1.1 This report covers the main programmes of traffic management work completed and ongoing in the borough during 2005/06 under the following headings:
(i) Traffic Regulation Orders and Road Safety Schemes;
(ii) Decriminalised Parking Enforcement;
(iii) Cycleways; and
(iv) Liveability Schemes.
2. Traffic Regulation Orders and Road Safety Schemes
2.1 The Borough Council receives numerous requests from the public for traffic management measures and priority is given to those where road safety is an issue. Priority is also given to those Traffic Regulation Orders that are required to facilitate development. Schemes also transpire as a result of monthly `Casualty Reduction Partnership' meetings that take place with the County Council's Safety Engineering Group and the Police to discuss matters relating to the fatal and life threatening accidents that occur on the borough's roads.
2.2 The list of schemes completed or in progress in the 2005/06 capital programme is shown in Appendix 1.
3. Decriminalised Parking Enforcement
3.1 Decriminalised Parking Enforcement (DPE) has been introduced successfully in 8 of the 11 districts in the county so far, with a further one proposed for October 2006. In these districts, both the District and County Councils are members of the National Parking Adjudication Service (NPAS) Joint Committee. This is the national body, based in Manchester, established under the relevant legislation to provide an independent adjudication service for drivers or vehicles owners wishing to appeal against a penalty charge notice. The county representative, Councillor Phrynette Dickens, is the Assistant Chairman of the NPAS Joint Committee.
3.2 Regulations have recently been made which will enable local authorities operating DPE to introduce camera enforcement of bus lanes under the Transport Act 2000. These will be superseded in due course by regulations under the Traffic Management Act when provisions for civil enforcement outside London come into effect, although this is not expected to be until at least 2007. They will include not only parking and bus lane enforcement, but also some other moving offences such as banned turns, no entry and yellow box markings. These changes will be kept under review and consideration will be given to the need to take up further powers at the appropriate time as felt necessary.
3.3 In Havant, the improved enforcement has resulted in representations, particularly from Emsworth residents and traders, to extend the 30 minute limited on-street waiting in central Emsworth and to introduce a residents' parking scheme. As a result, the 30 minute limited waiting will be extended to 45 minutes with effect from 1 April 2006 and an experimental residents' parking scheme will be introduced from the same date.
4. Cycleways
4.1 Information as to the progress being made with the various cycleway schemes is set out in Appendix 2.
5. Liveability Schemes
5.1 Havant Borough Council is a pilot authority for the transformation of services in connection with public open spaces and has been awarded £3.3m to be spent on capital schemes that enhance selected public spaces.
5.2 Many of the schemes involve improvements to the highway and will be subject to a Section 278 Agreement, which is still to be finalised.
5.3 The highway related schemes are as follows:
(i) London Road Precinct, Waterlooville
This scheme includes improvements to paving and the provision of street furniture, lighting, trees and gateway features to the northern section of the existing London Road Precinct.
(ii) Leigh Park Parking Pilot
Schemes piloting different solutions to the residential parking problems are to be carried out at Kingsworthy Road and Iping Avenue.
(iii) West Street, Havant
This scheme includes the provision of seating, lighting and York stone paving in the section of West Street outside St Faith's church.
(iv) Eastoke Corner, Hayling Island
This scheme includes the provision of a pedestrian plaza and viewing platform linking shop frontages to the seafront, with revisions to the highway and parking spaces.
(v) Langstone
This scheme includes an extension of the bridge lighting, an improved pedestrian refuge at Langstone, a small car park and tree planting to the south of the bridge.
(vi) Emsworth
This scheme includes improvements to the A259 subway (mirrors, anti-slip surfaces, handrails and artwork), an improved crossing refuge south of the A259/North Street roundabout, improvements to the roundabout, replacement railings and enhancement of the A259 lighting.
(vii) Milton Road, Cowplain
This scheme includes improved parking, new trees and street furniture, a mini roundabout, road narrowing, rumble strips and new surfacing on that section of Milton Road between the Eagle Avenue and Lovedean Lane junctions.
(viii) Signage
New Borough boundary and neighbourhood signs have been designed and will be erected at appropriate locations within the Borough in order to improve consistency of signage and a sense of place.
5.4 The various schemes are expected to be completed in Spring and Summer 2006.
6. Impact Assessments
6.1 This report provides a position statement only therefore an impact assessment in terms of the Race Relations (Amendment) Act has not been undertaken.
Recommendation
That this report be noted.
Section 100 D - Local Government Act 1972 - background papers | |
The following documents disclose facts or matters on which this report, or an important part of it, is based and has been relied upon to a material extent in the preparation of this report. | |
NB the list excludes: | |
1. |
Published works. |
2. |
Documents which disclose exempt or confidential information as defined in the Act. |
TITLE |
LOCATION |
None |
9338/AN
APPENDIX 1
HAVANT TRAFFIC MANAGEMENT PROGRAMME 2005/06
LOCATION |
ACTION BY |
TYPE |
PROGRESS |
TRAFFIC REGULATION ORDERS |
|||
EMSWORTH Town Centre |
HBC |
Limited waiting changes |
Advertised 5/12/05 - 3/1/06; to come into force on 3/4/06 |
EMSWORTH, Town Centre |
HBC |
Restriction of waiting & loading |
Order came into force on 2/12/05 |
HAVANT, Blenheim Gardens |
HBC |
Restriction of waiting |
Held in abeyance as unable to achieve consensus among residents |
LEIGH PARK, Barncroft Way |
HBC |
No waiting/No stopping |
Works to be ordered |
HAVANT, North Way |
HBC |
Restriction of waiting |
Held in abeyance as unable to achieve consensus among residents; further discussions to be held with residents |
HAVANT, Elm Park Road |
HBC |
Restriction of waiting |
Order came into force on 4/12/05 |
PURBROOK, Alsford Road, Aldermoor Road East and Kentidge Road |
HBC |
Restriction of waiting |
Order came into force on 31/5/05; review of impact of new restrictions being undertaken |
HAVANT, Southmoor Lane |
HBC |
Restriction of waiting & height restriction |
Advertised 1/8/05 - 30/8/05; Order to be made |
HAVANT, Swanmore Road |
HBC |
Restriction of waiting |
Scheme prepared; to be advertised for public comment |
WATERLOOVILLE, (rear of Wellington Way) |
HBC |
Loading bay |
Scheme prepared; to be advertised for public comment |
HAVANT, Oaklands Road & Pine Grove |
HBC |
Restriction of waiting |
Draft scheme prepared & informal discussions taking place with Neighbourhood Watch Co-ordinator |
BEDHAMPTON, Park Lane |
HBC |
Restriction of waiting |
Advertised 4/11/05 - 6/12/05; no objections; Order to be made |
WATERLOOVILLE TOWN CENTRE REVIEW |
HBC |
Restriction of waiting |
Representations received now analysed & to be discussed with the Ward Members & Portfolio holder |
WATERLOOVILLE, Stakes Hill Road |
HBC |
Restriction of waiting |
Scheme prepared; to be advertised for public comment |
COWPLAIN, Hart Plain Avenue |
HBC |
Restriction of waiting |
Scheme prepared; to be advertised for public comment |
HAVANT, Chilcombe Close |
HBC |
Restriction of waiting |
Scheme to be prepared |
HAVANT, South Street |
HBC |
Restriction of waiting |
Scheme to be prepared |
WATERLOOVILLE, Mill Road |
HBC |
Restriction of waiting |
Scheme prepared; to be advertised for public comment |
HAYLING ISLAND, Church Road |
HBC |
Restriction of waiting |
Scheme to be prepared |
HAYLING ISLAND, Brights Lane |
HBC |
Restriction of waiting |
Scheme to be prepared |
CROSS-CUTTING SCHEMES |
|||
WATERLOOVILLE, Town Centre Bus Priority Scheme |
HCC/HBC |
Signing and Traffic Regulation Order preparation |
Scheme preparation commenced |
HAVANT BUS STATION (Market Parade) |
HBC |
Restriction of waiting, loading and speed limit |
Order came into operation on 31/7/05 & buses are now temporarily relocated in Market Parade & North Street |
LIVEABILITY |
HBC |
Borough boundary and district signs |
Signs designed; exhibition commenced 12/9/05; design agreed; works to be ordered |
EMSWORTH TOWN CENTRE |
HBC |
Experimental Residents' Parking Order |
Scheme to come into force on 3/4/06 |
HAVANT BUS STATION |
HBC |
20 mph speed limit, loading/unloading |
Scheme to be prepared |
ROAD SAFETY ENGINEERING SCHEMES |
|||
EMSWORTH, New Brighton Road (phase 2) |
HBC |
Improvement to road signs |
Additional signage now erected following a recent personal injury accident |
WATERLOOVILLE (Hulbert Road) |
HBC |
Improvement to road signs |
Additional signage to be erected following a recent personal injury accident |
EXTERNALLY FUNDED SCHEMES |
|||
WATERLOOVILLE, Aston Road |
HBC |
Road closure |
Discussions being held with the developer to bring the scheme into operation on 15/3/06 |
HAVANT, Nest Business Park, Martin Road |
HBC |
Weight restriction Order |
Design required |
HAVANT, Community Hospital, Lavant Drive & Leigh Road. |
HBC |
Road closure & waiting restrictions |
Waiting restriction came into force on 23/3/05; closure deferred pending receipt of planning application for hospital site |
HAVANT, (Hargreaves Site) Selborne Road & Brockhampton Lane |
HBC |
Road closure & waiting restrictions |
Awaiting contact from developer for agreement to proceed |
HAVANT, Bulbeck Road |
HBC |
Extension to one-way system |
Advertised 1/8/05 - 30/8/05; scheme to be implemented shortly |
HAVANT, Beechworth Road |
HBC |
Restriction of waiting |
Awaiting contact from developer for agreement to proceed |
BEDHAMPTON, Bedhampton Hill |
HBC |
Restriction of waiting |
Scheme prepared. To be advertised for public comment. |
TEMPORARY TRAFFIC REGULATION ORDERS - since 1 April 2005, 30 temporary road closures have been processed; 22 by Notice and 8 by Order.
APPENDIX 2
HAVANT CYCLEWAYS
LOCATION |
PROGRESS |
Hayling Billy Trail (Havant Railway Station) |
Works to continue the trail from the centre of South West Trains car park to the station forecourt, including cycle storage and motor cycle storage, are expected to start in February 2006. |
A259 (Emsworth, Havant Road) |
Feasibility study is being carried out by the County Council to assess the possible completion of the cycleway to Emsworth town centre as part of the Emsworth accessibility programme. |
Southleigh Road |
Works to the section from Rowan Road to Emsworth Road have been completed. The section between Eastleigh Road and Rowan Road is currently being designed. |
Southleigh Road to Bellevue Lane |
This scheme forms part of the school travel plan. The scheme has been designed and is awaiting safety audit. |
Horndean Road to Emsworth Primary School |
This scheme is part of the school travel plan and a feasibility study is being carried out. |
Harts Farm Way |
Ground survey to be carried out in March 2006. |