Hampshire County Council Executive Member - Policy and Resources Item 31 October 2006 Merton Rise, Basingstoke - Chineham Lane Local Park: Project Appraisal
Report by the Director of Property, Business and Regulatory Services
|
Contact: Louise Hague Ext: 6578 e-mail: [email protected]
LINK(S) TO CORPORATE STRATEGY | ||
Yes |
No | |
Hampshire safer and more secure for all |
_ | |
Maximising well-being |
_ |
|
Enhancing our quality of place |
_ |
|
This proposal does not link to the Corporate Strategy but, nevertheless, requires a decision because: N/A |
Section 100 D - Local Government Act 1972 - background papers
The following documents disclose facts or matters on which this report, or an important part of it, is based and has been relied upon to a material extent in the preparation of this report.
NB the list excludes:
1 Published works
2 Documents which disclose exempt or confidential information as defined in the Act.
Plans showing location, general layout and detail of proposed play equipment attached.
EM238D06 LEH/24-Oct-06
Hampshire County Council Draft
Park Design Project Appraisal |
Executive Member - Policy and Resources
31 October 2006
Project: |
Merton Rise Phase 1, Basingstoke - Chineham Lane Local Park | |
Implementation and procurement of key area of open space | ||
Commencement date: |
April 2007 | |
Completion date: |
November 2007 | |
Planned year of start in accordance with Capital Programme: |
2007/08 | |
Recommendation:
That the procurement and implementation of the above project be approved.
1 Finance
Capital Expenditure |
Current Estimate £'000 |
Capital Programme £'000 |
Works |
255 |
_ |
Fees |
23 |
_ |
Land to be purchased |
_ |
_ |
Total |
278 |
* The means by which the difference between the Current Estimate and the Capital Programme
allocation is to be met is shown in the table below.
Financial Provision for Total Scheme |
Works £'000 |
Fees £'000 |
Total cost £'000 |
1 From own Resources: |
|||
a) Merton Rise Infrastructure Fund and other consultancy budgets(fees) |
- |
23 |
23 |
2 From Other Resources: |
|||
a) Developers Contribution (07/08) |
300 |
- |
300 |
Total |
300 |
23 |
323 |
Building Cost - Net Cost = £ per m2 N/A
- Gross Cost = £ per m2 N/A
Devolved Capital allocations £'000
2004/05 N/A
2005/06 N/A
2006/07 N/A
2007/08 N/A
Total N/A
Landowner funded work connected with this scheme
An allocation has been made in the Merton Rise Infrastructure Works budget towards the small-scale enabling earthworks required between January and March 2007 (c. £20,000) and to also cover the design and supervision fees for these works.
Value of land already acquired for this project
The land required for the project forms part of the County Council owned Merton Rise site. The land was acquired at historic cost as part of the County Farms Estate and its current value to the County Council is as part of the wider Merton Rise development area.
Revenue implications
(a) Employees £'000 |
(b) Other £'000 |
(a+b) *Net Current Expenditure £'000 |
(c) Capital Charges £'000 |
(a+b+c) Total Net Expenditure £'000 | |
Revenue Implications Additional+ /Reductions |
- |
- |
- |
- |
- |
Unit cost (£) (e.g. per place) |
- |
- |
- |
- |
- |
% variation to Committee's budget |
- |
- |
- |
- |
- |
Number of additional Staff (fte) |
- |
- |
- |
- |
- |
For Basingstoke & Deane Borough Council to take forward the future management of the Park, a commuted payment "dowry" of £42,000 has been accounted for within the developers' payment.
Energy costs
N/A
2 Details of site and existing infrastructure
Chineham Lane Local Park will provide the primary area of open space within Planning Phase 1 of the Merton Rise development and will also provide ancillary access to open space for parts of the adjoining Phase 2 land also. The Park will have a prominent position, adjacent to the Spine Road at the corner of the redirected Chineham Lane as it converges with the new Spine Road. It will sit between the two sub-parcels within Phase 1, parcels 1a and 1b and therefore performs an important role providing a focus for the two developments.
The Park is served by a pedestrian/cycle link along the southern boundary, connecting through from Chineham Lane to the new Everest Community College to the north and along the eastern boundary by a footpath linking Chineham Lane through parcels 1b, into the phase 2 land adjoining.
The total site area for the Park is 1.26 acres (0.51 hectares).
Access
In the short term , vehicular maintenance access will be from the Spine Road although in the long term grounds maintenance will undertaken using other access roads to be provided by the developer of parcel 1b.
Existing buildings and temporary buildings
The site is currently bare, formerly part of Greatfield Farm
Results of trial boreholes
The ground is predominantly chalk with good natural soakage. The cut and fill exercise will expose the chalk which could result in surplus arisings but it is hoped that the overall scheme will be arising neutral. with no need to landfill off site any surplus material.
It should be noted that a SUD's blanket feature and associated pipework is to be located underneath the Park.
Mains services position
Street lighting is to be provided to the park for additional security.
3 Scope of the Project
Type of project, layout and facilities provided
The project is to provide the following:
· Kickabout area
· Fenced equipped play area
· Street furniture (seating, bins, signage)
· Public art
· Soft landscaping
· Safe pedestrian/cycle route through to Everest Community College
Places provided
The fenced play area will provide secure equipped, play for children between the ages of 1 - 15 years. The park itself will provide essential open space for the wider community.
4 The Proposed Building
Type of construction, finish and appearance
N/A
Accessible facilities
A full Design and Access Statement is to be provided as part of the reserve matters planning application.
Heating and ventilation systems
N/A
Fire risk assessment
N/A
Health and safety
A designer's risk assessment and a design health and safety plan, in accordance with Regulation 15 of the Construction Design and Management Regulations 1994, have been undertaken for the proposed scheme.
5 External Works
Car parking
No car parking is to be provided as part of this project.
Landscape proposals
A simple and robust soft landscaping design is to be employed for the park to ensure the space is able to stand up to the rigors of public use and to provide ease of maintenance.
A strong framework of street and park trees is to be located around the edge of the park giving presence and enclosure to the space. All trees are to be semi-mature, a minimum of 30 - 35cm girth with 2.4m clear stems, under ground guyed and about 6m high on planting. All tree pits are to have water loops and any tree within 3m of services runs will have root barriers installed. Around the southern boundary of the park a Beech hedge is to be planted to prevent footballs running onto the adjacent road. The hedge is to be reinforced whilst it establishes by a central post & wire fence.
Around the play space, groundcover and shrub planting will supplement the park trees and provide areas of shade for children using the play equipment. All shrub planting will be mulched with 75mm depth of ornamental grade bark mulch.
Situation on site and environmental impact
Following recent European Court rulings, a re-scoped Environmental Impact Assessment will form part of the proposed reserved matters planning application for the project.
6 Planning
Planning consent for the works is to be achieved by way of a Regulation 4 Reserved Matters planning application under the existing outline consent. This is to be submitted at the end of September along with the developers applications for the Merton Rise Phase 1 sub-parcels. The application will be determined by Basingstoke and Deane Borough Council as Local Planning Authority for the site.
7 Site management
There will be a 12 month period between completion of the park and handover to Basingstoke & Deane Borough Council within which the County Council will be responsible for maintenance of the Park. The cost for this management period is accounted for within the project cost.
8 Furniture and equipment
N/A
9 Professional resources
Landscape Architectural Services } Highland Edgar Driver
Supported by } Tibbalds Planning & Urban Design
} HCC's Planning and Urban Designers
10 Consultations
The following have been consulted during the development of the project:
local County Councillor
Basingstoke & Deane Borough Council's Planning and Leisure Services Officers.
There is a key opportunity on the site for artwork which is to be separately consulted on, together with an opportunity for a re-naming exercise of the Park once the adjoining development becomes occupied.