Archived decisions

    Hampshire County Council

    Buildings Land and Procurement Panel

    23 January 2007

    New Deal for Schools Modernisation (Condition) Programmes and
    Funding for 2006/07 and 2007/08

    Report by the Director of Property, Business and Regulatory Services

    1

    Summary

    1.1

    The Department for Education and Skills (DfES) has advised the County Council of an additional tranche of New Deal for Schools (NDS) Modernisation funding for 2007/08. In addition to the two year NDS funding allocation that was reported to the Panel in April 2006. This additional funding will enable further work to reduce the backlog of repairs and maintenance for schools.

    1.2

    The purpose of this report is to :

    · Update Members on the allocation of NDS Condition funding for the 2006/07 and 2007/08 financial years

    · Propose the priorities for the allocation of 2007/08 NDS Condition funding

    · Propose an enhanced level of NDS capital repairs programmes for schools for 2007/08.

    This report also confirms the progress to date on the delivery of the 2006/07 NDS Condition programme.

    1.3

    The use of NDS Condition Fund monies will improve the quality of school buildings in Hampshire maximising the well being of the users of the buildings and enhancing the quality of place.

    2.0

    Allocation and Split of NDS Modernisation (Condition and Suitability) Funding 2007/08

    2.1

    Members will recall from the report in April 2006 that the DfES confirmed the current two years of NDS Modernisation funding in the sum of £23.33 million pounds for 2006/07 and £23.67 million for 2007/08. The DfES has recently announced a further additional tranche of NDS Modernisation funding for Hampshire in 2007/08 of £11.834 million, bringing the total of Modernisation funding for 2007/08 to £35.504 million.

    2.2

    As in previous years the Modernisation funding is allocated to local authorities according to the DfES's assessment of need and, as far as the original allocation of NDS funding is concerned, comes with a specific direction as to how the allocations are to be proportioned across primary and secondary schools. With regard to the additional allocation of NDS funding for 2007/08, the County Council can decide how to invest this in line with its schools' asset management plans. The DfES has, however, asked that authorities give special consideration to the use of this additional funding in two specific areas:

    1. Energy and water saving measures and other sustainability initiatives for schools as a priority, and

    2. School kitchens where there are building needs in relation to the delivery of healthy meals.

    2.3

    The Executive Members for Education and Policy and Resources agreed in July 2003 that the Modernisation funding should be further split between suitability (improvements) and building condition work in the ratio of 46% and 54% respectively. On this basis, table 1 below summarises the amount of Modernisation funding allocated to condition over the next two years and the breakdown between primary and secondary schools.

    2.4

    It can be seen from the table that whilst the total allocation of NDS Condition funding for 2007/08 is £19.175m the Council is in a position of only being able to take up £16.622m. This is as a result of a change in the way the Government provides support for this programme from full grant funding to borrowing approvals. Due to the County Council's position as a "floor" authority the Government's mechanism for funding the associated borrowing costs brings no additional resources in the grant settlement to the County Council. A decision was therefore taken by the Cabinet at the meeting on 24 July 2006 not to take up the full borrowing allocations for 2007/08 for all programmes affected by this change. The additional allocation of £6.392m has been provided as 100% grant and as such is unaffected by this decision.

    Table 1 : NDS Condition Allocations 2006/07 and 2007/08

    Year

    Primary

    £M

    Secondary

    £M

    Total Allocation

    £M

    Allocation take up

    Date to be spent by

    %

    £M

    Original allocation 2006/07

    6.572

    6.028

    12.6

    100

    12.6

    Aug 07

    Total for 2006/07

    £12.6M

    £12.6M

    Original allocation 2007/08

    6.572

    6.211

    12.783

    80

    10.23

    Aug 08

    Additional allocation 2007/08

    6.392

    6.392

    100

    6.392

    Aug 08

    Total for 2007/08

    £19.175M

    £16.622M

    2.5

    It is worth noting that the additional allocation of NDS funding for Hampshire in 2007/08 is once again the highest single award in the country. It is, however, being given as an advance of investment and that future allocations of funding for the period 2008/09 to 2010/11 will be reduced accordingly. The allowable take up of NDS condition funding for 2007/08 equates to around 5.5% of the total backlog of repairs and maintenance at schools. To put this in perspective, the current 5 year backlog of repairs and maintenance for Hampshire schools stands at just over £300 million. Overall, since the introduction of the Schools Asset Management Plan (AMP) in 2000 the County Council has received a total of over £95 Million of NDS funding for addressing the backlog of repairs and maintenance at its schools.

    3.0

    Consideration of Schools AMP Condition Priorities And Sustainability/Climate Change Issues

    3.1

    A comprehensive assessment of the condition liabilities for Hampshire schools was submitted to the DfES in 2000 in the form of a Schools AMP. The AMP is updated annually to reflect work undertaken, inflation and changes in condition resulting from resurveying 20% of the schools' estate each year.

    3.2

    An elemental breakdown of the overall liability is shown in Appendix 1 from which it can be seen that the top 5 areas of AMP concern and, therefore, priorities are:

    1

    external walls and windows;

    2

    mechanical services;

    3

    roofs;

    4

    electrical services; and

    5

    external redecoration.

    3.3

    The above priorities have been agreed with the Schools AMP Forum so there is widespread acceptance by schools that these are the principal areas for investment in terms of the condition of buildings. These areas of priority have, therefore, been used to formulate the proposed Landlord's NDS Condition programme for 2007/08.

    3.4

    It is necessary to give special consideration to the DfES' request for investment in school meals kitchens and energy and water saving measures. The request for investment in kitchens is principally directed at authorities that have building needs in respect of delivering healthy meals, which as far as Hampshire schools are concerned is currently being assessed in conjunction with HC3S. Investment in sustainability matters is given further consideration below.

    3.5

    The DfES has recently published a consultation paper setting out, amongst other things, its aspiration for all schools to be models of energy efficiency and renewable energy, showcasing wind, solar and bio-fuel sources in their communities and maximising their use of rainwater and wastewater resources by 2020. The difficulty with investing the current round of NDS funding in new technologies such as wind and solar power is that it would do little to address the backlog of repairs and maintenance for the schools estate. The Panel will be aware from the Strategy for the Built Estate 2006 report in April of the "maintenance time bomb" effect on the Council's school buildings and the significant challenges in managing the backlog of repairs and maintenance. For this reason it is proposed to invest the whole of the NDS condition funding in tackling the backlog of repairs, but to do so in such a way that makes a positive contribution to the DfES desire for investment to be directed at energy saving measures. Such a strategy will also contribute to the Cabinet's reduction targets for energy and carbon dioxide (CO2) emissions and, in turn, support the Government's national and global agenda on climate change and the reduction of greenhouse gases.

    3.6

    An example of the impact that the NDS programme is having on the climate change agenda can be illustrated by the SCOLA 1A re-cladding programme. To date around 66,000 square meters of SCOLA cladding has been replaced and upgraded with a more thermally efficient window walling system. In theory this is creating the opportunity for energy savings of over 18 m KWh a year and CO2 reductions of around 3,600 tonnes per annum. The 2007/08 condition programme is estimated to generate opportunity for a further annual savings of around 6 million KWh of energy and over 1,700 tonnes of CO2 emissions from the Council's buildings. The realisation of these opportunities for energy and CO2 reductions are of course inextricably linked to the ways in which buildings are used and managed locally. A general trend seems to be pointing towards an increased demand in energy use and therefore CO2 emissions. For example the Annual Sustainability report to the Cabinet in September 2006 showed a 1% increase in CO2 emissions over the previous year. Any energy saving measures therefore need to be balanced against increasing demands for more extensive use of IT facilities and electrical equipment, greater community use of buildings, fluctuations in the size of the estate and the rate of the dilapidation of existing buildings.

    4.0

    Project Selection And NDS Capital Programme For 2007/08

    4.1

    Over the last 6 years the Panel has supported a strategic use of NDS funding in a bid to move away from patch and mend repairs towards a more planned approach for capital investment in the built estate. The proposed programme of work outlined in this report is based on this approach, the benefits of which include:

    ·

    reduced risks and improved health and safety performance of buildings;

    ·

    long term reduction in the backlog of repairs. (The strategy report to the Panel in April 2006 refers.);

    ·

    improved efficiency and running costs, ie energy performance of buildings and fewer breakdowns;

    ·

    reducing the impact of greenhouse gases on the environment and supporting the Government's climate change agenda by creating opportunities for reduced energy consumption and carbon dioxide emissions (supporting the Cabinet's sustainability targets);

    ·

    over time, a reduction in recurring maintenance needs, ie reduced demand for external redecoration and improved servicing of engineering plant;

    ·

    improving the quality of the built environment for generations to come and enhancing the public standing of the County Council in the Community.

    4.2

    Table 2 below summarises that scope of the NDS 2007/08 programme as well as providing an indicative estimate of energy and CO2 savings for each of the main priority areas of investment.

    Table 2: Summary Of Proposed NDS Condition Expenditure And Indicative Energy Saving And CO2 Emission Reductions For 2007/08

      Priority Category of Work

      Proposed Expenditure £,000

      % Value of Programme

      Number of Schools benefiting from the Programme

    Sustainability

      Indicative Energy Saving KWh

      Indicative CO2 Reduction Tonnes

    1.External Walls and Windows (SCOLA re-cladding and window replacements)

    3,549

    25.12

    10

    3.3 M

    545

    2.Mechanical Services (Boiler systems, heating and systems and underground mains)

    2,577

    17.80

    29

    2.4 M

    1,104

    3.Roofs

    2,040

    14.10

    9

    0.16 M

    33

    4.Electrical Services (Light, power, fire alarms and mains distribution)

    1,302

    9.00

    46

    0.1 M

    41

    5.External Decorations

    1,495

    10.30

    30

    6.Other Internal and External Works (Fire precautions and ceilings)* and paving

    1,480

    10.20

    43

    7.Contributions to Capital Scheme

    300

    2.10

    tba

    8.Miscellaneous (Kitchens, swimming pool strategy contingency and carry forward from NDS 2006/07)

    1,746

    12

    Totals

    14.489

    100

    5.96 M

    1,723

    * linked with electrical lighting renewals

    The individual schemes of NDS work for 2007/08 are scheduled in Appendix 2.

    4.3

    Hook Infant and Junior Schools

    4.3.1

    Within the NDS programme this year is a major scheme of roofing work planned at Hook Junior and Infant Schools. Following recent survey work of the roof structure it has been found that major elements of the structure are at the end of their design life requiring early replacement and repairs of some of the principle structural components including patent glazing, vertical glazing and the composite roof panels. Replacement of the roofing elements will require full compliance with the New Part L (Conservation of Fuel and Power) of the Building Regulations, which will add to the cost of the work.

    4.3.2

    The scope of the works at Hook will include replacement of the existing patent glazing, replacement of the sheet roofing with low pitch roof cladding system, Brise Soleil translucent sheeting to be replaced and flat roof covering replaced.

    4.3.3

    It is proposed to allocate £1.4m from the NDS Condition budgets for 2006/07 and 2007/08 for the proposed replacement and repairs to the roof structures of the infant and junior schools.

    Due to the nature of the works a planning application will not be required. Subject to the necessary approvals it is anticipated that the phased period of works will be as follows:

    ·

    Christmas period 2006:

    Initial survey

    ·

    Easter holidays 2007:

    Trial section of patent glazing

    ·

    June 2007:

    Erection of scaffolding/site preparation

    ·

    July 2007:

    Commencement of building works

    ·

    September 2007:

    Completion of building works

    ·

    October 2007:

    Scaffolding removal/site clearance

    4.3.4

    It is proposed that Mansells be appointed as the framework contractor for the works and the cost of the work be developed as a negotiated tender. Mansells have had early involvement with the feasibility and completed detailed investigation work during the summer of 2006.

    4.4

    External Decorations and Repairs

    4.4.1

    It is proposed to undertake the NDS funded element of this programme in line with previous years, by negotiating 9 packages of work with preferred contractors. This will allow a prompt start in April to maximise the optimum weather conditions for this type of work.

    4.4.2

    The performance of all the contractors who were awarded packages last year has been reviewed. Based on the outcome of this review it is proposed to negotiate the NDS packages of work for 2007/8 with the contractors listed in Appendix 3. As the packages are developed some variance in the list of schemes and values may occur.

    4.4.3

    A programme of additional redecoration schemes to be funded from Landlord's Capital Repairs funds will be developed over the coming months and reported to a future panel meeting. This additional programme will include competitively tendered as well as negotiated packages to provide benchmark costs for the negotiated works.

    5.0

    Progress with NDS Condition Programme for 2006/07

    5.1

    The Executive Member for Policy and Resources approved the NDS Condition Programme for 2006/07 in April 2006. The programme has to be fully completed and bills paid by August 2007. The programme is 33% completed and on track to be fully complete in time to meet the DfES's August deadline.

    5.2.

    Since reporting to the Panel in April 2006 a further urgent scheme has been developed to replace the boiler plant at Oak Meadow School. It is proposed to fund this scheme from the contingency element of the original NDS 2006/07 programme reported to the Panel in April 2006.

    6.0

    Conclusion

    6.1

    Once again the County Council has received one of the highest NDS Modernisation awards in the Country.

    6.2

    The combined effect of the original funding reported to the Panel in April 2006 and the additional allocation of NDS funding for 2007/08 will allow the Panel to recommend to the Executive Member for Policy and Resources an enhance programme of capital repairs for schools.

    6.3

    The DfES have indicated that it intends to claw back the additional funding from future years and overall the funding needs to be seen in the context of the total condition liability for the education estate, which is currently running at over £300m. The total 2007/08 annual NDS Condition allocation represents around 5% of the total liability for the schools estate and is about 4 times short of what it needs to be if the liability is to be eliminated.

    6.4

    The 2007/08 proposed programme will continue with the SCOLA Mark 1 re-cladding programme and bring the re-cladding programme to a position of being about 75% complete.

    6.5

    This year the programme will see over 29 boilers and heating systems being replaced or worked on and the start of a significant investment in replacing obsolete lighting systems and suspended ceilings. Opportunity will be taken to upgrade fire barriers within ceiling voids as part of this initiative.

    6.6

    Major replacement of structural roof components will commence at Hook Junior and Infant Schools as well as a further 8 major capital roofing schemes at other schools.

    6.7

    Overall the NDS programme for 2007/08 will generate a major opportunity for further reduction in energy use and CO2 emissions - supporting the Cabinet's targets for sustainability as well as the Government's national and global climate change agenda. The programme is expected to generate opportunity for 6 million KWh of energy savings and a reduction of over 1,700 tonnes of CO2 emissions per annum. Although the realisation of these savings is very much dependent on the way buildings are used and managed locally.

    7.0

    Recommendations

    7.1

    That the Buildings, Land and Procurement Panel advises the Executive Member of Policy and Resources that approval be given to:

      1. The enhanced programme of NDS Capital repairs for 2007/08 following the confirmation of additional funding from the DfES.

      2. The allocation of NDS Condition fund projects as detailed in Appendix 2.

      3. Completing the major roofing work at Hook Junior and Infant School and to procure the work as a negotiated tender with the framework contractor, Mansells.

      4. Including the boiler replacement work at Oak Meadow School in the NDS Programme for 2006/07.

    LINK(S) TO CORPORATE STRATEGY

    Yes

    No

    Hampshire safer and more secure for all

    _

    Maximising well-being

    _

    Enhancing our quality of place

    _

    This proposal does not link to the Corporate Strategy but, nevertheless, requires a decision because: N/A


    Section 100 D - Local Government Act 1972 - background papers

    The following documents disclose facts or matters on which this report, or an important part of it, is based and has been relied upon to a material extent in the preparation of this report.

      NB the list excludes:

      1 Published works

      2 Documents which disclose exempt or confidential information as defined in the Act

    ........................

    ........................

    Appendix 2

    NDS Condition Programme 2007/08

    Schemes Up to £50,000

    Building

    Stoke Park Infant

    Roof Glazing

    Engineering

    North Waltham Primary

    Replace boiler plant

    Saxonwood Special

    Replace fire alarm

    St James Primary

    HWS Improvement

    Burghclere Primary

    Replace hall heating

    Sunhill Junior

    Replace hall heating

    Freegrounds Infant

    HWS replacement

    Eggars

    Rationalise/replace CWS tanks

    Staunton Park Secondary

    Rationalise/replace CWS tanks

    Wavell

    Rationalise/replace CWS tanks

    Hayling

    Upgrade sub-mains

    Swanmore Home Economics

    Ballard replacement

    Staunton Park Secondary

    Replace HWS generators

    Henry Beaufort

    Rewiring

    External Decorations

    Marchwood Infant

    Lakeside Special

    Oakfield Primary

    Upham Primary

    St Swithuns Wells Primary

    Milford on Sea Primary

    Crookhorn CE (A) Infant

    St Thomas More RC (A) Primary

    Bidbury Junior

    North Baddesley Junior

    Baycroft Special

    Newtown Soberton Primary

    St Lawrence Primary

    St Annes (A) Primary

    St Marks CE Primary

    Southwood Infant

    St Bedes RC (A) Primary - Basingstoke

    Grange Junior - Farnborough

    West Tytherley Primary

    Mill Hill Early Years

    Knightwood Primary

    Micheldever Primary

    Hampshire Microtech and Early Years Centre

    Various Primary Schools

    Window renewals

    Schemes Over £50,000 And Up To £100,000

    Building

    Contributions to capital projects

    North Farnborough Infant

    Roofing

    Courtmoor Secondary

    Redgra pitch

    Brookfield Secondary

    Sports hall re-clad

    Toynbee Secondary

    Redgra pitch

    Contributions to capital projects (SC)

    Noadswood Secondary

    Re-roofing

    Mountbatten Secondary

    Drainage

    Brookfield Secondary

    Roofing

    Engineering

    Wildground Junior

    Re-pipe heating system

    Castle Primary

    Replace boilers/cylinder and gas conversion

    Titchfield Primary

    Replace boilers/cylinder and gas conversion

    Woodcott Primary

    Replace boilers/cylinder and gas conversion

    Hamble Primary

    Replace boilers

    Fair Oak Infant

    Replace boilers

    Winnal Primary

    Rewiring (asbestos present)

    Riders Infant

    Replace boilers

    Padnell Infant

    Replace boilers

    Padnell Junior

    Replace boilers

    Horndean Junior

    Replace boiler

    Baycroft Special

    Replace boilers

    Weeke Primary

    Replace boilers

    Perins Secondary

    Replace boilers and watermains

    Yateley Secondary

    Replace u/g pipework and tanks

    Fernhill Secondary

    Replace boilers and underground mains

    External Decorations

    St Francis Special

    Schemes Over £100,00 And Up To £250,000

    Various Primary Schools

    Fire precautions works

    Bridge Centre

    SCOLA 1 re-clad and roofing

    Oakridge Infant

    Phase 4 re-cladding

    Various Primary Schools

    Replace sewerage treatment plant

    Elson Junior

    Brickwork and roofing repairs

    Marnell Junior

    Underpinning

    Various Primary Schools

    Unplanned major engineering works

    Building

    Various Secondary Schools

    Drainage and paving

    Purbrook Park

    Roofing

    Engineering

    Bedenham Primary

    Replace boilers/cylinder/hw/cw/gas conversion

    Haven Early Years Centre

    Replace boiler and H&C pipework

    T&I remedials

    Cranbourne Secondary

    Boiler room and asbestos removal

    Thornden Secondary

    Replacement boiler plant and controls

    Alderman Quilley Secondary

    Replace boilers and HWS boilers

    Kings Secondary (deferred from 06/07)

    Boilers

    Various Secondary Schools

    Upgrade electric supplies

    Various Secondary Schools

    Unplanned major engineering works

    External Decorations

    Crofton (F) Secondary

    Hayling Secondary

    Brookfield Secondary

    Test Valley Secondary (F)

    Neville Lovett Secondary

    Schemes Over £250,000 and up to £500,000

    Building

    Queens Inclosure

    Roofing and other repairs

    Horndean Infant

    SCOLA re-clad

    Wildground Infant

    SCOLA re-clad

    Various Primary Schools

    Lighting, ceilings and other electrical works

    Icknield Special

    Frogmore Junior

    Cove Infant

    Oakridge Infant

    Oakridge Junior

    Southview Infant

    Rownhams Primary

    Oakley Junior

    Chineham Park Primary

    Potley Hill Primary

    Testbourne

    Contribution to capital scheme - SCOLA and assc electrical

    Various Schools

    Ceilings, lighting and other electrical works

    Hurst

    Replace light fittings

    Aldworth College

    Portsmouth building

    Brighton Hill

    Science, history, drama and tech

    Thornden Secondary

    Switch gear and lighting

    Schemes Over £500,000

    Hook Infant and Junior

    Re-roofing

    Various Primary Schools

    Roofing works

    Yateley

    Re-clad

    Applemore

    SCOLA re-clad

    Cranbourne

    SCOLA re-clad

    Various Schools

    Fire precautions works ceilings, fire barriers, doors and associated electrical works

    Appendix 3

    External Redecorations And Repairs

    Contractor

    Properties

    Atkins

    Marchwood Infant

    Lakeside Special

    Ferris

    Oakfield Primary

    Upham CE Primary

    St Swithun Wells RC Primary

    Milford on Sea CE Primary

    Haylock & Pitman

    Crookham CE Infant

    St Thomas More's RC Primary

    Bidbury Junior

    North Baddesley Junior

    Mitie

    Crofton Secondary

    Baycroft Special

    Newtown Soberton Primary

    St Lawrence Primary

    St Francis Special

    Pools

    St Anne's RC Primary

    St Mark's CE Primary

    Southwood Infant

    St Bede's RC Primary

    Grange Junior (Farnborough)

    West Tytherley Primary

    Purkiss

    The Hayling College

    Mill Hill Early Years Centre

    Richardson's

    Brookfield Community

    Tew Brothers

    Test Valley Secondary

    Knightwood Primary

    Micheldever Primary

    RG Warwick

    Neville Lovett Community Hampshire Microtech and Early Years Centre