Archived decisions
Hampshire County Council Rushmoor Highway and Transport Advisory Panel 17 March 2006 Passenger Transport Report Report of the Director of Environment |
Item 12 |
Contact: Andrew Wilson, ext 6389 email: [email protected]
1. Summary
1.1 This report provides details of the latest position on concessionary fares, bus services, bus infrastructure improvements, Community Transport and rail issues.
2. Concessionary Fares
Free Bus Travel for Senior Citizens and Disabled People from 1 April 2006
2.1 Over 70% of the bus mileage in Hampshire is operated commercially, with routes, timetables and fares determined by the operator concerned. On subsidised services, fares charged are generally in line with those on commercial services. Most bus operators give free travel to children under five, and charge half-fare to children over 5 but under 16. Few discounts are offered commercially to senior citizens or disabled people.
2.2 Currently, legislation requires the district councils in England to offer a half-fare bus pass for travel within their district, at all times on Saturday and Sunday, and between 09.30-23.00 on Monday to Friday, to residents over 60 or who are disabled. Eligibility is determined, and passes are issued, by each district.
2.3 All the Hampshire districts, and Portsmouth City Council, participate in the Hampshire Farepass scheme, administered by consultants MCL, retained by the County Council on behalf of the districts. This offers a more generous concession, with no time restriction and allowing travel as far as the bus goes, provided that the passenger either boards or alights in Hampshire. For example, a Lymington resident with a Farepass issued by New Forest District Council, can travel to Bournemouth, or by bus from Lymington to Southampton, then from Southampton to Portsmouth, then from Portsmouth to Chichester, and return. Half-fare applies to ordinary single or return tickets.
2.4 All the Hampshire districts except Havant currently offer an alternative to the half-fare bus pass, in the form of tokens, to an annual value per holder ranging from £24 to £70. These are accepted by taxis and private hire cars, buses (for full adult fares, not half-fares), most community transport and for railcards (Senior Citizens' or Disabled). Some districts offer a railcard themselves, as an alternative. In all districts, over 50% of people eligible for a half-fare bus pass waive this right and take tokens instead.
2.5 From 1 April 2006, legislation requires that half-fare travel for pass holders is replaced by free travel, within the same limits of time and geography (ie within district) as detailed above. The Government is providing additional funding for districts, on a formula basis. However, the formula does not reflect the varied provision of bus services within districts.
2.6 In an urban district, with a dense network of frequent bus services, far more additional journeys will be made when travel becomes free than in a thinly-populated rural district with infrequent bus services and longer distances to travel to shops, etc. In Hampshire, MCL have estimated that the additional funding will be insufficient to meet the additional costs of unlimited free travel for Fareham Borough Council (by over £400,000 per year) and Winchester City Council (by over £100,000 per year).
2.7 Fareham Borough Council has therefore decided to opt out of the county-wide Farepass scheme, in order to reduce their deficit on the new scheme. Their passholders will receive free travel within the district and pay half-fare for journeys outside the district (subject to negotiation).
2.8 All the other districts, and Portsmouth, will remain in the Farepass scheme, but Winchester residents' passes will not allow free travel on Mondays to Fridays between midnight and 09.00; Havant's passes will not be valid between 04.00 and 09.00 on Mondays to Fridays. A summary of the new schemes is attached, including the varying provision of tokens; several districts are restricting or withdrawing tokens from 1 April.
2.9 Negotiations are now taking place with the bus operators on the level of reimbursement for free travel. Legislation requires that the operators should be no better and no worse off as a result of participating in a concessionary travel scheme.
2.10 Thus there is no automatic recompense for carrying more passengers, unless additional capacity is required. Operators are understandably concerned that pass-holders may fill a bus and deny seats to fare-payers at subsequent stops. Whilst additional costs incurred in providing additional capacity may be claimed from the scheme, it will be difficult to forecast where and when more capacity will be needed. For example, a journey which is only quarter-full on a wet day in winter may be oversubscribed on a fine day in June.
2.11 Summary of Concessionary Fares Schemes in Hampshire from 1 April 2006
New Forest |
No Restriction |
County-wide * |
Vouchers for people 60+ AND receiving housing benefit /council tax benefit/pension credit OR disabled. |
Rushmoor |
No Restriction |
County-wide * |
£46.50 tokens for people 75+. £51.50 tokens for disabled (any age). |
Test Valley |
No Restriction |
County-wide * |
£40 vouchers for disabled people who are on a means-tested benefit. |
Winchester |
Not available Midnight-0900 on Mon to Fri |
County-wide * |
Ceasing issuing tokens from 1 April 2006. |
Unitary Authority Portsmouth Southampton |
Not available before 0900 on Mon to Fri Not available Midnight-0900 on Mon to Fri |
County-wide* City only, plus Totton, Airport and Moorgreen Hospital |
* County-wide includes any journeys which either start or finish in Hampshire
3. Bus Services Update
Local Bus Service Support - Action in 2005/06
3.1 No services in Rushmoor Borough were affected by the service changes made in October 2005.
New Approach to Service Provision
3.2 Following the pilot work in Basingstoke and Alton, comprehensive district-based reviews have commenced of public and community transport expenditure. The first of these cover New Forest and Hart. Rushmoor will follow in due course. Outcomes and a suggested way forward to enable services to remain affordable within the current level of budget provision over future years will be reported to the Environment Policy Review Committee.
Department for Transport Kickstart Fund 2005
3.3 Transport authorities in partnership with bus operators are invited to compete for funding which is meant to `kickstart' services by providing improvements to vehicles and frequencies. The County Council in partnership with Stagecoach submitted a bid to increase the frequency of Route 3 from every 30 minutes to every 15 minutes over the section of its route between Yateley and Camberley. A fleet of brand new low-floor buses will be provided. This bid has been successful and the improved service should be launched from 3 April 2006. This service enhancement will be an excellent progression within the Blackwater Valley Quality Bus Partnership.
3.4 Surrey County Council, in partnership with Stagecoach, submitted a bid to increase the daytime frequency of Route 4/5 (North Town/Aldershot-Farnham). A fleet of brand new low-floor mini-buses would be provided. This bid has been successful and the improved service is expected - to be launched from 12 June 2006.
4. Blackwater Valley Quality Bus Partnership
4.1 Three schemes for infrastructure and information improvements under the umbrella Blackwater Valley Quality Bus Partnership are being progressed in Rushmoor.
4.2 Work was completed in August 2005 on bus stop infrastructure improvements on Route 6 between Farnborough town centre and Prospect Estate. The £100,000 scheme was funded through the Local Transport Plan. Works included raised kerbs to ease access to buses, bus stop clearways and new bus stop poles with integrated information displays. New shelters are awaiting installation at a number of stops. The new `Yo-Yo' ten minute service with low-floor easy access midi-buses was launched on 24 November 2005.
4.3 Phase 2 of the project, at a further cost of £100,000 and funded through the Local Transport Plan, is scheduled to start in spring 2006 and will provide for the installation of Real-Time Passenger Information (RTPI) along the route and further new shelters. (As noted in report on Other Highway Related Programmes.) These works complement the investment of £250,000 by bus operator Stagecoach in three new, low-floor midi-buses and the frequency increase from 15 to 10 minutes referred to above.
4.4 RTPI is now awaiting installation on Route 1, Aldershot, Farnborough, Camberley, as the latest stage in the £470,000 investment in this route (£252,000 funded through the Local Transport Plan and £218,000 externally funded).
5. A325 Farnborough Road Improvement - Appraisal Report
(see Appendix)
6. Community Transport
6.1 Community transport schemes play an important role in meeting locally the transport needs of organisations and individuals which cannot be easily met through the existing conventional bus network.
6.2 Funding has been provided to replace a number of the minibuses operated by Rushmoor Voluntary Services. The vehicles are being funded through the Local Transport Plan Capital programme and form part of the County Council's overall approach for supporting and developing community transport schemes in Hampshire.
6.3 Mini-buses like the ones operated by Rushmoor Voluntary Services offer older people, disabled people and even younger people the opportunity to access a range of services and facilities within their local community.
6.4 The Rushmoor and Hart Dial-A-Ride service has since the beginning of October 2005 only been serving the borough of Rushmoor. This change took place following the withdrawal of funding from Hart District Council for the service because of the duplication between the dial-a-ride service and the Hart Call and Go and the level of usage from Hart residents on the dial-a-ride service. An interim funding arrangement was put in place to enable the service to continue operating in Rushmoor without any service reduction until March 2006. A new funding arrangement for 2006/07 is currently in the process of being agreed.
7. Rail Update
7.1 Greater Western Franchise. First Group plc has recently been appointed as franchise holder for the Greater Western Franchise for ten years from 1 April 2006. Hampshire's interest is in the Portsmouth/Brighton to Cardiff, Basingstoke to Reading, and Reading to Gatwick services. The franchise is subject to review after the seventh year.
7.2 The South Western Franchise is the key franchise for Hampshire's rail services. A new ten year franchise starts in February 2007, subject to review after the seventh year. The new franchise combines two existing franchises - South West Trains (SWT) and Island Line.
7.3 Stakeholder consultation has been completed. A copy of the County Council's full response is available from the Passenger Transport Group on 01962 845492 and on the web at:
/decisions/decisions-docs/060118-exmshr-R0112093833.
7.4 An Invitation to Tender will be issued by the Department for Transport (DfT) in March 2006 to the five short-listed companies who have pre-qualified. Bidders then have 90 days in which to submit their bids. The bidders are:
· Arriva Trains South West Limited (Arriva plc);
· First South Western Limited (First Group plc);
· Great South Western Railway Company Limited (a joint venture between GNER holdings and MTR Corporation Limited of Hong Kong);
· Trafalgar Trains Limited (National Express Group plc); and
· Stagecoach South Western Trains Limited (Stagecoach Group plc) - (the incumbent).
7.5 The decision on the successful franchisee by DfT is expected in autumn 2006.
7.6 In parallel with the franchise process, Network Rail is preparing capacity assessments of the rail network on a route by route basis, to determine the optimum utilisation level for the existing infrastructure and to consider where investment to improve capacity could most advantageously be applied. These assessments are known as Route Utilisation Strategies (RUS), and that for the South Western Main Line has recently been consulted on. Once input from consultees has been evaluated, a definitive version will be published by the Office for Rail Regulation (ORR). A copy of the County Council's response is available from the Passenger Transport Group on 01962 845492.
7.7 The key points which the County Council made in its responses to these two consultations were:
(i) opposition to a proposal to truncate the Romsey - Totton via Chandler's Ford service at Eastleigh;
(ii) desire to retain a Basingstoke to Brighton through service;
(iii) support for increasing clearances on the routes between Southampton Docks and the Midlands to enable taller containers to be carried on standard height wagons;
(iv) support for the examination of radical solutions such as double-deck trains in order to address growth predictions;
(v) need for a half-hourly frequency of stopping services between Portsmouth and Southampton off-peak; and
(vi) support for timetable accelerations, especially on the Alton line.
Station Improvements
7.8 It is envisaged the annual match-funded rolling programme agreed between the County Council and train operators will continue whichever company secures the South Western franchise, which encompasses the vast majority of stations in the county.
7.9 New vandal-proof waiting shelters will be provided in 2006/07 at Portchester, Bedhampton and Warblington. The programme of cycle storage provision (hoops and lockers) at stations will be continued where unsatisfied demand is identified.
7.10 `Welcome Boards' branded with the County Council logo and listing the facilities available at each station, together with local maps and Helpline numbers, are being installed at all stations. The programme for SWT stations is now complete. Stations on the future GW franchise and on Southern Railway will be so equipped by the end of 2006. These comprise Dean, Dunbridge, Romsey, Bramley, Farnborough North, Blackwater, Warblington and Emsworth.
Station Car Parks
7.11 In its response to the South West franchise consultation the County Council expressed the view that the issue of increasing car park capacity on a selective basis must be seriously addressed if there is to be any capacity provided to cater for off-peak travel and expressed its willingness to work with Network Rail and franchisees to this end. At the same time it considered that franchisees could be required to implement such measures as car-sharing incentives.
Bus/Rail Integration
7.12 In its response to the franchise consultation, the County Council stressed the importance of developing further bus/rail links and suggested that a requirement be placed on bidders to make proposals for dedicated bus/rail links at particular stations which should be funded within the franchise.
Carriage of Cycles
7.13 SWT introduced its new Cycle Policy in October 2004 aimed at creating a better balance between the needs of peak hour passengers and cycle users. On the whole, less cycle-related problems have been referred to the Rail Officer, as the policy has been implemented and understood by cyclists. The use of a different colour in the timetable to denote trains with cycle restrictions has been useful.
Eurostar beyond 2007
7.14 When Stage Two of the new Channel Tunnel Rail Link, from the Medway area to London St Pancras, is complete in 2007 Eurostar will concentrate all their services on St Pancras and withdraw completely from Waterloo International. There are operational advantages to the company in doing so, as without the need to serve Waterloo, the third rail electric equipment on the Eurostar trains can be removed.
7.15 This means that passengers from Hampshire and the rest of Waterloo's catchment area will be considerably inconvenienced by having to cross London on already congested Underground services to join Eurostar trains at St Pancras, or else travel from Waterloo East to Ashford International to connect there - a double change is required, compared with walking from one side of Waterloo station to the other.
7.16 The County Council had previously voiced its concern to the Strategic Rail Authority about the threat to Waterloo services posed by the move to St Pancras and asked that a residual service to Waterloo be maintained after 2007. However, Eurostar is not franchised in the same way as other train operators and the SRA was unable to influence the decision in Hampshire's favour.
7.17 A recent study commissioned by the DfT has recommended that the Eurostar platforms be retained for alternative rail use rather than sold off as a commercial development. Further studies will determine the most beneficial solution, which could involve transferring Windsor line services to the former international platforms, thereby freeing up other parts of the station, or using them for main line services (which could directly benefit Hampshire) or by treating them as an overspill to the South Eastern lines towards Kent. There are also thoughts of remodelling Waterloo itself to create additional track capacity, possibly involving longer platforms able to deal with longer trains.
8. Impact Assessments
8.1 This report provides a position statement only, therefore an impact assessment in terms of the Race Relations (Amendment) Act has not been undertaken.
Recommendation
That this report be noted.
Section 100 D - Local Government Act 1972 - background papers | |
The following documents disclose facts or matters on which this report, or an important part of it, is based and has been relied upon to a material extent in the preparation of this report. | |
NB the list excludes: | |
1. |
Published works. |
2. |
Documents which disclose exempt or confidential information as defined in the Act. |
TITLE |
LOCATION |
None. |
823/AW