              DRAFT v7 17.11.05 - Appendix 3

HFRS - PEOPLE STRATEGY ACTION PLAN

1a

Area: Attracting, Recruiting and Retaining Staff

Issue: Workforce Planning

IRMP 200

Functional MTPs

(CPA)

People Management Objectives

Lead

People Management Priorities

Performance Indicators

National Benchmarking Data/Reports

Direct Financial Resources

Gap Analysis Reference and Supporting

     

2005/2006

2006/2007

2007/2008

   

2005/2006

2006/2007

2007/2008

Information

MR1

MTP:

HR: 4.1.1

CPA: 7

(i) By March 2008 to have improved workforce planning arrangements to ensure that the right number of people, with the right skills, are available at the right time to support Service delivery needs

Head of HR

By October 2005 to have commenced consultation on the draft Workforce Plan, People Strategy and Action plan to support the development of IRMP 3

By April 2006 to issue the revised Workforce Plan and Action Plan to Managers, aligned to IRMP 3

By June 2006 to have developed a workforce planning policy, structures and data requirements, that is compliant with data protection and freedom of information legislation requirements

 

By June 2007 to have clearly defined workforce planning structures and data requirements to support service delivery

By March 2008 to have succession planning incorporated into workforce plans

By March 2008 employee costs (including overtime and time in lieu) will be reduced through improved workforce planning

By March 2008 cost of agency / temporary staff will be reduced as a % of pay bill

 

nil

nil

 

HR Timeline Performance Management and Assessment

 

(ii) By March 2008 to have improved workforce planning arrangements to ensure that the right number of people, with the right skills, are available at the right time to support Service delivery needs

Head of HR

By December 2005 to establish new Workforce Planning Steering Group (WPSG) to take oversee Middle and Supervisory Manager Appointments, Transfers and Promotions activities and other HR-related activities

   

Workforce Planning will be influenced at the most senior level and actions will be proactive rather than reactive

Variance between authorised and actual establishment figures

 

nil

nil

   

MR1

MTP:

HR: 4.1.1

CPA: 7

(iii) By March 2006 appropriate mechanisms will be in place to adjust establishment levels or posts to meet current and future business requirements and SMT is updated on a regular basis with meaningful information

DHofHR

By March 2006 Variation to Establishment forms will be revised and updated to meet changing service and establishment needs

By March 2006 quarterly reports to SMT regarding establishment status

       

nil

nil

 

HR Timeline Performance Management and Assessment

MR1

MTP:

HR: 4.1.1

CPA: 7

(iv) By March 2008 there will be sound mechanisms in place to monitor the establishment highlighting instances of under or over agreed levels.

DHofHR

By March 2006 a policy will be in place regarding establishment management

 

By March 2008 the policy will be reviewed and amendments made accordingly

By March 2008 establishment information will be accurate and updated regularly

 

nil

nil

 

HR Timeline Performance Management and Assessment

MR1 R9

MTP:

HR: 4.1.1 4.1.2

4.1.8

CPA: 7

(v) By March 2008 to have supported work towards a regional fire control through local transitional arrangements.

DHofHR

By December 2005 to have provided all fire control employees with a facility for career counselling. To have identified through the training specification process, the requirements for re-skilling and business continuity planning

By September 2006 to have identified through the training specification process, the requirements for re-skilling and business continuity planning

By September 2007 to have identified through the training specification process, the requirements for re-skilling and business continuity planning

By September each year to have clearly defined learning and development requirements for fire control personnel to support the transition to regional control room.

 

£18k Training Budget

   

HR Timeline Regional Control

MR1 R3

MTP:

HR: 4.1.6 4.1.7

CPA: 28, 32, 33, 38, 70, 73, 80, 87

(vi) By March 2008 to undertake an organisational review to ensure posts reflect service delivery requirements as defined in the IRMP

DHofHR

 

By March 2007 to have undertaken an organisational review of jobs and structures to ensure that posts reflect service delivery requirements

By March 2008 to ensure that all roles are based on an IPDS compliant competency framework

By March 2006 to have undertaken an organisational review

% of posts with up to date job description and role map

% of posts covered by competency framework

% of employees competent in current role

         

1b

Area: Developing the Organisation

Issue: Equality and Diversity

IRMP 200

Functional MTPs

(CPA)

People Management Objectives

Lead

People Management Priorities

Performance Indicators

National Benchmarking Data/Reports

Direct Financial Resources

Gap Analysis Reference and Supporting

     

2005/2006

2006/2007

2007/2008

   

2005/2006

2006/2007

2007/2008

Information

MR1 MR3

MTP:

HR: 4.1.2 4.1.4

CPA: 7, 8, 51, 57, 58

(i) By March 2008 Service documentation will reflect the community in which the Service operates, is not discriminating, follows legislative/good practice guidelines and where appropriate incorporates specific reference to Diversity/ Equality of opportunities issues in service provision and/or complaints

Head of HR

 

All existing and new documentation is assessed by Commission for Racial Equality(CRE)/Equal Opportunities Commission(EOC)/disability groups and other key minority groups as non discriminatory. March 2007

By March 2008 to achieve Disability symbol

   

nil

nil

 

HR Timeline Revised Terms and Conditions of Employment

MR1 MR3

MTP:

HR: 4.1.1 4.1.2 4.1.3

CPA: 8, 23, 33, 57, 61

(ii) By March 2008 to ensure that E&D is mainstreamed into performance management and other key processes and identified diversity issues are tackled.

Head of HR

By March 2006 to deliver 100% of actions identified in the Corporate Equality Policy(CEP), Action Plan (CEAP) and the Race Equality Scheme (RES)

By March 2007 to deliver 100% of actions identified in the CEP and CEAP and RES

By March 2008 to deliver 100% of actions identified in the CEP and CEAP and RES

% of actions within the CEP delivered within identified timescales

BVPI 2

BVPI 11

BVPI 17

Direct cost identified in equality and diversity zero rated budget

Direct cost identified in equality and diversity zero rated budget

Direct cost identified in equality and diversity zero rated budge.

CEP, CEAP RES.

Regional Equality and Diversity Strategy

MR3

MTP:

HR: 4.1.4

CPA: 8, 39, 57, 58, 63

(iii) By December 2005 to be compliant with level 2 of the Equality Standard for Local Government

Head of HR.

By December 2005 review the CEP and CEAP to deliver against the targets

By December 2005 to achieve Level 2 of the Equality Standard for Local Government

-

-

 

BVPI 2

BVPI 11

BVPI 17

nil

nil

-

Link to CEP, CEAP and RES. Link to regional equality and diversity strategy.

MR3

MTP:

HR: 4.1.4

CPA: 8, 39, 57, 58, 63

(iv) By December 2006 to be compliant with level 3 of the Equality Standard for Local Government

Head of HR.

-

By December 2006 to achieve Level 3 of the Equality Standard for Local Government

By March 2007 to deliver 100% of actions identified in the CEAP and CEP and RES

-

By December 2006 to review the CEP and CEAP.

BVPI 2

BVPI 11

BVPI 17

nil

nil

-

Link to CEP, CEAP and RES. Link to regional equality and diversity strategy.

IRMP 200

Functional MTPs

(CPA)

People Management Objectives

Lead

People Management Priorities

Performance Indicators

National Benchmarking Data/Reports

Direct Financial Resources

Gap Analysis Reference and Supporting

     

2005/2006

2006/2007

2007/2008

   

2005/2006

2006/2007

2007/2008

Information

 

(v) By December 2006 to be compliant with level 3 of the Equality Standard for Local Government

Head of HR.

By January 2006 identify the resources and requirements to undertake a full `specialist' cultural audit during 2006/2007.

By December 2006 to undertake a full `specialist' cultural audit of the Service and feed areas for improvements into key strategies.

-

By June 2006 to identify the resources and requirements to undertake a full specialist cultural audit during 2006/2007.

By December 2006 to undertake a full `specialist' cultural audit of the Service and feed areas for improvements into key strategies.

Not available.

-

To be developed in 2005/2006.

-

Link to CEP, CEAP and RES. Link to regional equality and diversity strategy.

 

(vi) By December 2006 to be compliant with level 3 of the Equality Standard for Local Government

Head of HR.

By March 2006 to deliver training to support the CEP and RES.

By March 2007 to have delivered 100% of the actions identified in the CEP and RES for 2007/2008.

By March 2008 to have delivered 100% of the actions identified in the CEP and RES for 2007/2008.

By March 2008 to have delivered 100% of actions within the CEP delivered within identified timescales.

Not available.

Direct training costs identified in zero based budget.

Direct training costs identified in zero based budget.

Direct training costs identified in zero based budget.

Link to CEP, CEAP and RES. Link to regional equality and diversity strategy.

 

(vii) By March 2008 to have developed relevant monitoring processes to ensure that our workforce is representative of the community it serves

Head of HR

By December 2005 to have strengthened monitoring processes for all existing and new staff to ensure workforce profile kept up to date in line with RES

By September 2006 to have strengthened monitoring processes for all existing and new staff to ensure workforce profile kept up to date in line with RES

By September 2007 to have strengthened monitoring processes for all existing and new staff to ensure workforce profile kept up to date in line with RES

By December 2005 to have implemented workforce monitoring processes to ensure information always available and up to date

ODPM statistics

 

To be developed in 2005/2006

To be developed in 2006/2007

Link to CEP and RES

                       

1c

Area: Developing the Organisation

Issue: Core Values

IRMP 200

Functional MTPs

(CPA)

People Management Objectives

Lead

People Management Priorities

Performance Indicators

National Benchmarking Data/Reports

Direct Financial Resources

Gap Analysis Reference and Supporting

     

2005/2006

2006/2007

2007/2008

   

2005/2006

2006/2007

2007/2008

Information

MR3

MTP:

HR: 4.1.4

CPA: 7, 58, 88

(i) By March 2008 to have taken an inclusive approach to introducing core values to promote the image of HFRS as a good employer by improving workforce understanding, commitment and compliance with core values.

DCO

By December 2005 to initiate a project team under the control of the LDG to prepare and initiate implementation of the core values, including incorporating expertise of external consultants, benchmarking best practice within the fire industry and developing a comprehensive communications and marketing plan.

Continue to embed core values into key processes and review.

Continue to embed core values into key processes and review.

% of employees who think values are important in the way that we work.

% of employees who state that the introduction of a values led approach to the way we work is making an impact in the Service.

FRS national framework document.

To be identified

   

Link to RES and CEP.

Regional equality and diversity strategy.

MR1

MTP:

HR: 4.1.1

CPA: 24, 25, 28

(ii) Create a culture where employees ideas can freely be given, assessed and implemented or if not implemented constructively managed to maintain motivation

DCO

Employee suggestion scheme introduced. December 2005

   

Employee survey results % saying can raise issues/ideas freely

         
                       

1d

Area: Developing the Organisation

Issue: Work-Life Balance

IRMP 200

Functional MTPs

(CPA)

People Management Objectives

Lead

People Management Priorities

Performance Indicators

National Benchmarking Data/Reports

Direct Financial Resources

Gap Analysis Reference and Supporting

     

2005/2006

2006/2007

2007/2008

   

2005/2006

2006/2007

2007/2008

Information

MR1 MR4

MTP:

HR: 4.1.5 4.1.9

CPA: 9, 51, 76

(i) Employees are supported in achieving a healthy work / life balance

ERM

     

% of employees agree they have a healthy work life balance

% of posts with flexible working in place

% of posts open to job share

Managers actively encourage changes to working patterns after major life events

Number of employees taking leave for caring responsibilities in accordance with our policy on work-life balance

 

nil

nil

 

HR Timeline Occupational, Health, Safety & Welfare

HR Timeline Work-life Balance

MR1 MR4

MTP:

HR: 4.1.5 4.1.9

CPA: 9, 51, 76

(ii) By March 2008 to have improved ways of working that promote and deliver a safe, caring and healthy working environment

ERM

 

By April 2006 determine benchmark for effectiveness of health, safety and welfare policies and practices

By April 2007 determine benchmark for effectiveness of health, safety and welfare policies and practices

% of employees who agree that they work in a safe environment

% of employees who agree that the services provided by the Service offer satisfactory levels of support.

 

nil

   

HR Timeline Occupational, Health, Safety & Welfare

HR Timeline Work-life Balance

MR1 MR4

MTP:

HR: 4.1.4 4.1.5

CPA: 23, 39, 54, 56, 58, 69

(iii) By March 2008 to identify and develop policies that support a diverse workforce

Head of HR

By March 2006 to have identified and developed policies that promote work life balance and family friendly working and contribute to aims and objectives of fire authority

By March 2007 to have implemented policies that promote work life balance and family friendly working and contribute to aims and objectives of Fire Authority

-

% of staff who state that they are satisfied with the level and effectiveness of family friendly policies

-

nil

To be developed in 2005/2006

To be developed in 2005/2006

Link to corporate equality plan

Link to investors in people

Link to regional HR work programme

HR Timeline Work-life Balance

1e

Area: Developing the Organisation

Issue: Employee Relations and Communications

IRMP 200

Functional MTPs

(CPA)

People Management Objectives

Lead

People Management Priorities

Performance Indicators

National Benchmarking Data/Reports

Direct Financial Resources

Gap Analysis Reference and Supporting

     

2005/2006

2006/2007

2007/2008

   

2005/2006

2006/2007

2007/2008

Information

MR 1

MTP:

HR 4.1.2

CPA: 7, 21, 24 25, 33, 36, 37, 55

(i) By March 2008 we will have strengthened our partnership approach to consultation and negotiations processes with our employees and trade unions through a business-focused approach

ERM

By March 2006 to have carried out discussions with our trade unions and employee representatives to explore methods of improved partnership working

By March 2007 to have updated and published a revised Workplace Partnership Agreement

Continue to improve on partnership working.

By March 2007 to have produced a revised Workplace Partnership Agreement

 

nil

   

Workplace Partnership Agreement

HR Timeline Revised Terms and Conditions of Employment

MR 1

MTP:

HR 4.1.2

CPA: 7, 21, 24 25, 33, 36, 37, 55

(ii) By March 2008 we will have revised our Facilities Agreement to support joint working

   

By March 2007 to have revised our Facilities Agreement

 

By March 2008 to have an up to date Facilities Agreement

 

£20k

     

MR1, MR4

MTP:

HR 4.1.4, 4.1.9

CPA: 77, 88

(iii) To Reduce levels of complaints from the public against the Service ( this is in the broader context of External complaints, eg. Employment Tribunals, Personal Injury Claims, complaints from the public regarding Service delivery / conduct of our employees

ERM

By March 2006 to have developed a method of measuring levels of complaints against the Service in terms of cost, numbers, frequency and trends

Collect Data

By March 2008 to review data and analyse with regard to policy, training, management consistency, transparency, partnership working and inter functional liaison.

To be developed

 

nil

nil

 

HR Timeline Revised Terms and Conditions of Employment

1f

Area: Developing the Organisation

Issue: Attendance Management

IRMP 200

Functional MTPs

(CPA)

People Management Objectives

Lead

People Management Priorities

Performance Indicators

National Benchmarking Data/Reports

Direct Financial Resources

Gap Analysis Reference and Supporting

     

2005/2006

2006/2007

2007/2008

   

2005/2006

2006/2007

2007/2008

Information

MR1 MR2, MR4

MTP:

HR 4.1.9

CPA: 9, 37, 51, 63, 65, 76

(i) By March 2008 to minimise absence due to sickness to increase capacity and reduce costs and to improve support for those who are suffering from ill health

ERM

By September 2005 to established an Attendance Improvement Working Group and project plan with timetable for actions

By April 2006 to have implemented the Attendance Improvement Working Group action plan reflecting managerial objectives and actions across all functions

By April 2007 to have implemented the recommendations of the Attendance Improvement Working Group

Consolidate with Absence Management Policy

Sickness absence figures reduced

Ill health retirement figures reduced

BVPI 12

BVPI 15

nil

nil

As defined by strategy

HR Timeline Revised Terms and Conditions of Employment

HR Timeline Occupational, Health, Safety & Welfare

MR1 MR4

MTP:

HR: 4.1.2, 4.1.9

CPA: 9, 51, 76

(ii) By March 2008 to minimise absence and improve support for those who are suffering from ill health

ERM

Develop our Attendance Management Improvement Plan and launch revised absence management policy by December 2005

By September 2006 to have identified good practice in absence management and set benchmarks

By March 2007 implement benchmarking process to include targets for absence management, setting local performance indicators

By March 2008 to have carried out a process of review and evaluation

By March 2007 to have developed and implemented local benchmarking and targets for absence management

BVPI 12

     

HR Timeline Revised Terms and Conditions of Employment

HR Timeline Occupational, Health, Safety & Welfare

 

(iii) By March 2008 to minimise absence and improve support for those who are suffering from ill health

ERM

 

By March 2007 to have sickness levels (for all staff) at X days/shifts per year

By March 2008 to have sickness levels (for all staff) at X days/shifts per year

Decrease in number of working days/shifts lost to sickness absence

Trends identified and actioned regarding absence ascribed to specific causes

BVPI 12

       
 

(v) By March 2008 to minimise absence and improve support for those who are suffering from ill health

Head of HR

By April 2006 to review current provision of occupational health service (OHS) and ensure efficient future provision demonstrating value for money (including consideration of regional approach)

Ensure managers are aware of OHS provisions

Intentionally blank

By April 2006 to have completed review of OHS provision

Length of time in relation to work after OHS referral

% of employees who use OHS and are satisfied with provision

National Framework Document (Ch 5.29 - Regional Approach)

       

IRMP 200

Functional MTPs

(CPA)

People Management Objectives

Lead

People Management Priorities

Performance Indicators

National Benchmarking Data/Reports

Direct Financial Resources

Gap Analysis Reference and Supporting

       
     

2005/2006

2006/2007

2007/2008

   

2005/2006

2006/2007

2007/2008

Information

MR1 MR4

MTP:

HR: 4.1.1 4.1.9

CPA: 9, 37, 51, 63, 65, 76

(vi) By March 2008 to have minimised the numbers leaving the Service as a result of ill health and provided support for those who remain

ERM

 

By July 2006 to have strengthened the management of long term sickness and ill health retirements having regard to the DDA

Intentionally blank

% of employees declaring that they meet the DDA 1996

 

nil

   

HR Timeline Revised Terms and Conditions of Employment

HR Timeline Occupational, Health, Safety & Welfare

MR1 MR2, MR4

MTP:

HR 4.1.9

CPA: 9, 37, 51, 63, 65, 76

(vii) By March 2008 to minimise absence and improve support for those who are suffering from ill health

ERM

By March 2006 to have reviewed policies regarding sickness absence management and support for employees who are suffering from ill health

 

To deliver support and rehabilitation for those covered by the DDA to retain valued employees wherever possible.

By March 2008 to deliver improved support procedures for those on long term sickness, rehabilitation, DDA and retirement process contained in the policy on Absence Management

% of employees retiring on ill health grounds as a % of total workforce.

BVPI 15

nil

 

Overall should produce a saving in terms of reduced pension payments

HR Timeline Revised Terms and Conditions of Employment

HR Timeline Occupational, Health, Safety & Welfare

1g

Area: Developing the Organisation

Issue: Flexible Working Arrangements

IRMP 200

Functional MTPs

(CPA)

People Management Objectives

Lead

People Management Priorities

Performance Indicators

National Benchmarking Data/Reports

Direct Financial Resources

Gap Analysis Reference and Supporting

     

2005/2006

2006/2007

2007/2008

   

2005/2006

2006/2007

2007/2008

Information

MR1 R3 R5 R6

MTP:

HR: 4.1.5 4.1.6 4.1.7

CPA: 20, 28, 31, 32, 52, 55, 70, 73, 80, 84, 87

(i) By March 2008 to improve flexible working options that support service delivery and individual requirements

Head of HR

By March 2006 to identify HR policy requirements to support the review of duty systems and crewing arrangements and develop implementation plan with costs

By March 2007 implement 100% of HR policies required to support outcomes of the duty system and crewing arrangement review

By March 2008 implement 100% of HR policies required to support outcomes of the duty system and crewing arrangement review

By March 2006 to identify HR policy requirements and implementation plan to support outcome of duty system and crewing arrangement review

% of HR policies implemented within timescale

 

nil

   

HR Timeline Work-life Balance

 

(ii) By March 2008 to improve flexible working options that support service delivery and individual requirements

Head of HR

Intentionally blank

By September 2006 to have developed a strategy and policy on workforce remodelling to create a more flexible workforce

Further support future organisational structure review and ensure it takes into account flexible working patterns

Sub strategy on workforce remodelling by September 2006.

% of posts identified as suited to flexible working

 

nil

     
 

(iii) By March 2008 to improve flexible working options that support service delivery and individual requirements

Head of HR

 

By September 2006 to identify through the job evaluation and rank to role process the number of posts that are suitable for flexible working

By September 2007 to evaluate through employee opinion surveys the effectiveness of flexible working policies within HFRS

% of posts where postholders are working flexibly

% of employees agreeing that there is flexibility to help meet home/work commitments

 

nil

     

                      1h

Area: Developing the Organisation

Issue: Change Management

IRMP 200

Functional MTPs

(CPA)

People Management Objectives

Lead

People Management Priorities

Performance Indicators

National Benchmarking Data/Reports

Direct Financial Resources

Gap Analysis Reference and Supporting

     

2005/2006

2006/2007

2007/2008

   

2005/2006

2006/2007

2007/2008

Information

MR1 MR2

MTP:

HR: 4.1.1

CPA: 7, 20, 22, 24, 25, 33, 37, 51, 52, 53

(i) Enable managers and employees to recognise, support and promote change within the Service

DCO

By March 2006 develop a Change Management training programme to be attended by all managers

By March 2007, appropriate change management processes will be applied to all re-organisations/

changes:

- Planning

- Communication

- Consultation including Trade Unions

       

Training Budget

   

MR1 MR2

MTP:

HR: 4.1.1

CPA: 25, 33

(ii) By March 2008 to have improved performance in change management through activities defined in the Marketing and Communications Strategy

DCO

By March 2006 to deliver 100% of actions identified in the Marketing and Communications Strategy

By March 2006 to deliver 100% of actions identified in the Marketing and Communications Strategy

By March 2006 to deliver 100% of actions identified in the Marketing and Communications Strategy

% of actions within the Marketing and Communications Strategy completed within specified timescales

 

Costs included in the Marketing and Communications Strategy

     

MR1 MR2

MTP:

HR: 4.1.1

CPA: 62

(iii) By March 2008 to ensure employee involvement in all planned service changes and identified managers have the expertise to undertake this role

SDO(T)

By March 2006 to ensure all project managers are identified within the corporate planning framework and their training needs are identified and met

On-going

On-going

% of project managers responsible for planned service changes who have received project management training

% of published project plans that include stakeholder consultation and involvement

100% of projects are Equality Impact Assessed at the appropriate stages

         

2a

Area: Developing Leadership Capacity

Issue: Strategic Management Development

IRMP 200

Functional MTPs

(CPA)

People Management Objectives

Lead

People Management Priorities

Performance Indicators

National Benchmarking Data/Reports

Direct Financial Resources

Gap Analysis Reference and Supporting

     

2005/2006

2006/2007

2007/2008

   

2005/2006

2006/2007

2007/2008

Information

MR1 MR2

MTP:

HR: 4.1.1 4.1.3

CPA: 24, 53

(i) By March 2008 to have increased the corporate capacity of the Service Management Team through improved support and leadership development to strengthen performance and ensure sound governance

DCO

By March 2006 to have identified and programmed joint SMT/middle managers building activities and secondment opportunities as appropriate.

Intentionally blank.

Intentionally blank.

% of SMT/middle managers who have attended programmed team building activities.

   

Training budget

 

HR Timeline Performance Management and Assessment

 

(ii) By March 2008 to have increased the corporate capacity of the Service Management Team through improved support and leadership development to strengthen performance and ensure sound governance

DCO

By March 2006 all members of SMT to have undertaken a personal development and performance review and developed a personal development plan

By March 2007 all members of SMT to have undertaken a personal development and performance review and developed a personal development plan

By March 2008 all members of SMT to have undertaken a personal development and performance review and developed a personal development plan

% of SMT members with current personal development plans

 

Found from existing resources

     

MR1 MR2

MTP:

HR: 4.1.2 4.1.3

CPA: 5, 7, 36, 53, 65

(iii) By March 2008 to have identified requirements for a high level leadership programme to ensure that HFRS has strong leadership and direction and to build corporate capacity

DCO / SDO(T)

By September 2005 to have identified requirements and options to deliver high level leadership competence through targeted learning and development

By September 2006 to have identified requirements and options to deliver high level leadership competence through targeted learning and development

By September 2007 to have identified requirements and options to deliver high level leadership competence through targeted learning and development

% of SMT/middle managers trained and assessed against leadership competencies

% of employees saying that they know how their work contributes to Service aims and objectives

FRS national framework.

Budget approved - to be identified

   

Learning and Development Strategy

HR Timeline Performance Management and Assessment

2b

Area: Developing Leadership Capacity

Issue: Member Development

IRMP 200

Functional MTPs

(CPA)

People Management Objectives

Lead

People Management Priorities

Performance Indicators

National Benchmarking Data/Reports

Direct Financial Resources

Gap Analysis Reference and Supporting

     

2005/2006

2006/2007

2007/2008

   

2005/2006

2006/2007

2007/2008

Information

MR2

MTP:

HR: 4.1.3

CPA: 18, 65, 66

(i) By March 2008 to have improved the quality of political leadership by strengthening engagement and targeted development of HFRA members

SDO(T)

By September 2005 to have developed and agreed a member seminar programme for 2006/2007, having regard to outcomes of the member review process

By September 2006 to have developed a member seminar programme for 2007/2008, having regard to outcomes of the member review process

By September 2007 to have developed a member seminar programme for 2008/2009, having regard to outcomes of the member review process

% of members who have attended seminar programme

Local Authority elected member role maps

 

Training budget - to identify

 

HR Timeline Performance Management and Assessment

MR2

MTP:

HR: 4.1.1 4.1.3

CPA: 18, 65, 66

(ii) By March 2008 to improve the level of support to new members joining the HFRA

SDO(T)

By December 2005 to have developed and delivered revised member induction programme and handbook and identified member mentors to support new members (to include `whistle blowing' procedures)

Intentionally blank

Intentionally blank

% of new members attending the induction programme

% member mentors

Local Authority elected member role maps

nil

   

HR Timeline Performance Management and Assessment

MR2

MTP:

HR: 4.1.1 4.1.3

CPA: 18, 65, 66

(iii) By March 2008 to support and improve members development through the annual review process

SDO(T)

By July 2006 all Fire Authority members to have undertaken a personal review

By July 2007 all Fire Authority members to have undertaken a personal review

By July 2008 all Fire Authority members to have undertaken a personal review

% of Fire Authority members attending the induction programme

Local Authority elected member role maps. Members job descriptions

     

HR Timeline Performance Management and Assessment

MR2

MTP:

HR: 4.1.3

CPA: 18, 65, 66

(iv) By March 2008 to have improved the quality of political and managerial leadership by strengthening engagement of Fire Authority members

SDO(T)

By March 2006 to have reviewed and implemented new member/officer protocols, role maps and code of conduct with clear roles and responsibilities

   

By March 2006 to have introduced new role maps, code of conduct and officer/member protocols for Fire Authority members

Local Authority elected member role maps

 

Training budget

   

MR2

(v) By March 2008 to have improved the quality of leadership by raising the awareness of Fire Authority members with regards to diversity issues

Head of HR

By March 2006 to have identified training needs of elected members in relation to diversity

By September 2006 all elected members will have undergone a training programme to raise awareness of diversity

By September 2007 all elected members will have undergone a training programme to raise awareness of diversity

By September 2008 all elected members will have undergone a training programme to raise awareness of diversity

Local Authority elected member role maps. Members job descriptions

       
 

(vi) By March 2008 to have improved the quality of political and managerial leadership by strengthening engagement of Fire Authority members

SDO(T)

By December 2005 to have identified lead members to have received induction into the working of appropriate functions aligned to HFRA Committees

   

By March 2006 lead members to have been inducted into appropriate functional activities

         

2c

Area: Developing Leadership Capacity

Issue: Developing Leadership

IRMP 200

Functional MTPs

(CPA)

People Management Objectives

Lead

People Management Priorities

Performance Indicators

National Benchmarking Data/Reports

Direct Financial Resources

Gap Analysis Reference and Supporting

     

2005/2006

2006/2007

2007/2008

   

2005/2006

2006/2007

2007/2008

Information

MR2

MTP:

HR: 4.1.3

CPA: 5, 18, 19

(i) By March 2008 to have improved the leadership capacity and competence ensuring that the Service has strong leadership and direction at all levels

DCO

 

By March 2007 to have developed and implemented a values led leadership programme linked to National Occupational Standards (NOS) for identified middle and strategic managers

By March 2007 to have trained 100% of the identified managers in the leadership programme for middle and strategic managers to the level defined within the Learning and Development Strategy

By March 2008 to have developed and implemented a valued led leadership programme linked to National Occupational Standards (NOS) for all supervisory managers

% of identified managers trained and assessed against leadership programme competencies

% of employees who state that they understand the direction of HFRS

National Framework Document

 

Training budget - details required

 

Learning and Development Strategy

 

(ii) By March 2008 to have improved the leadership capacity and competence ensuring that the Service has strong leadership and direction at all levels

SDO(T)

By March 2006 to evaluate the potential of the ODPM/LGA `future leadership programme' for sustainable development of middle/strategic manager leadership capacity/competence

Intentionally blank

Intentionally blank

By October 2005 to have evaluated and reported on the ODPM/LGA `future leadership programme' for future consideration within HFRS

 

nil

     
 

(iii) By March 2008 to have improved the leadership capacity and competence ensuring that the Service has strong leadership and direction at all levels

SDO(T)

Intentionally blank

By September 2006 to strengthen the links between the secondment opportunities for personnel within Princes Trust and the leadership and management programmes, with leadership objectives clearly mapped to NOS competencies and personal qualities and attributes.

Intentionally blank

By September 2006 to have strengthened the links between the secondment opportunities within Prices Trust and the leadership and management programmes

         

3a

Area: Developing Workforce Skills and Capacity

Issue: Management Development

IRMP 200

Functional MTPs

(CPA)

People Management Objectives

Lead

People Management Priorities

Performance Indicators

National Benchmarking Data/Reports

Direct Financial Resources

Gap Analysis Reference and Supporting

     

2005/2006

2006/2007

2007/2008

   

2005/2006

2006/2007

2007/2008

Information

MR1 MR2

MTP:

HR: 4.1.3

CPA: 53

(i) By March 2008 to have improved the level of management development by encouraging and supporting self improvement and achievement.

SDO(T)

By March 2006 to have developed and implemented continuous personal development (CPD) records for all middle and strategic managers.

By March 2007 to have developed and implemented continuous personal development (CPD) records for all middle and strategic managers.

Intentionally blank.

% of managers with current continuous personal development (CPD) records.

       

Learning and Development Strategy

                       

3b

Area: Developing the Organisation

Issue: People Performance Management

IRMP 200

Functional MTPs

(CPA)

People Management Objectives

Lead

People Management Priorities

Performance Indicators

National Benchmarking Data/Reports

Direct Financial Resources

Gap Analysis Reference and Supporting

     

2005/2006

2006/2007

2007/2008

   

2005/2006

2006/2007

2007/2008

Information

MR1 MR2

MTP:

HR: 4.1.1

CPA: 37, 51, 53, 63, 66, 82, 85

(i) By March 2008 to improve performance management and ensure systems are in place to enable managers to undertake their performance management role

Head of HR / SDO(T)

By January 2006 to have undertaken a gap analysis of new or emerging HR issues regarding performance management and plan for training programme to target these

By March 2006 to have strengthened HR targets, benchmarks and local indicators to monitor the effectiveness of HR policies and practices, linked to the Service planning framework

Feed in to annual revisions to People Strategy

By December 2006 to have developed systems to monitor the effectiveness of the People Strategy objectives and determine priority interventions to improve performance

Feed in to annual revisions to People Strategy

By March 2008 to have developed a sub-strategy to consider ways of measuring intangible assess such as culture and motivation to inform future People Strategy interventions

By April 2007 to have a performance management review system established

Feed in to annual revisions to People Strategy

By September 2006, Function Plans include people management objectives

By September 2006 to have developed new indicators to monitor HR performance

By December 2007 to have developed systems to monitor effectiveness of People Strategy

% of employees who indicate they know how their work directly contributes to service aims and objectives as defined by the IRMP

By November each year to feed people management implications and targets into service planning framework

 

nil

   

People Strategy

MR1 MR2

MTP:

HR: 4.1.1

CPA: 53

(ii) All employees have an annual performance review meeting with their line manager and a follow up review after 6 months

March 2008 to have achieved IiP accreditation

SDO(T)

By September 2005 to have commenced preparation for Investors in People (IiP) accreditation and designed the process

By March 2007 to have implemented IiP

By March 2008 to have reviewed progress with IiP and achieved IiP accreditation

% employees having had a performance review meeting with line manager

% employees agree opportunities for development and keeping job interest are good customer survey

IiP accreditation achieved

Costs to be identified - from within existing resources

Training budget - to be identified

   

Employee Survey

Training function Timeline

IRMP 200

Functional MTPs

(CPA)

People Management Objectives

Lead

People Management Priorities

Performance Indicators

National Benchmarking Data/Reports

Direct Financial Resources

Gap Analysis Reference and Supporting

       
     

2005/2006

2006/2007

2007/2008

   

2005/2006

2006/2007

2007/2008

Information

 

(iii) By March 2008 to have improved the approach to achievement through learning

SDO(T)

   

By March 2008 to have reviewed Training evaluation process and policy

% of employees satisfied with learning and development activity

% of employees who have acquired new skills through attending learning and development activities

 

nil

   

Investors in People

Learning and Development Strategy

3c

Area: Developing Workforce Skills and Capacity

Issue: Achieving and Maintaining Competence through IPDS

IRMP 200

Functional MTPs

(CPA)

People Management Objectives

Lead

People Management Priorities

Performance Indicators

National Benchmarking Data/Reports

Direct Financial Resources

Gap Analysis Reference and Supporting

     

2005/2006

2006/2007

2007/2008

   

2005/2006

2006/2007

2007/2008

Information

MR1

MTP:

HR: 4.1.1

CPA: 19, 48, 60, 63, 75

(i) By March 2008 we will have established benchmarks to monitor HR service delivery against others in family group on qualitative and quantitative issues.

Head of HR / SDO(T)

     

Service is in top % of family group for KPIs.

In top % for PIs annually

 

nil

   

HR Timeline Performance Management and Assessment

MR1

MTP:

HR: 4.1.1

CPA: 53, 54

(ii) HR team to undertake CPD activities by formal training and encouragement and inclusion in development projects

Head of HR / SDO(T)

     

% of HR Team CIPD qualified.

All professionally qualified HR team members maintain a CPD Record.

% of HR team involved in corporate projects and working groups

% of HR team involved in Regional and National Working Groups

 

Provided for in Training budget

Provided for in Training budget

   

MR2

MTP:

HR: 4.1.3

CPA: 54

(iii) By March 2007 to have implemented all components of the Integrated personal Development system and ensure that all learning and development provided to employees supports the IRMP and identified Service improvement needs

SDO(T)

By March 2006 to have delivered 100% of the actions within the Training Strategy for 2005/06 to deliver IPDS

By March 2007 to have delivered 100% of the actions within the Training Strategy for 2006/07 to deliver IPDS

By March 2008 to have delivered 100% of the actions within the Training Strategy for 2007/08 to deliver IPDS

By March 2008 to have delivered 100% of the actions within the Training Strategy to deliver IPDS

       

Learning and Development Strategy

 

(iv) By March 2007 to have implemented all components of the Integrated personal Development system and ensure that all learning and development provided to employees supports the IRMP and identified Service improvement needs

SDO(T)

   

By March 2008 to have developed mechanisms to evaluate the success of meeting learning and development needs at individual, team and organisational level

% of employees satisfied with learning and development activity

% of employees that have acquired new skills through learning and development activities

         
 

(v) By March 2007 to have implemented all components of the Integrated personal Development system and ensure that all learning and development provided to employees supports the IRMP and identified Service improvement needs

SDO(T)

 

By March 2007 to have developed and implemented revised annual competency recording for all Grey Book employees based on personal Development Plans

By March 2008 to have developed and implemented revised annual competency recording for all Green Book employees based on personal Development Plans

By March 2008 to have implemented revised annual competency recording for all employees

% of employees who are competent in current role

% of employees who are in development for future roles

         

3dArea: Developing Workforce Skills and Capacity

Issue: Raising Levels of Development and Performance

IRMP 200

Functional MTPs

(CPA)

People Management Objectives

Lead

People Management Priorities

Performance Indicators

National Benchmarking Data/Reports

Direct Financial Resources

Gap Analysis Reference and Supporting

     

2005/2006

2006/2007

2007/2008

   

2005/2006

2006/2007

2007/2008

Information

MR2

MTP:

HR: 4.1.3

CPA: 51, 53, 54

(i) By March 2008 to have improved the level of management development by encouraging and supporting self-improvement and achievement

SDO(T)

 

By September 2006 to evaluate external validation of leadership programme and future affiliation with professional organisations (eg. Chartered Institute of Management) to support managers and maintain accredited levels of CPD

 

By March 2008 to report on opportunities for future affiliation with professional organisations to maintain accredited levels of CPD

       

Learning and Development Strategy

MR2

MTP:

HR: 4.1.3

CPA: 51, 53, 54

(ii) By March 2008 we will have up to date training records and monitoring processes that record a fair distribution of training and development opportunities within the service

SDO(T)

     

% of employees holding a professional qualification

levels of management and development training

Average Days Training - internal per employee

Average days training external per employee

Amount spent on training per employee

       

Learning and Development Strategy

MR2

MTP:

HR: 4.1.3 4.1.4

CPA: 51, 53, 54

(iii) By March 2008 we will have harmonised opportunities for training for all employees - Green and Grey book

▪ IPDS

▪ National Vocational Qualifications

▪ Mentoring

▪ E learning

▪ Investors in people

▪ Business skills.

▪ Professionally qualified and CPD team

SDO(T) / Head of HR

By March 2006 all employees to have a personal development plan completed in time to meet Training planning programme and budget cycles.

Functional training plans to be in place

An annual corporate training plan to be in place and monitored by SMT

By March 2007 all employees to have a personal training portfolio.

 

Training opportunities will be harmonised across the service

       

Learning and Development Strategy

MR2

MTP:

HR: 4.1.3

CPA: 51, 53, 54

(iv) By March 2008 to improve access to learning and development for all employees and increase the use of electronic systems to support self improvement and achievement

SDO(T)

Intentionally blank.

By March 2007 to have undertaken a survey of employees to ascertain preferences to access learning and development events and information

By September 2008 to produce a sub strategy to improvement access to learning and development opportunities and information to better support all employees (including consideration of E-learning).

By March 2007 to have undertaken survey of employees learning preferences.

By September 2008 to have developed sub strategy to improve access to learning events and information.

% of employees who are satisfied by the level of access to and information on learning and development events

       

Learning and Development Strategy

4a

Area: Recruiting and Retaining Employees

Issue: Attracting and Recruiting and inducting a Diverse Workforce

IRMP 200

Functional MTPs

(CPA)

People Management Objectives

Lead

People Management Priorities

Performance Indicators

National Benchmarking Data/Reports

Direct Financial Resources

Gap Analysis Reference and Supporting

     

2005/2006

2006/2007

2007/2008

   

2005/2006

2006/2007

2007/2008

Information

MR1 MR4

MTP:

HR: 4.1.4

CPA: 23, 39, 54, 56, 58, 69

(i) By March 2008 to have developed specific strategies to ensure that our workforce is representative of the community it serves

Head of HR

By March 2006 to have achieved 100% of the actions in the CEP, CEAP and RES for recruitment and selection for 2005/2006

By March 2007 to have achieved 100% of the actions in the CEP, CEAP and RES for recruitment and selection for 2006/2007

By March 2008 to have achieved 100% of the actions in the CEP, CEAP and RES for recruitment and selection for 2006/2007

% of actions achieved for recruitment and selection within the CEP and RES within planned timescales

BVPI 2a and 2b

BVPI 17

Nil

To be developed in 2005/2006

To be developed in 2005/2006

Fire and Rescue Service national framework 2005/2006

Link to regional HR work programme

MR1 MR4

MTP:

HR: 4.1.4 4.1.5

CPA: 23, 39, 54, 56, 58, 69

(ii) By March 2008 to have developed specific strategies to ensure that our workforce is representative of the community it serves

Head of HR

By September 2005 to have reviewed current recruitment practices and put in place procedures that ensure non discriminatory auditable recruitment processes

-

-

By September 2005 to have procedural document and guidance for recruitment practices in place

BVPI 11a, 11b and 11c

BVPI 17

Nil

To be developed in 2005/2006

To be developed in 2005/2006

Link to CEP and RES

Link to regional HR work programme

 

(iii) By March 2008 to have developed specific strategies to ensure that our workforce is representative of the community it serves

Head of HR

By March 2006 to have reviewed positive action initiatives and put in place programme of events for forthcoming year

By March 2007 to have reviewed positive action initiatives and put in place programme of events for forthcoming year

By March 2008 to have reviewed positive action initiatives and put in place programme of events for forthcoming year

By March each year to have developed a positive action programme

BVPI 11a, 11b and 11c

BVPI 17

Nil

To be developed in 2005/2006

To be developed in 2005/2006

Link to CEP and RES

 

(vi) By March 2008 to have developed specific strategies to ensure that our workforce is representative of the community it serves

Head of HR

-

By September 2006 to have reviewed advertising policy and practice to ensure media and materials used attract a diverse workforce by promotion of a positive image of the Fire Service as an employer

By April 2007 to have implemented the revised advertising policy

% of women and people from black and minority ethnic backgrounds who apply for jobs

BVPI 11a, 11b and 11c

Nil

To be developed in 2005/2006

To be developed in 2005/2006

Link to Marketing and Communications Strategy

Link to regional HR work programme

HR Timeline Work-life Balance

                       

Community Safety Plan Reference

People Management Objectives

Lead

People Management Priorities

Performance Indicators

National Benchmarking Data/Reports

Direct Financial Resources

Gap Analysis Reference and Supporting

     

2005/2006

2006/2007

2007/2008

   

2005/2006

2006/2007

2007/2008

Information

 

(vii)By March 2008 to have developed specific strategies to ensure that our workforce is representative of the community it serves

Head of HR

By March 2006 to have developed regional recruitment protocols to ensure consistency in application of the new national firefighter selection processes

By April 2006 to have planned and implemented introduction of Firefighter selection tests for all firefighter selection processes equally

Review progress and amend procedures accordingly

By April 2006 to have planned and implemented introduction of firefighter selection tests for all firefighter selection processes equally, including those conditioned to the retained duty system

Not yet identified

Not yet identified

To be developed in 2005/2006

To be developed in 2005/2006

Link to CEP

Link to regional HR work programme

 

(ix) By March 2008 to have developed specific strategies to ensure that our workforce is representative of the community it serves

DHof HR

By March 2006 to ensure that all staff involved in recruitment have been identified and provided with appropriate training

By March 2007 to ensure that 100% staff involved in recruitment and selection have been identified and provided with appropriate training

By March 2008 to ensure that 100% staff involved in recruitment and selection have been identified and provided with appropriate training

% staff identified for involvement in recruitment and selection that have been trained to identified level

Not yet identified

Nil

To be developed in 2005/2006

To be developed in 2005/2006

Link to CEP and RES

Link to regional HR work programme

 

(x) By March 2008 to have developed specific strategies to ensure that our workforce is representative of the community it serves

Head of HR

By March 2006 ensure written policy and procedures in place to ensure HFRS appoints and retains employees using guidance on medical criteria for appointment and retention of staff and is compliant with DDA

-

-

By September 2006 to have procedural document and guidance for all appointments and management of DDA issues

CFOA/DRC guidance document

Nil

To be developed in 2005/2006

To be developed in 2005/2006

Link to CEP

Link to regional HR work programme

MR1

MTP:

HR: 4.1.1, 4.1.6

CPA: 7, 56, 58

(xi) By March 2008 to have developed a flexible workforce

Head of HR

Intentionally blank

By March 2007 to have developed protocols for multi-tier entry

Intentionally blank

% of staff entering the Service above Ff level

BVPI 11a, 11b, 11c

       

                      4b

Area: Attracting, Recruiting and Retaining Staff

Issue: Induction

IRMP 200

Functional MTPs

(CPA)

People Management Objectives

Lead

People Management Priorities

Performance Indicators

National Benchmarking Data/Reports

Direct Financial Resources

Gap Analysis Reference and Supporting

     

2005/2006

2006/2007

2007/2008

   

2005/2006

2006/2007

2007/2008

Information

MR1 MR2

MTP:

HR: 4.1.2

CPA: 51

(i) By March 2008 all new starters will be provided with a programme of induction including diversity and core values awareness and service missions, aims and performance culture

DHofHR

By March 2006 all new employees are inducted corporately within 3 months of starting. Initial induction will take place in their own function initially. This is to include agency/temporary employees

Probation reports agreed with all probationers within 2 weeks of end of probation period and appropriate action taken to confirm employment or to address issues

   

By September 2006 all new starters will have followed probation procedure and will be confirmed in employment after 6 months or issues will have been addressed in accordance with policy on probation

% employees satisfied with induction process

 

nil

nil

   

MR1 MR2

MTP:

HR: 4.1.2

CPA: 51

(ii) By March 2008 all existing employees will have undertaken a programmed induction process into new roles within the Service

DHofHR

 

By March 2007, all employees who transfer to a new role / post, will undergo an induction process

By March 2008, all employees who transfer to a new role / post will be provided with a development plan

% new starters and existing employees who have received a formal induction process

% of employees who have a development plan

 

nil

nil

   

MR1 MR2

MTP:

HR: 4.1.2

CPA: 51

(iii) By March 2008 to have strengthened our induction processes to increase the capabilities of new employees

DHofHR

By March 2006 to have developed an intranet section for easy reference by employees

By March 2007 to update intranet section for induction

By March 2007 to have prepared an Employee Handbook for all employees

By March 2008 to update intranet section for induction

By March 2006 to have an up to date intranet section for induction

 

nil

nil

   

4c

Area: Attracting, Recruiting and Retaining Staff

Issue: Retention

IRMP 200

Functional MTPs

(CPA)

People Management Objectives

Lead

People Management Priorities

Performance Indicators

National Benchmarking Data/Reports

Direct Financial Resources

Gap Analysis Reference and Supporting

     

2005/2006

2006/2007

2007/2008

   

2005/2006

2006/2007

2007/2008

Information

MR1 MR2

MTP:

HR: 4.1.2

CPA: 53, 54

(i) By March 2008 to have processes in place that support and encourage self improvement and achievement of all staff

SDO(T)

Intentionally blank

By March 2007 to have developed workload management policy and feed training requirements into training specification process

Intentionally blank

% of people who say they can manage their workload

 

nil

     

MR1 MR4

MTP:

HR: 4.1.2, 4.1.4

CPA: 57, 58

(ii) By March 2008 to have supported progress towards national targets on retention of women and black and minority ethnic groups through local strategies

Head of HR

Intentionally blank

By March 2007 to have developed challenging local indicators and strategies to improve performance towards national targets

Intentionally blank

Achievement of ODPM targets for retention of women and black and minority ethnic groups

FRS national framework

nil

     

MR1 MR4

MTP:

HR: 4.1.2 4.1.4

CPA: 57, 58

(iii) By March 2008 to have processes in place to gather information to support the retention of employees

DHofHR

By March 2006 to have implemented a post exit policy to strengthen information on retention problem areas

   

% people who undertake post exit interviews or complete questionnaires

reasons given for leaving and actions taken

 

nil

     

MR1 MR4

MTP:

HR: 4.1.2 4.1.4

CPA: 57, 58

(iv) Manage the retention of skills in skills shortage areas

Head of HR

By March 2006 to have a policy on re-employment of existing employees to meet business needs and that conforms to Equality Impact Assessment processes

   

Pension schemes adapted to manage changes in employment due to health/skill levels and greater age retentions

Redeployment plan to provide redeployment options and opportunities at later stages of working career

 

nil

     

4d

Area: Attracting, Recruiting and Retaining Staff

Issue: Release Processes

IRMP 200

Functional MTPs

(CPA)

People Management Objectives

Lead

People Management Priorities

Performance Indicators

National Benchmarking Data/Reports

Direct Financial Resources

Gap Analysis Reference and Supporting

     

2005/2006

2006/2007

2007/2008

   

2005/2006

2006/2007

2007/2008

Information

MR1

MTP:

HR: 4.1.2

CPA: 7, 69

(i) By March 2008 to ensure full support for those who are leaving HFRS

ERM

By March 2006 to have reviewed our Exit policy and all other procedures that feed into it as required under the Disputes Resolution Regulations 2004

By March 2007 to review and revise policies regarding leaving the Service, including redundancy, redeployment, efficiency of the service, retirement, re-employment etc.

By March 2008 Review Exit Policy and all others procedures that feed into it

By March 2007 to have implemented a Dismissal Policy as required under the Disputes Resolution Regulations 2004

By March 2008 to have reviewed and developed Exit policy and procedures

% grievances

Reduced number of complaints raised in exit interviews

Reduced number of complaints regarding processes of leaving the service

 

nil

   

HR Timeline Revised Terms and Conditions of Employment

HR Timeline Occupational, Health, Safety & Welfare

5a

Area: Pay and Rewards

Issue: Pay and Reward System

IRMP 200

Functional MTPs

(CPA)

People Management Objectives

Lead

People Management Priorities

Performance Indicators

National Benchmarking Data/Reports

Direct Financial Resources

Gap Analysis Reference and Supporting

     

2005/2006

2006/2007

2007/2008

   

2005/2006

2006/2007

2007/2008

Information

MR1 MR3

MTP:

HR: 4.1.7

CPA: 39, 69, 73, 87

(i) By March 2008 all posts to be subject to job evaluation and alignment to appropriate role maps

Head of HR

By March 2006 outcome of job evaluation for Grey Book posts completed and published

All Grey Book posts aligned to appropriate role maps by March 2006

 

All Green Book posts aligned to role maps by September 2007

All posts on establishment aligned to role maps by March 2008

 

Budget provision for increase pay and back pay

     

MR1

MTP:

HR: 4.1.7

CPA: 5, 7, 39

(ii) By March 2008 to have implemented modernised pay systems

Head of HR

By March 2006 to have developed and implemented policy on rank to role assimilation, development and competent rates of pay

By July 2006 to have a policy established on Additional Responsibility Allowances (ARAs)

By March 2007 to have in place a system for periodic review of roles

 

% of employees satisfied that their pay is fairly determined and reflects their responsibilities and competence

 

Nil

ARAs to be paid subject to funds being available from existing resources

   

HR Timeline

Revised Terms and Conditions of Employment

 

(iii) By March 2008 to have implemented modernised pay systems

By March 2008 to have developed a Fair Pay Policy

D H of HR

 

By July 2006 to have engaged an external consultant to carry out a full equal pay audit

By March 2007 to have carried out equal pay audit and to have positively commenced addressing any issues arising from this

By March 2008 to have established programme of regular equal pay audits.

% of top 5% of earners who are:

- Women.

- From minority ethnic communities.

    - Disabled

Outcome of Equal Pay Audit reflects compliance with Equal Pay legislation

Policy on Fair Pay established

BVPI 11

 

Costs to be identified and allocated from existing resources

   

5b

Area: Pay and Rewards

Issue: Conditions of Service

IRMP 200

Functional MTPs

(CPA)

People Management Objectives

Lead

People Management Priorities

Performance Indicators

National Benchmarking Data/Reports

Direct Financial Resources

Gap Analysis Reference and Supporting

     

2005/2006

2006/2007

2007/2008

   

2005/2006

2006/2007

2007/2008

Information

MR1

MTP:

HR:

CPA: 69

(i) By March 2008 to have assessed the potential for harmonisation of Green and Grey Book Staff on all conditions of Service

ERM

By March 2006, policies regarding Single Status are developed in partnership with all Trade Unions and benefits are harmonised where possible taking account of varying conditions of service

Intentionally blank

By March 2008 to have considered long term position for achieving a single status for all employees taking account of the varying conditions of service, in terms of People Strategy Development

All policies are the subject of consultation and equality impact assessed

 

nil

   

HR Timeline Revised Terms and Conditions of Employment

MR1

MTP:

HR: 4.1.1

CPA:

(ii) By March 2008 employees will be provided with a cost-neutral package of pay and non pay benefits

DHofHR

   

By March 2008 a range `cafeteria' of benefits available to all employees to choose according to life cycle position

   

nil

     

MR1

MTP:

HR: 4.1.1

CPA: 54, 65, 66

(iii) By March 2008 all employees will have a clear picture of their role and Service expectations from them

DHofHR

 

By December 2006 all employees will have up to date contracts of employment and job descriptions

 

100% of employees will have up to date contracts of employment and job descriptions

 

nil

     

MR1

MTP:

HR: 4.1.1

CPA: 56, 65, 66

(iv) By March 2008 ensure that conditions of service support performance management and continuous improvement in line with annual review of the IRMP

Head of HR

 

By September 2006 identify issues in consultation with representative bodies for areas of local negotiation and consultation

 

Draft people strategy developed by September each year to show conditions of service issues identified for local agreement in coming year

 

nil

     
                       

5c

Area: Pay and Rewards

Issue: Pensions

IRMP 200

Functional MTPs

(CPA)

People Management Objectives

Lead

People Management Priorities

Performance Indicators

National Benchmarking Data/Reports

Direct Financial Resources

Gap Analysis Reference and Supporting

     

2005/2006

2006/2007

2007/2008

   

2005/2006

2006/2007

2007/2008

Information

MR1

MTP:

HR: 4.1.4

CPA:

(i) By March 2008 to be fully supporting all employees with regard to pension schemes

DHofHR

 

By April 2006 to have arrangements in place to implement the new firefighters pension scheme

By March 2008 to have arrangements in place to implement the new Local Government Pension Scheme (LGPS)

By April 2006 to have implemented arrangements for the new firefighters pension scheme

By March 2008 to have arrangements in place to implement the new Local Government Pension Scheme (LGPS)

 

nil

     
 

(ii) By March 2008 to be fully supporting staff with regard to pension schemes

DHofHR

By April 2006 to have retirement procedures in place to implement revisions to existing pension schemes for all employees

Intentionally blank

Intentionally blank

By April 2006 to have retirement procedures in place to implement revisions to existing pension schemes for all employees

 

nil

     

MR1

MTP:

HR: 4.1.1

CPA: 7, 27, 51

(iii) To strengthen the workforce planning processes

DHofHR

Intentionally blank

Intentionally blank.

By September 2007 to have developed pension `scenario' planning to inform our workforce planning and medium term financial plan

By March 2008 to have implemented robust pension planning arrangements as part of the workforce planning process

 

nil

   

HR Timeline Performance Management & Assessment

6a

Area: Developing the Organisation

Issue: HR Management Information

IRMP 200

Functional MTPs

(CPA)

People Management Objectives

Lead

People Management Priorities

Performance Indicators

National Benchmarking Data/Reports

Direct Financial Resources

Gap Analysis Reference and Supporting

     

2005/2006

2006/2007

2007/2008

   

2005/2006

2006/2007

2007/2008

Information

MR1 MR 2 MR 9

MR 10

MTP:

HR: 4.1.1

CPA: 65, 66, 84, 85

(i) By March 2008 to have introduced a new HR/Training Management Information System to provide sound performance management information and reports to support all managers and assist decision making

DCO

By March 2006 to have identified data requirements and physical resources to support performance management and workforce planning requirements

By March 2007 to have commenced procurement process for new HR/Training management information system

By March 2008 to have fully implemented new HR/Training management information system with fully functional reporting processes

HR data and resource requirements identified by March 2006. HR data and resources requirements implemented by March 2008

% statistical reports produced within requirements/

deadlines

HMI Statistics

 

Costs to be determined - subject to tender process .

To be funded from existing resources - Training budget

 

HR Timeline Performance Management and Assessment

MR1 MR2

MTP:

HR 4.1.2

CPA: 21, 22, 25, 37, 51, 52, 76

(ii) By March 2008 to better support managers throughout the service with timely and relevant HR policies and management information systems

Head of HR

By December 2005 to have developed a prioritised, rank ordered list of HR policies and plans for policy development which will be equality impact assessed as part of development or revisions

To undertake a review of policy register in view of emerging issues and Equality Impact Assessment outcomes and to update accordingly

On-going review of policy register in view of emerging issues and Equality Impact Assessment outcomes and to update accordingly

Trade Unions consulted on Policy/

procedures/terms and conditions changes, as part of `red letter' days

Constructive feedback from Trade Unions

Meetings held annually with our Trade Unions / employee representatives to discuss People Strategy and HR issues. (4 per year)

FRS Framework Document

nil

   

SE HRDG Medium term plan

Workplace Partnership Agreement

Marketing and Communications Strategy

HR Timeline Revised Terms and Conditions of Employment

HR Timeline Performance Management and Assessment

 

(iii) By March 2008 to better support managers throughout the service with timely and relevant HR policies and management information systems

Head of HR

By March 2006 to have developed and implemented 100% of HR policies identified for 2005/06

By March 2007 to have developed and implemented 100% of HR policies identified for 2006/07

By March 2008 to have developed and implemented 100% of HR policies identified for 2007/08

100% of policies completed and implemented within plan timescales

 

nil

   

Workplace Partnership Agreement

HR Timeline Revised Terms and Conditions of Employment

IRMP 200

Functional MTPs

(CPA

People Management Objectives

Lead

People Management Priorities

Performance Indicators

National Benchmarking Data/Reports

Direct Financial Resources

Gap Analysis Reference and Supporting

     

2005/2006

2006/2007

2007/2008

   

2005/2006

2006/2007

2007/2008

Information

MR1 MR2 MR9 MR10

MTP:

HR: 4.1.1

CPA: 84, 85

(iv) That managers and employees can access HR policies, procedures, guidance notes and templates on our Web Publishing System (WPS)

DhoHR/

IS Manager

By March 2006 information relating to HR will be comprehensive and up to date and able to be accessed by managers using the WPS

By March 2007, the information will be revised and updated to meet managers' needs

By March 2008, the information will be revised and updated to meet managers' needs

Managers apply procedures consistently and involve HR at appropriate points.

Employee survey

reduction in key HR actions eg.

    - Disciplinaries

    -Grievances

    - Complaints of harassment or bullying

 

nil

   

HR Timeline Performance Management and Assessment

MR1 MR10

MTP:

HR: 4.1.1

CPA: 22, 84, 85

(v) Enable all new HR systems to be integrated/be networked to other relevant Service/HCC databases/ systems or at minimum provide easily accessible hotlinks.

Enable integrated payroll, HR, training, medical data management.

DhoHR/

IS Manager

     

Identify links to other systems at business analysis stage

Any HR database being considered to be examined for potential to be produced from existing systems.

Review existing software systems.

Evidence of consideration of links on all HR system development.

Evidence of consideration of existing systems

Business analysis completed with any specifications completed by December 2005.

 

nil

   

HR Timeline Performance Management and Assessment

IRMP 200

Functional MTPs

(CPA)

People Management Objectives

Lead

People Management Priorities

Performance Indicators

National Benchmarking Data/Reports

Direct Financial Resources

Gap Analysis Reference and Supporting

     

2005/2006

2006/2007

2007/2008

   

2005/2006

2006/2007

2007/2008

Information

                       

MR1 MR9

MTP:

HR: 4.1.1

CPA: 65, 84

(vi) By March 2008 HR systems will be rationalised for ease of data input, management and extraction

DhoHR/

IS Manager

Replacement of old systems

RFI. March 2005

Revelation. December 2005

       

Costs found from existing resources

   

HR Timeline Performance Management and Assessment

MR1 MR10

MTP:

HR: 4.1.1

CPA: 22, 37, 65, 84, 85

(vii) By March 2008 there will be a reduction in central data and control of management data input and access will be devolved to employees/managers

DhoHR/

IS Manager

 

By March 2007 we will have implemented the Employee Self Service and Managers Desk Top, including training

           

HR Timeline Performance Management and Assessment

6b

Area: Attracting, Recruiting and Retaining Staff

Issue: Strengthening People Management Practice

IRMP 200

Functional MTPs

(CPA)

People Management Objectives

Lead

People Management Priorities

Performance Indicators

National Benchmarking Data/Reports

Direct Financial Resources

Gap Analysis Reference and Supporting

     

2005/2006

2006/2007

2007/2008

   

2005/2006

2006/2007

2007/2008

Information

MR1 MR2

MTP:

HR 4.1.2

CPA: 21, 22, 24, 25, 37, 39, 51, 52, 69, 76

(i) By March 2008 to have ensured that managers are confident to properly and consistently apply employee relations policies and practices

ERM

By March 2006 to have developed and implemented employee relations policies and procedures in line with national revisions and regional timescales

By April 2006 to have carried out a review of all employee relations policies and procedures in line with regional work plans and medium term plan.

By March 2008 to have reviewed the effectiveness of the revised policies and procedures and training programmes to provide adequate training for managers to fulfil their roles regarding people management

Improved attendance figures

Sickness absence statistics

Ill-health retirement cases

BVPI 12

BVPI 15

ER budget

ER budget

ER budget

SE HRDG medium term plan

HR Timeline Revised Terms and Conditions of Employment

 

(ii) By March 2008 to have ensured that managers are confident to properly and consistently apply employee relations policies and practices

ERM / SDO(T)

 

By April 2006 to have carried out a training needs analysis and produced a strategy and plan for managerial training in employee relations issues

 

% of employee complaints, grievances or discipline cases reaching formal level of procedure

         

MR1 MR2

MTP:

HR 4.1.2

CPA: 36, 37, 38, 51, 52, 55, 82

(iii) By March 2008 to have increased the confidence of our managers to engage with our trade unions and employees as regards consultation on local matters

ERM

SDO(T)

By September 2005 to have identified managers' levels of consultation skills and training solutions to support the gaps in skills and knowledge

By September 2006 to have identified, developed and implemented improved practices to strengthen partnership working with representative bodies including better engagement through cross-functional working

Continue to improve on partnership / cross functional working

By September 2006 to have implemented identified policy and practices to strengthen partnership / cross functional / cross level working on key issues.

       

HR Timeline Revised Terms and Conditions of Employment

MR1 MR2

MTP:

HR 4.1.2

CPA: 21, 22, 24, 25, 37, 39, 51, 52, 69, 76

(iv) By March 2008 to have raised the levels of performance and professional standards to support continuous improvement

ERM

By September 2005 to have developed and implemented revised disciplinary procedures for uniformed roles, through regional collaboration, based on ACAS procedures

Intentionally blank

By September 2008 to have revised and implemented disciplinary policy and procedures, based on ACAS procedures, for all employees

By September 12005 introduced revised disciplinary procedures for uniformed roles based on ACAS principles

By September 2008 to have introduced consistent disciplinary procedures for all employees based on ACAS procedures

Not yet identified.

     

Learning and Development Strategy

HR Timeline Revised Terms and Conditions of Employment

 

(v) By March 2008 to have raised the levels of performance and professional standards to support continuous improvement

ERM

By March 2006 to have developed and implemented revised Service processes to allow investigation and hearing of disciplinary issues to support the revised procedures, clearly defining roles and responsibilities

Intentionally blank

Intentionally blank

By March 2006 to have introduced revised Service internal processes to support new discipline procedures, clearly defining roles and responsibilities

 

nil

     
 

(vi) By March 2008 to have raised awareness of procedures and processes regarding conduct at work to support continuous improvement

ERM

Intentionally blank

Intentionally blank

By March 2008 to have reviewed and implemented revised code of conduct for all employees and raised the level of awareness in `whistle blowing' procedures

By March 2008 to have implemented revised code of conduct and raised the level of awareness in `whistle blowing' procedures

% of employees who state that they are aware of and understand what the code of conduct means

% of employees who state that they are aware of and understand what the `whistle blowing' procedures are

         

6c

Area: Developing the Capacity of Human Resources

Issue: Optimising contribution of HR

IRMP 200

Functional MTPs

(CPA)

People Management Objectives

Lead

People Management Priorities

Performance Indicators

National Benchmarking Data/Reports

Direct Financial Resources

Gap Analysis Reference and Supporting

     

2005/2006

2006/2007

2007/2008

   

2005/2006

2006/2007

2007/2008

Information

     

.

.

 

.

         

MR1 MR 2 MR4

MTP:

HR: 4.1.2

CPA: 39, 47, 69,

(i) By March 2008 to have increased the capacity of the HR function through improved regional working.

Head of HR

By March 2006 to have developed a regional People Management Strategy which focuses on the key areas of activity in the 3 key areas of Employee Resourcing, Development and Relations:

Employee Resourcing:

Recruitment processes, Assessment and Development Centres, working patterns, job evaluation, occupational health

Employee Development:

development programmes; training of assessors and verifiers; training strategies

Employee Relations:

HR policies; work-life balance; terms and conditions of service; equality and diversity

By December 2006 to develop a Service Level Agreement between HR function and other HFRS functions and between HR function and SE HRDG

to increase HR capacity and effectiveness

.

By December 2006 to have implemented protocols and Service Level Agreements as appropriate for all HR local and regional partnerships

By December 2005 to have a regional strategy for Supervisory Manager ADC

FRS National Framework.

nil

   

SE HRDG Medium term plan and timelines

HR Timeline Revised Terms and Conditions of Employment

HR Timeline Performance Management and Assessment

MR1

MTP:

HR: 4.1.1

CPA: 62, 82

(ii) By March 2008 there will be greater clarity of purpose in HR projects

By March 2008 we will consistently apply project management processes and(Prince II for larger projects

Head of HR

HR top level timelines linked to corporate aims and objectives

Project plans for larger projects produced and managed by allocated team members using project management principles and Prince II methodology for larger projects

Local timelines produced and managed by allocated HR team members

   

HR Function 3 year medium term revised commencing November each year.

Progress from previous year assessed and reported on to HR Committee at end of year as part of performance review process.

Projects managed via project management principles

 

nil

   

HR Timeline Performance Management and Assessment

MR1 MR8

MTP:

HR: 4.1.1

CPA: 25, 37

(iii) Communicate HR services internally and externally in a timely and accurate manner

Head of HR

By March 2006, HR branding will be established. Role and contact points for HR function will be communicated to all managers as part of the Marketing and Communications Strategy, particularly to reflect changes to role and responsibilities of HR teams

On-going

On-going

Managers apply procedures consistently and involve HR at appropriate points.

Employee survey.

reduction in key HR actions eg.

    - Disciplinaries

    - Grievances

Complaints of harassment or bullying

 

nil

   

HR Timeline Revised Terms and Conditions of Employment

MR1

MTP:

HR: 4.1.1

CPA: 48, 63, 73

(iv) By March 2008 we will have reviewed all our tender processes to ensure compliance in all areas of outsourcing

DHofHR

By March 2006 HR cost centres will be identified with costs and on costs

By March 2006 we will publish our tender for Recruitment Agencies

By March 2006 we will publish our tender for Advertising Agencies

 

Tender for legal services. September 2009

% of outsourced HR activities will be subjected to value for money and auditable process

 

HR Ops budget - tender process to determine cost

   

HR Timeline Performance Management and Assessment

MR1

MTP:

HR: 4.1.2 4.1.4

CPA: 23, 39, 54, 56, 58, 69

(v) By March 2008 to have increased capacity of HR in attracting and selecting a diverse workforce

Head of HR

By March 2006 to have built capacity throughout the Service by strengthening our approach to, and participating in regional working on recruitment and selection processes

By March 2007 to have built capacity throughout the Service by strengthening our approach to, and participating in regional working on recruitment and selection processes

By March 2008 to have built capacity throughout the Service by strengthening our approach to, and participating in regional working on recruitment and selection processes

By March 2008 to have a regional agreement on recruitment and selection arrangements in place

% of candidates feeding back positively from assessment processes

Costs of recruitment and assessment

Average length of time taken to fill vacancies

BVPI 17, BVPI 11a, 11b and 11c

Fire and Rescue Service national framework 2005/2006

nil

To be developed in 2005/2006

To be developed in 2005/2006

Fire and Rescue Service national framework 2005/2006

Link to regional HR work programme

MR1

MTP:

HR: 4.1.2

CPA: 7, 69

(vi) By March 2008 to lead the regional rationalisation of HR Services in line with RMB position

Head of HR

Establish HR team members on Regional/National Working Groups

   

HFRS represented on all HR SE HRDG working groups by December 2005

 

nil

     

MR1

MTP:

HR: 4.1.1

CPA: 35, 62, 73

(vii) By March 2008 to support HR function by innovative contracting

Head of HR

Intentionally blank

Intentionally blank

By March 2008 to have explored options for increased HR capacity by outsourcing appropriate HR functions

By March 2008 to have increased the number of HR functions outsourced

 

nil

     
 

(viii) By March 2008 to have the right people and management structures in place to support performance improvement

Head of HR

Intentionally blank.

By March 2007 to have implemented revised HR structures to deliver continuous improvement

Intentionally blank.

   

nil

     

6d

Area: Developing the Capacity of Human Resources

Issue: Developing HR professionals

IRMP 200

Functional MTPs

(CPA)

People Management Objectives

Lead

People Management Priorities

Performance Indicators

National Benchmarking Data/Reports

Direct Financial Resources

Gap Analysis Reference and Supporting

     

2005/2006

2006/2007

2007/2008

   

2005/2006

2006/2007

2007/2008

Information

MR1 MR2

MTP:

HR: 4.1.3

CPA: 54

(i) By March 2008 to have the right people management structures in place to support performance improvement

Head of HR

By March 2006 to identify levels of qualifications for HR professionals and feed employee requirements into Training Plan

By July 2006 to have undertaken HR function review based on outcomes to deliver people strategy and implement interim structures including HR roles and responsibilities across the service

By March 2007 to deliver identified development programmes for HR professionals

By March 2008 development requirements of HR function delivered to Training

Requirements for HR professional qualifications and training courses identified and fed into Training programme by July each year

National Framework Document

nil

     

JMcN/PeopleStrategy/ v7.17.11.05

Groups/Sec/WP/Word/Corporate/HFRA HFRA HR 29 11 05 Action Plan Appx 3 JMC/18/11/2005