limit.
Section 100D - Local Government Act 1972 - background papers
The following documents disclose facts or matters on which this report, or an important part of it, is based and has been relied upon to a material extent in the preparation of this report.
NB the list excludes:
1. Published works.
2. Documents which disclose exempt or confidential information as defined in the Act.
TITLE
Summaries of actual spending 2004/05
Appendix Contents
1 Construction of the cash limit
2 Summary of revenue expenditure
3 Analysis of cash limited revenue expenditure over services
4 Major variations in cash limited expenditure
5 Trading units - summarised accounts 2004/05
6 Revenue expenditure 2004/05 not included in the cash limit
7 Capital expenditure 2004/05
8 Departmental assurance statement9
Appendix 1
Recreation and Heritage service
Revenue expenditure 2004/05
Construction of cash limit
1 |
In the revised budget revenue expenditure under the service's direct control was subject to a cash limit set by Cabinet of £28.2m. Variations in the cost of business rates are managed centrally because the level of business rates on the County Council's own properties could not be determined precisely when the revenue budget was set, because of the effect of revaluations and transitional arrangements. Actual expenditure on rates is £52,000 lower than was provided for in the revised budget and the cash limit has been adjusted accordingly. | |||
2 |
During the year part of the lump sum provisions in the capital programme were allocated to minor schemes of a revenue nature. Under the Code of Practice on Local Authority Accounting the expenditure on these schemes is required to be accounted for in the revenue account. The revenue budget has been increased by £195,000 to cover this expenditure by a transfer from the County Council's overall budget for revenue contributions to capital. The individual schemes will still however, continue to be controlled through the capital programme. | |||
3 |
A reduction in the revenue cash limit in order to increase the capital cash limit and the provision for the following schemes: | |||
£'000 | ||||
Argoed Llwyd |
54 | |||
Calshot accommodation block (to reduce prudential loan) |
121 | |||
Alton Library fit out |
100 | |||
Community buildings |
53 | |||
Tile Barn |
57 | |||
385 | ||||
4 |
A reduction in the revenue cash limit of £323,000 for contributions to the people's network to allow a matching contribution to capital outlay. | |||
5 |
A planned reduction in the capital programme of £352,000 (to accommodate library revenue budget pressures) as follows: | |||
£'000 | ||||
Permanent reduction |
-154 | |||
Temporary reduction |
-198 | |||
-352 | ||||
This planned reduction was reported in the November 2004 and March 2005 Budget Monitoring reports. |
||||
6 |
The adjustments referred to above are incorporated in the table below which summarises the position for the service in the year: | |||
£'000 | ||||
Revised budget for 2004/05 |
28,174 | |||
Decrease for lower level of business rates payable |
-52 | |||
Revenue schemes |
+195 | |||
Transfer to capital |
-385 | |||
Peoples network |
-323 | |||
Transfer from capital |
+352 | |||
Amended cash limit Net expenditure |
27,961 27,961 | |||
Variation against service's controllable expenditure. |
NIL | |||
Appendix 2
Recreation and Heritage service
Final Accounts 2004/05
Summary of Revenue expenditure
(1) |
(2) |
(3) |
||
Adjusted revised estimate |
Actual 2004/05 |
Variation (Col 2 - Col 1) |
||
£'000 |
£'000 |
£'000 |
% | |
27,961 |
27,961 |
- |
- | |
Trading units transferred from reserve account: |
|
|
|
|
- Arts Marketing Hampshire |
2 |
11 |
9 |
* |
- Historical publications |
- |
2 |
2 |
- |
Capital charges |
6,163 |
6,163 |
- |
- |
Other expenditure which is controlled centrally by Policy and Resources and recharged to this service |
||||
- Repair and maintenance of buildings |
1,142 |
1,150 |
8 |
0.7 |
- Central support services |
1,573 |
1,772 |
199 |
12.7 |
36,841 |
37,059 |
218 |
0.6 | |
- Adjustment for pension costs |
640 |
640 |
- |
- |
Expenditure controlled by this service recharged to Policy and Resources: |
||||
- Corporate and democratic core |
-123 |
-123 |
- |
- |
Total net expenditure |
37,358 |
37,576 |
218 |
0.6 |
Appendix 3
Recreation and Heritage service
Revenue expenditure 2004/05
Analysis of cash limited expenditure over services
(1) |
(2) |
(3) |
||
Adjusted revised estimate |
Actual 2004/05 |
Variation (Col 2 - Col 1) |
||
£'000 |
£'000 |
£'000 |
% | |
Cash limit expenditure |
||||
Analysis by division of service |
||||
Museums and archives |
3,296 |
3,263 |
-33 |
-1.0 |
Milestones |
143 |
110 |
-33 |
-23.1 |
Tourism |
556 |
554 |
-2 |
-0.4 |
Libraries and information |
14,662 |
14,730 |
+68 |
+0.5 |
Countryside |
4,486 |
4,475 |
-11 |
-0.2 |
Arts Sport and Community |
3,567 |
3,578 |
+11 |
+0.3 |
Calshot |
108 |
108 |
- |
- |
Policy Development fund |
571 |
572 |
+1 |
+0.2 |
Director and business development |
572 |
571 |
-1 |
-0.2 |
27,961 |
27,961 |
- |
- | |
Appendix 4
Recreation and Heritage Service
Revenue expenditure 2004/05
Major variations in cash limited expenditure - overall variation nil
Budget heading |
Variation |
Adjusted revised budget |
Reason |
£'000 |
£'000 |
||
Museums |
|||
Employees |
-60 |
2,420 |
Vacancy savings |
Supplies and services |
64 |
380 |
Additional spending requirements |
Income |
-31 |
-1,044 |
Higher income across the service |
Milestones |
-33 |
143 |
Increased income and retail margin, partially offset by a reduction in catering income |
Libraries and Information |
|||
Employees |
-246 |
11,394 |
Vacancy management |
Supplies and services |
381 |
3,021 |
Higher costs of people's network and additional spending on bookstock for refurbished libraries |
Fees and charges |
277 |
-2,074 |
Reduced income while libraries closed for refurbishment |
Transfer from capital |
-352 |
Planned transfer to offset overspends | |
Countryside |
|||
Premises |
43 |
510 |
Increased operational costs |
Equipment, furniture and materials and hired and contracted services |
40 |
523 |
Increased spending on operational activities |
Printing, stationery, marketing and promotions |
92 |
122 |
Increased spending, particularly on promotional activities |
Income |
-191 |
-1,049 |
Additional earned income across all sites |
Arts |
|||
Employees |
19 |
883 |
Primarily one-off costs associated with Arts review |
Fixtures and fittings |
16 |
3 |
Improved facilities |
Sport and community |
|||
Grants |
-21 |
181 |
Planned saving |
Note |
|||
The Milestones variation represents the net underspending for the year. Milestones is jointly managed with Basingstoke and Deane Borough Council and the management board has recommended that the underspending be carried forward to 2005/06. | |||
Appendix 5
Recreation and Heritage service
Trading units - summarised Trading Accounts 2004/05
The trading unit in this statement operates under the arrangements in Section D5 of Financial Procedures. This statement summarises its trading position and shows the movement in its reserve accounts.
Revised budget 2004/05 |
Actual 2004/05 | ||
£'000 |
£'000 | ||
Trading Account |
|||
289 |
286 | ||
Expenditure |
291 |
297 | |
Net operating deficit |
-2 |
-11 | |
Reserve Account |
|||
Surplus brought forward |
21 |
21 | |
Deficit |
-2 |
-11 | |
Surplus carried forward |
19 |
10 | |
Appendix 6
Recreation and Heritage service
Revenue expenditure 2004/05 not included in the cash limit
1 Capital charges (£6.2m)
Capital charges are made to services for capital assets used in the provision of services. The actual charges are £0.4m more than the budget. However, this will have no direct effect upon the overall budget requirement of the County Council as the capital charges are replaced by actual financing costs in the central asset management revenue account.
2 Central support services, repairs and maintenance of buildings (£2.9m)
These items are within the control of Policy and Resources. Support services are apportioned to services in accordance with the level of services provided and office accommodation occupied. Control of the budget for repairs and maintenance of buildings is exercised on a functional rather than service basis, but actual costs are allocated to the relevant service.
3 Adjustment for pension and early retirement costs (£0.6m)
This adjustment includes:
a) |
the difference between the cash value of employers' contributions to the Local Government Pension Scheme (LGPS) (included within the service's cash limited expenditure) and the current cost of pension benefits earned by members of the LGPS during 2004/05, as assessed by the County Council's actuary. This adjustment is required by the Code of Practice on Local Authority Accounting in the UK and is calculated in accordance with Financial Reporting Standard 17 (FRS 17) Retirement Benefits. It relates only to "defined benefit" schemes, including the LGPS, where the assets and liabilities of the scheme can be attributed to individual employers on a consistent and reasonable basis |
b) |
the costs arising from early retirement decisions and the granting of compensatory added years. These are within this service's cash limited expenditure, but are excluded from the cost of services in the final accounts, on the basis that the cost relates to past service. |
4 Corporate and democratic core (recharge £0.1m)
Corporate and democratic core covers management and support costs that relate to member support and advice, but are under the control of this service and thus are included within the service's cash limit. However the Best Value Accounting Code of Practice requires these costs to be aggregated and separated from the cost of providing front line services.
Appendix 7
Recreation and Heritage service
Capital expenditure 2004/05
£'000 | ||
1 |
Construction of total resources |
|
Original programme limit per 2004/05 budget book |
2,983 | |
Schemes brought forward from 2003/04 |
1,147 | |
Cash limit brought forward from 2003/04 |
56 | |
Share of 2003/04 capital receipts |
15 | |
Additional cost of schemes completed in 2003/04 |
-5 | |
Changes approved during year: |
||
- Calshot accommodation block |
121 | |
- Argoed Llwyd |
54 | |
- Alton Library fit out |
100 | |
- Community Buildings |
53 | |
- Tile Barn |
57 | |
- Transfer to revenue |
-352 | |
Total resources: |
4,229 | |
2 |
Schemes committed during 2004/05 |
|
a) |
Schemes controlled on a starts basis: |
|
Countryside and rights of way improvements |
342 | |
Grants to village halls |
25 | |
Community recreation and sport |
15 | |
West End Arts Centre |
21 | |
Fairfields Arts Centre |
32 | |
Tower Arts Centre |
15 | |
Arts Minor Grants |
6 | |
Discovery Centres development |
271 | |
Library improvement schemes |
450 | |
DDA schemes |
98 | |
Record Office improvements |
30 | |
Calshot accommodation block |
1,210 | |
Community buildings |
203 | |
Product development |
9 | |
ICT development |
21 | |
Partnership projects |
110 | |
Museums and archives improvements |
19 | |
Outdoor centres |
22 | |
Tile Barn |
57 | |
Basingstoke canal |
51 | |
Alton Library |
100 | |
Total schemes committed during 2004/05 |
3,107 | |
3 |
Schemes carried forward |
|
a) |
Schemes controlled on a starts basis: |
|
Grants to village halls |
125 | |
Outdoor centres |
48 | |
Arts minor grants |
5 | |
Product development |
41 | |
Partnership projects |
10 | |
Countryside and rights of way improvements |
121 | |
DDA schemes |
45 | |
ICT development |
49 | |
Rockbourne Roman Villa |
70 | |
Museums and archives improvements |
81 | |
Romsey library extension |
350 | |
Total |
945 | |
4 |
Summary of 2004/05 capital programme: |
|
4,229 | ||
Schemes committed during 2004/05 |
-3,107 | |
Balance of cash limit at 31 March 2005 |
1,122 | |
Schemes carried forward to 2005/06 |
945 | |
Net balance of cash limit remaining to meet inflation costs |
177 | |
Cash limit carried forward to 2005/06 |
1,122 | |
5 |
Final costs of capital schemes completed in 2004/05 |
|||||
Scheme |
Final cost |
Funded from external contri-butions |
Net cost chargeable to capital cash limit |
Latest approved cost |
Variation | |
£'000 |
£'000 |
£'000 |
£'000 |
£'000 | ||
Schemes and block votes under £250,000 |
481 |
- |
481 |
480 |
1 | |
Total |
481 |
- |
481 |
480 |
1 | |
Appendix 8
Recreation and Heritage service
Department assurance statement for the year ended 31 March 2005
1 Introduction
1.1 The Accounts and Audit Regulation 2003 require the County Treasurer to maintain an adequate and effective system of internal audit.
1.2 From 2002/03 the Code of Practice on Local Authority Accounting in the UK has required the County Treasurer to sign a statement on the system of internal financial control as a note to the published accounts. From 2003/04, the Leader and Chief Executive have also been required to sign a more general statement of internal control. To support this process, the Chief Internal Auditor is required to provide an independent opinion on the adequacy and effectiveness of the control environment, comprising risk management, control and governance for each department and the County Council as a whole.
2 Responsibilities
2.1 It is a management responsibility to develop and maintain the internal control framework, and to ensure that resources are properly applied in the manner and on the activities intended. It is the responsibility of Internal Audit to form an independent opinion, based on reviews during the year, on the adequacy and effectiveness of the system of internal control.
3 Basis of opinion
3.1 The strategic and annual internal audit plans were prepared by the Chief Internal Auditor to take account of the characteristics and relative risks of the activities involved and were approved by the County Treasurer. The internal audit plan has been delivered in accordance with the Code of Practice for Internal Audit in Local Government in the United Kingdom, issued by CIPFA.
3.2 Work has been planned and performed so as to obtain all the information and explanations which were considered necessary in order to provide sufficient evidence to give reasonable assurance that the internal control system is operating effectively. However, this assurance can never be absolute. The most that the internal audit service can do is to provide reasonable assurance that there are no major weaknesses in the system of control.
4 Opinion
4.1 In my opinion the Recreation and Heritage department has an effective framework of control which provides reasonable assurance regarding the effective, efficient and economic achievement of the department's objectives. Audit testing has shown that the controls are generally working in practice.
Ejner Knudsen
Chief Auditor
County Treasurer's Department
Hampshire County Council
9 June 2005