Archived decisions

        Adult Services

        Proposals for growth and redeployment 2009/10 to 2011/12

        Proposals are shown at outturn prices for the relevant year.

        Agreed proposals will be incorporated into future year's base budgets and so on-going costs are shown in the first year only. One-off costs are shown in the first year and subtracted from the following year.

         

      Staffing (FTEs)

       

      2009/10

      2010/11

      2011/12

      2009/10

      2010/11

      2011/12

      Link to Corporate Strategy

      £'000

      £'000

      £'000

           
       

      Growth proposals and unavoidable service pressures:

                   
       

      Dependency & Demographic

      9,895

      8,613

      7,353

      19

      9

      8

      c) 1.1

       

      Commissioning/ inflation

      3,354

      478

      478

      -

      -

      -

      c) 2.1

      *

      Transformation Programme

      588

      (1,291)

      146

      9

      (2)

      5

      a) 1.2

       

      Safe and Secure

      652

      (41)

      -

      9

      (1)

      -

      a) 2.10

       

      Other operational pressures

      3,978

      (115)

      (12)

      22

      -

      -

      c) 1.1

       

      Unallocated balance to meet unidentified growth and pressures in future years

      -

      550

      -

             
       

      Total increase

      18,467

      8,194

      7,965

      59

      6

      13

       

      *

      This plus £3.6m funded by Social Care Reform Grant makes the total increase £22m

       

      2009/10

      2010/11

      2011/12

      2009/10

      2010/11

      2011/12

      Link to Corporate Strategy

         

      £'000

      £'000

      £'000

      FTEs

      FTEs

      FTEs

       
       

      Redeployment and savings proposals:

                   
       

      Dependency & Demographic

      (1,500)

      (500)

      -

      -

      -

      -

      c) 1.3

      a) 3.1

       

      Commissioning/ inflation

      (1,528)

      (553)

      (844)

      -

      -

      -

      c) 1.3

      a) 3.1

       

      Transformation Programme

      (1,126)

      (30)

      (60)

      (1)

      -

      -

      c) 1.3

      a) 3.1

       

      Other operational pressures

      (4,145)

      (96)

      -

      (4)

      -

      -

      c) 1.3

      a) 3.1

       

      Efficiencies to be identified

      -

      (3,455)

      (4,461)

           

      c) 1.3

      a) 3.1

       

      Efficiencies subtotal

      (8,299)

      (4,634)

      (5,365)

      (5)

      -

      -

       
       

      Scope to increase income

      (7)

      -

      -

      -

      -

      -

      c) 1.3

      a) 3.1

       

      Scope to reduce services

      (6)

      (15)

      -

      -

      -

      -

      c) 1.3

      a) 3.1

       

      Total redeployment proposals

      (8,312)

      (4,649)

      (5,365)

      (5)

      -

      -

       
       

      Net growth pressures

      10,155

      3,545

      2,600

      54

      6

      13

       
       

      Planned underspend from 2008/09

      (3,455)

      3,455

      -

             
       

      Net growth

      6,700

      7,000

      2,600

      54

      6

      13

       
       

      Guideline additional funding

      6,700

      7,000

      2,600

             

        Children's Services

        1. Proposals for growth and redeployment 2009/10 to 2011/12 - Schools

        Proposals are shown at outturn prices for the relevant year.

        Agreed proposals will be incorporated into future years' base budgets and so on-going costs are shown in the first year only. One-off costs are shown in the first year and subtracted from the following year.

         

      Staffing (FTEs)

       

      2009/10

      2010/11

      2011/12

      2009/10

      2010/11

      2011/12

       

      £000

      £000

      £000

           

      Growth proposals:

                 

      Growth in Delegated Funding

                 

      General Deprivation Funding

      2,043

      4,039

       

      61.0

      112.0

       

      Children Looked After

      100

      -100

             

      English as additional Language / Ethnic Minority

      212

      248

       

      8.0

      8.0

       

      Pay and Benefits in delegated budgets

      1,401

      2,070

             

      ICT for Schools

      1,000

               

      Outreach work for Special

      108

      111

       

      3.0

      3.0

       

      Mainstreaming Autistic Provision

       

      110

         

      2.0

       

      Infant Class Size

      52

               

      Independent Safeguarding

      150

      -150

             

      Sub-total Delegated Growth Proposals

      5,066

      6,328

      -

      72.0

      125.0

      -

      Growth Non Delegated Funding

                 

      14 to19 Provision

       

      750

             

      Extended Early Years Entitlement

      1,070

      470

             

      Early Years SEN

      52

      55

             

      New SEN Early Years Resourced Provision

      145

      110

             

      Early Years Formula - Transition

      56

               

      SEN Preventative Services

       

      59

             

      Pay and Benefits - Central Spending

      119

      159

             

      Specialist Education Support for Children

      27

         

      1.0

         

      Prudential Borrowing - Autistic Provision

       

      165

             

      Communication and Language Team

      99

         

      2.0

         

      Specialist Teacher Advisory Service

      73

         

      2.0

         

      Behaviour Intervention Service

      40

               

      Education Inclusion Service

      200

         

      5.1

         

      Ethnic Minority Service

      44

         

      0.4

         

      Admissions

      150

      75

       

      3.0

         

      Other Supply Cover

      100

               

      Children Looked After in Early Years Settings

      92

               

      Minibus Driver Training

      20

      40

             

      Equal Pay Fund

      396

      -396

             

      Sub-total Non Delegated Growth Proposals

      2,683

      1,487

       

      13.5

         

      Total increase allowed in the budget guidelines

      7,749

      7,815

      -

      85.5

      125.0

      -

        2. Proposals for growth and redeployment 2009/10 to 2011/12 - Non Schools

        Proposals are shown at outturn prices for the relevant year.

        Agreed proposals will be incorporated into future year's base budgets and so on-going costs are shown in the first year only. One-off costs are shown in the first year and subtracted from the following year.

       

      Staffing (FTEs)

       
       

      2009/10

      2010/11

      2011/12

      2009/10

      2010/11

      2011/12

      Link to Corporate Strategy

       

      £000

      £000

      £000

           

      Growth proposals:

                   

      Building Schools for the Future

      200

      100

       

      3.0

      2.0

       

      a) 1.5

      Children in Care (Foster Care allowances, skills fees and support)

      600

      550

      500

      1.0

      1.0

      1.5

      a)2.3

      Family Group Conferences

      50

      50

             

      c) 1.1

      Wessex Youth Offending Team

      25

         

      1.0

         

      b) 5.4

      a) 1.1

      Home to School Transport

      800

      200

      200

           

      c) 1.1

      Services for Young People

      381

      351

      330

           

      b) 1.5

      IT Operational Investment

      339

               

      b) 1.7

      Interest on School Balances

      750

               

      c) 2.1

      Other Operational Pressures

      168

      48

       

      2.0

      1.0

       

      Various

      Young Carers

      45

               

      b) 1.7

      One-off Invest to Save Funding in 2008/09

      1,400

                 

      Invest to Save Repayment

       

      1,400

      -1,400

             

      Resources to be Allocated

         

      2,120

             

      Total Growth Proposals

      4,758

      2,699

      1,750

      7.0

      4.0

      1.5

      1.5

      Redeployment proposals:

                   

      Reduction in Independent Fostering Placements

      -300

      -600

      -800

           

      a) 3.1

      C) 1.3

      Re-profiling of Children in Care Budgets

      -400

               

      a) 3.1

      C) 1.3

      Reduced Contribution to Hampshire Inspection and Advisory Service

      -315

               

      a) 3.1

      C) 1.3

      Home to School Transport contracts

      -200

      -200

      -200

           

      a) 3.1

      C) 1.3

      Denominational Transport

      -25

               

      a) 3.1

      C) 1.3

      Use of Grant Flexibility

      -756

      95

             

      a) 3.1

      C) 1.3

      Further Savings to be Identified

      -1,562

      -734

             

      a) 3.1

      C) 1.3

      Total Redeployment Proposals

      -3,558

      -1,439

      -1,000

           

      a) 3.1

      C) 1.3

      Total increase allowed in the budget guidelines

      1,200

      1,260

      750

      7.0

      4.0

      1.5

       

      Total Schools and Non Schools:

                   

      Growth Proposals

      12,507

      10,514

      1,750

      92.5

      129.0

      1.5

       

      Redeployment Proposals

      -3,558

      -1,439

      -1,000

      -

      -

      -

       

      Net Growth and Redeployment Proposals

      8,949

      9,075

      750

      92.5

      129.0

      1.5

       

        Environment

        Summary of service pressures, redeployment of resources and savings 2009/10 to 2011/12

        Proposals are shown at outturn prices for the relevant year.

        Agreed proposals will be incorporated into future year's base budgets and so on-going costs are shown in the first year only. One-off costs are shown in the first year and subtracted from the following year.

      Staffing (FTEs)

      2009/10

      2010/11

      2011/12

      2009/10

      2010/11

      2011/12

      Link to Corporate Strategy

      £'000

      £'000

      £'000

      SERVICE PRESSURES

      Highways maintenance Routine highways maintenance

      Term highways contract - excess inflation arising from annual contract re-pricing

      665

      -

      -

      -

      -

      -

      c) 2.1

      Flood mitigation and response - preparation of management plan, mapping and additional infrastructure works

      380

      -50

      -50

      -

      -

      -

      a) 3.5

      b) 7.3

      Verge and shrub maintenance - additional sum to manage shrub encroachment

      50

      -

      -

      -

      -

      -

      A and B roads speed limit review

      50

      -

      -50

      -

      -

      -

      b) 3.2

      b) 3.3

      a) 1.4

      Street lighting

      Street lighting PFI - higher maintenance costs

      300

      300

      -

      -

      -

      -

      a) 3.7

      Energy - price rises at end of current contract

      -

      -

      1,000

      -

      -

      -

      c) 2.1

      Total highways maintenance

      1,445

      250

      900

      -

      -

      -

      Road safety

      Village 30 - advertising and enforcement

      213

      4

      -

      -

      -

      -

      b) 3.3

      a) 1.4

      Total road safety

      213

      4

      -

      -

      -

      -

      Public transport

      Bus subsidies - estimated higher costs arising from area retendering process, commercial service de-registrations, revenue support for ferries and tendering community transport contracts

      272

      502

      375

      -

      -

      -

      c) 2.1

      Fall out of existing external funding (DfT bus challenge funding for Fordingbridge and Romsey)

      -

      45

      -

      -

      -

      -

      c) 2.4

      Total public transport

      272

      547

      375

      -

      -

      -

      Staffing and support costs

      Traffic Management Act (TMA) - additional resources required for works and event co-ordination under TMA Network Management Duty

      60

      100

      -

      2

      4

      -

      b) 3.4

      a) 3.6

      Income - estimated reduction in net income from land search and other development related fees

      100

      100

      -

      -

      -

      -

      c)2.2

      IT - additional costs arising from departmental office moves and implementation of Hampshire workstyle programme

      214

      -23

      -

      -

      -

      -

      a)3.1

      Partnership activities - replacement of one-off funding for contribution to Partnership for Urban South Hampshire

      85

      -

      -

      -

      -

      -

      a) 3.6

      Externally funded staff - provision for additional staff within Landscape, Planning and Heritage, and Ecology sections

      78

      -

      -

      2

      -

      -

      c) 1.3

      a) 3.1

      Total staffing and support costs

      537

      177

      -

      4

      4

      -

      Major scheme development

      Replacement of one-off funding towards the development of major transport schemes

      480

      -

      -

      -

      -

      -

      a) 3.6

      Total major scheme Development

      480

      -

      -

      -

      -

      -

      Total service pressures

      2,947

      978

      1,275

      4

      4

      -

      REDEPLOYMENT AND SAVINGS PROPOSALS

      Term highways contract - programme of initiatives to improve efficiencies under the contract

      50

      50

      50

      -

      -

      -

      a) 3.1

      c) 1.3

      Street lighting PFI - agreed corporate funding towards project

      300

      -

      -300

      -

      -

      -

      a) 3.7

      Safer Roads Partnership - anticipated reduction in County Council contribution to Partnership

      213

      4

      -

      -

      -

      -

      a) 3.1

      c) 1.3

      Waste management - reduced budget requirement for abandoned vehicles

      100

      -

      -

      -

      -

      -

      a) 3.1

      c) 1.3

      Staffing and support costs - staff savings arising from management reviews and other efficiencies

      579

      -

      -

      -18

      -

      -

      a) 3.1

      c) 1.3

      Non staff overheads - various efficiency savings

      60

      18

      -

      -

      -

      -

      a) 3.1

      c) 1.3

      Externally funded staff - match funding income from other local authorities and highways consultant fees

      78

      -

      -

      -

      -

      -

      a) 3.1

      c) 4.3

      Transport capital programme - transfer to provide funding towards the development of major transport schemes

      300

      -

      -

      -

      -

      -

      a) 3.1

      c) 1.3

      Re-prioritisation of budgets to accommodate spending pressures and offset higher inflation costs

      1,217

      472

      225

      -

      -

      -

      a) 3.1

      c) 1.3

      Public transport - savings from reduction in publicity for one year and use of savings available in base budget

      50

      25

      -

      -

      -

      -

      a) 3.1

      c) 1.3

      Future funding to be identified, including sums required to offset higher street lighting PFI and energy costs

      -

      459

      1,300

      -

      -

      -

      a) 3.1

      c) 1.3

      Total redeployment and saving proposals

      2,947

      978

      1,275

      -18

      -

      -

       

        Policy and Resources Service

        Proposals for growth and redeployment 2009/10 to 2011/12

        Proposals are shown at outturn prices for the relevant year.

        Agreed proposals will be incorporated into future year's base budgets and so on-going costs are shown in the first year only. One-off costs are shown in the first year and subtracted from the following year.

         

      Staffing (FTEs)

       

      2009/10

      2010/11

      2011/12

      2009/10

      2010/11

      2011/12

      Link to Corporate Strategy

      £'000

      £'000

      £'000

           

      Redeployment proposals:

      Chief Executive:

      HR pay and benefits team

      425

      -425

      -

      -

      -7

      -

      c) 1.2

      HR team - equal pay claims

      125

      -60

      -65

      -

      -1

      -1

      c) 1.2

      Employment law team - equal pay litigation

      100

      -50

      -50

      -

      -1

      -1

      c) 1.2

      External legal costs - equal pay litigation

      150

      -75

      -75

      -

      -

      -

      c) 1.2

      County Treasurer:

      Pay and benefits implementation

      45

      -45

      -

      -

      -

      -

      c) 1.2

      Property, Business and Regulatory Services:

      Community Safety Officer Service

      50

         

      -

      -

      -

      a) 1.1

      Hampshire workstyle project team costs

      249

      -249

       

      -

      -

      -

      a) 3.1

      Carbon reduction commitment

      187

      -187

       

      -

      -

      -

      a) 3.5

      Property Services

      200

      -200

       

      -

      -

      -

       

      Total redeployment proposals

      1,531

      -1,291

      -190

      -

      -9

      -2

       

      Funding:

                   

      Transfers from capital

      636

      -636

             

      c)1.3

      Transfer from SEERA budget

      50

               

      a) 3.1

      c) 1.3

      Pay and Benefits reserve

      845

      -655

      -190

           

      c) 1.2

      Total funding

      1,531

      -1,291

      -190

             

        Recreation and Heritage

        Proposals for growth and redeployment 2009/10 to 2011/12

        Proposals are shown at outturn prices for the relevant year.

         

      Staffing (FTEs)

       

      2009/10

      2010/11

      2011/12

      2009/10

      2010/11

      2011/12

      Link to Corporate Strategy

      £'000

      £'000

      £000

      Growth proposals:

      Spydus

      150

      -

      -

      -

      -

      -

      c) 1.2

      Transforming through Technology Agenda (including Hants File)

      70

      -

      -

      -

      -

      -

      c) 1.2

      Health and Safety Auditor

      25

      -

      -

      -

      -

      -

      a) 1.6

      Rural Strategy Implementation

      30

      -

      -

      -

      -

      -

      a) 2.1

      Adult Learning

      35

      -

      -

      -

      -

      -

      a) 1.6

      Countryside Access Grants

      25

      -

      -

      -

      -

      -

      a) 1.6

      Service Development

      70

      -

      -

      -

      -

      -

      a) 1.6

      Youth Officer

      25

      -

      -

      -

      -

      -

      a) 1.6

      Total increase allowed in the budget guidelines

      430

      -

      -

      -

      -

      -

       

      Redeployment proposals:

      -430

      -

      -

      -

      -

      -

      a) 3.1

      c) 1.3

      Total redeployment proposals

      -430

      -

      -

      -

      -

      -

       

      Net change

      -

      -

      -

      -

      -

      -

       

    Linking Spending and Savings Proposals to the Corporate Strategy

    Key to references in Appendix 2A to 2E

    a) Corporate Improvement Priorities

    1 Customer / Community Focus - What People Want

      1.1 Community Safety: Work in partnership to tackle violent crime and assault with injury

        1.2 Personalisation: Roll out the personalisation agenda (inc work with partners)

        1.3 Road Maintenance: Improve the condition of the most highly trafficked roads (principal & non principal) and reprioritise spending to prevent pot hole formation and flood risk

        1.4 Road Safety: Reduce road accidents (KSI) and local traffic calming (e.g. Village 30)

        1.5 Schools: Maintain and continue to improve general school attainment

        1.6 Culture and Recreation:

          · Widen services to older people, including access, wellbeing and adult learning

          · Grow offer to young people universally to improve wellbeing (in addition to intervention services)

      1.7 Extra Care: Increase the level of extra care housing options

        1.8 Care Services: Improve acceptable waiting times for care packages and equipment

        1.9 Waste: Increase recycling and further reduce landfill

        1.10 Community Intelligence and Engagement: Strengthen understanding and influence of the local community, particularly hard to reach groups

        1.11 Service Channels: Continue to exploit Hantsdirect and new avenues for access

        1.12 Locality Working: Develop locality working

    2 Reducing Inequalities

        2.1 Rural: Tackle inequalities of access to local services in rural areas, particularly for older and younger people, and strengthen rural sustainability

        2.2 Inequalities: Address inequalities, particularly health and economic

          2.3 Children in Care: Improve placement stability and educational attainment

        2.4 Safeguarding: Secure child safeguarding, specifically repeat child protection plans

        2.5 Vulnerable Groups: Narrow the attainment and life chances gap

        2.6 Children with Disabilities: Extend respite and leisure opportunities

        2.7 Health Services: Improve health services for children, specifically CAMHS, teenage conceptions and obesity

            2.8 NEET: Reduce young people not in employment, education or training

        2.9 Permanently Excluded from School: Reduce the number and strengthen alternative educational provision

    2.10 Safeguarding: Improve the number of adults referred and Board membership

          2.11 Quality of Life: Increase telecare take-up, integrated single assessments and direct payments

        2.12 Learning Disabilities: Help adults with a learning disability to live at home

        2.13 Deprived Communities: Grow aspirations, community development and cohesion

    3 Improving Capacity to Deliver

        3.1 Value for Money: Deliver the efficiency programme, corporate and central services review and Hants workstyle

        3.2 Strategic HR: Strengthen workforce planning and organisational development

        3.3 VCS: Increase engagement and develop capacity in the voluntary and community sector

        3.4 Joint Working with Health: Increase learning disability clients living in NHS campuses, continuing healthcare, joint budgets and co-production

        3.5 Sustainability and Climate Change: Foster and encourage sustainability and build resilience to climate change

        3.6 Growth: Manage growth, including transport, planning, housing and utilities

        3.7 Street Lighting PFI: Manage the risks and implementation

    b) Local Area Agreement Themes

    1 Children and Young People (A)

        1.1 Improve mental and emotional health

        1.2 Tackle childhood obesity

      1.3 Reduce teenage pregnancies

      1.4 Reduce the gap in achievements of the most vulnerable children

        1.5 Improve the life chances of 16-19 year olds at risk of under-achievement

        1.6 Improve services for children in care and on the edge of care

        1.7 Safeguarding children

        1.8 Statutory targets - early years progress, school attainment, secondary school absence, attainment of looked after children

    2 Employment, Skills and Business Support (B)

        2.1 Improving skills

        2.2 Employment

        2.3 Business growth

        2.4 Resident / Worker earnings gap

    3 Accessibility and Transport (C)

        3.1 Highway maintenance

        3.2 Road safety and casualties

        3.3 Quality of life and safety in rural villages

        3.4 Congestion hot-spots

        3.5 Accessibility

    4 Housing and Accommodation (D)

        4.1 Affordable housing

        4.2 Fuel poverty

    5 Safer Communities (E)

        5.1 Domestic abuse

        5.2 Reduced adult re-offending

        5.3 Drug related offending

        5.4 Youth Justice system entrants

    6 Health and Wellbeing (F)

        6.1 Emergency hospital admission risk, especially for vulnerable people

        6.2 Information and support for older people to live independently

        6.3 Improved health and wellbeing and reduced inequalities related to deprivation

        6.4 Promote independent living for vulnerability

        6.5 Alcohol abuse

    7 Environment (G)

        7.1 Efficient use of material resources

        7.2 Mitigate progress of climate change

        7.3 Adapt to consequences of climate change

    8 Strong Communities (H)

        8.1 Improve community engagement

      8.2 Sustainable third sector

    c) Financial context to the corporate strategy

    1 Financial Context to the Corporate Strategy

      1.1 Demographic and legislative pressures:

          · Aging population and increased number of young people with complex disabilities living into adulthood

          · Higher waste disposal costs due to national policies linked to landfill and hazardous waste directives

          · Increased numbers of vulnerable children being identified

        1.2 Major change programmes:

          · Development of Hantsdirect

          · Pay and benefits programme

        1.3 Review programmes to enable spending pressures to be accommodated and to achieve targeted efficiency savings

    2 Financial Management Policies

        2.1 In order to allow services to operate within firm cash limits, allocate provision for inflation to services at the start of the financial year and require excess inflation to be absorbed.

        2.2 Services expected to contain spending within the approved cash limit with no supplementary allocations being available other than in exceptional circumstances unless a specific contingency provision made within the budget

        2.3 Services expected to carry forward 100% of any overspending against the overall service case limit, but are allowed to retain up to 100% of any planned underspending identified prior to the approval of the following year's budget. 50% of any unplanned underspending can automatically be carried forward

        2.4 Encourage chief officers to submit applications for specific grant / partnership funding designed to maximise the resources available to the County Council, by allowing capital and revenue cash limits to be adjusted to reflect changes in grant levels

        2.5 Require Services to review the level of fees and charges at least annually and set budget limits on the assumption that the level of charges will be increased in line with assumed inflation on gross expenditure.