Archived decisions

HAMPSHIRE COUNTY COUNCIL

Decision Report

Decision Maker:

Executive Member for Culture, Communities and Recreation

Date of Decision:

10 September 2009

Decision Title:

Financial and Performance Monitoring 2009/10

Decision Reference:

892

Report From:

Director of Culture, Communities and Rural Affairs and the County Treasurer

Contact name:

Bevis Ingram

Stuart Dorward

Tel:

01962 847508

01962 846110

Email:

[email protected]

[email protected]

1. Executive Summary

1.1. The purpose of this paper is to present the first detailed financial monitoring information for the year 2009/10, along with key performance and workforce information for the first quarter of the year. The report also outlines a significant government grant (£5.9 million) for an Outdoor Centre in the north of the County.

1.2. The financial position is that, if no further managerial action were taken, there would be an overspending of £220,000 as shown in Appendix C. However, action will be taken to ensure that, as in previous years, a balanced budget position will be achieved. More detailed financial information for each service is shown in Appendix D. The Services' key performance indicators show generally good participation levels in CCRA services. Workforce indicators show a reduction in the levels of staff turnover, sickness levels, and the number of overtime hours worked.

2. Financial Position 2009/10

2.1. The revenue budget position, based on activity to the end of July, is attached. This shows that, in the absence of further managerial action, there would be an overspending of £220,000.

2.2. The main factors in this are:

    · Library and Information Service: + £158,000

      The Library Service continues to experience financial pressures as reported in recent years. These arise from a combination of factors including :

        · a significant reduction in DVD and fine income in recent years (part of a national trend)

        · the need to fund high priority developments, such as the cost of maintaining the public IT network in libraries (People's Network)

        · the fact that efficiency and other savings are difficult to achieve by "housekeeping" measures when a major proportion of the budget is committed to maintaining a major network of libraries based in fixed property assets.

      The largest budget in the Library Service is staffing and over a period of seven years regular attempts have been made to reduce the headcount, including restructuring exercises in 2003 and 2007. This process needs to continue to ensure that the service lives within its means, continues to modernise and to deal with any future constraints that will be placed on the County Council's budget.

      The approach adopted to meeting these financial pressures includes making vacancy management savings as the opportunity arises, and holding back an element of the Materials Fund. In addition, £250,000 growth money was allocated in 2009/10 to complete the Library Service restructuring and modernisation with the intention of avoiding future calls on the Materials Fund. In the short term the majority of this money has been used to offset the financial pressures, pending a more radical review.

      The Vision and Strategy for the Library Service that was approved in June 2009 outlined the future direction of the Service including the need to ensure future financial sustainability. A root and branch review is now being undertaken and has informed the Proposal for Improved Library Services in Hampshire presented to this Decision Day in agenda item 1.

    · Milestones Museum: + £38,000

      This projected overspending represents the worst case position and reflects the fact that visitor numbers in the early part of the year were below budgeted levels. Partly owing to the disappointing summer weather, there has been some improvement, although this has not been sufficient to compensate fully for the early year performance. There are, however, major events planned later in the financial year at Milestones, and these could well result in generating additional income. In September last year, a similar overspending was being forecast and the final outturn was £16,000 over budget.

2.3. Performance Indicators - shown in Appendix E - suggest that the majority of services will meet their targets for participation levels in 2009/10. As yet there is no specific indication that the economic recession has had an adverse impact on service usage. Nor is there any strong evidence that income levels have been hit by the economic situation.

2.4. For the first time, workforce information is included in Appendix F to this report. This shows that there has been a small increase in headcount over the last four quarters. One of the major factors in this has been the transfer to CCRA from Children's Services of Hampshire Learning. Other factors include an increase in fixed term appointments linked to external funding such as Renaissance in the Regions and Find Your Talent. At the end of the quarter, there were 1,024 full-time staff: the budget supports an average of 1,011 f.t.e. Seasonal factors mean that it is not unexpected that staffing numbers should be at a peak in early summer.

2.5. There has been a decrease in the number of overtime hours - whilst there was the seasonal increase in the first quarter in 2009/10, the actual level is the lowest in three years. There has also been a similar trend in staff turnover, and recruitment to vacant posts remains buoyant. Meanwhile sickness absence levels have remained reasonably consistent, with some reduction in the last two quarters.

3. Runways End Project

3.1. The County Council has been awarded almost £5.9 million (£5,896,500) of the Government's Co-location Fund in support of the development of the Runways End Youth Adventure Centre, in partnership with Rushmoor Borough Council and the Blackwater Valley Scout Association. The Centre will provide a wide range of outdoor adventure and sports facilities as well as team and personal development courses. The total capital cost is £6.1 million - the additional £200,000 will be directly incurred and funded by Rushmoor Borough Council. The inclusion of a scheme of this size in the Capital Programme needs the approval of Cabinet and this is reflected in the recommendation to this report.

3.2. Detailed work is still being undertaken on identifying the additional revenue cost of running Runways End, which is scheduled to open in September 2011. Based on experience of the County Council's other outdoor centres, it is estimated that the running costs of Runways End will be in the region of £220,000 p.a. (although this figure does not include a sum to refresh equipment thus not only guaranteeing safety but also encouraging repeat use of the facilities). Income estimates are currently in the region of £175,000. It is more difficult to predict income with confidence than it is expenditure. It should also be noted that included in the income estimate is approximately £50,000 of usage by schools. It is likely that some of this income would otherwise have been spent at existing outdoor centres and this would have an impact on the service's overall net budget.

3.3. It is conceivable, therefore, that the additional net revenue costs to the service will be in the range £50,000 to £100,000. Of this, £30,000 has already been identified through a decision taken in November 2007 to reduce funding support to Southampton and Portsmouth Outdoor Activity Centres. Work is continuing to refine the assessment of additional cost, and this will form part of the project appraisal.

4. Recommendations

4.1. That the financial, performance and workforce monitoring information be noted.

4.2. That it be a recommendation to Cabinet that £5,897,000 be added to the Culture, Communities and Rural Affairs Capital Programme for 2009/10 for the Runways End Project - which is funded by Central Government - subject to project appraisal before the scheme is implemented.

CORPORATE OR LEGAL INFORMATION:

Links to the Corporate Strategy

Hampshire safer and more secure for all:

yes

Corporate Business plan link number (if appropriate):

Maximising well-being:

yes

Corporate Business plan link number (if appropriate):

Enhancing our quality of place:

yes

Corporate Business plan link number (if appropriate):

Section 100 D - Local Government Act 1972 - background documents

 

The following documents discuss facts or matters on which this report, or an important part of it, is based and have been relied upon to a material extent in the preparation of this report. (NB: the list excludes published works and any documents which disclose exempt or confidential information as defined in the Act.)

 

Document

Location

None

 

Appendix B

IMPACT ASSESSMENTS:

1. Equalities Impact Assessment:

1.1. The proposals in this report are in accordance with the budget strategy and the County Council's financial management policy. This policy applies equally to all services and ensures consistent financial management decisions across all services, and the proposals in this report are not considered discriminating.

CULTURE, COMMUNITIES AND RURAL AFFAIRS

     

APPENDIX C

             

BUDGET MONITORING REPORT 2009/10

         
             

POSITION AT END July 2009

         
             
     

     

2008/09

   

2009/10

2009/10

2009/10

2009/10

     

Actual to

Forecast

Current Forecast

Actual

Division of Service

 

Budget

end July

Outturn

Variance

£' 000

   

£' 000

£' 000

£' 000

£' 000

             

1,295

Archives

 

1,319

387

1,305

-14

19,221

Libraries

 

19,262

4,499

19,421

159

195

Hampshire Learning

 

251

-1,761

251

0

2,465

Museums Main Service

 

2,448

1,013

2,441

-7

330

Milestones

 

336

147

373

38

580

Tourism Marketing and Design

 

587

146

587

0

2,115

Arts

 

2,250

830

2,250

0

5,043

Countryside

 

4,970

606

4,995

26

1,890

Sport, Community and Outdoor Services

2,077

-621

2,077

0

164

Calshot

 

284

-711

284

0

498

Policy Development Initiatives

 

597

11

616

19

902

Director & Business Development

 

1,029

318

1,028

-1

             
             

34,698

Total

 

35,409

4,865

35,629

220

             
             

 

CULTURE, COMMUNITIES AND RURAL AFFAIRS

APPENDIX D

 

BUDGET MONITORING REPORT 2009/10

 

POSITION AT END July 2009

 

2008/09

2009/10

2009/10

2009/10

2009/10

Actual

ARCHIVES

 

Actual to

Forecast

Current Forecast

 

Budget

end July

Outturn

Variance

£' 000

£' 000

£' 000

£' 000

       

1,017

Employees

1,035

356

1,017

-18

223

Premises

 

248

68

248

0

4

Transport

 

3

1

3

0

129

Supplies and services

119

14

123

4

17

Central support services

17

0

17

0

1,390

   

1,422

439

1,408

-14

95

Less income(fees and charges)

103

52

103

0

     

 

 

 

 

1,295

Net Current Expenditure

1,319

387

1,305

-14

             

   

 

CULTURE, COMMUNITIES AND RURAL AFFAIRS

 

APPENDIX D

             
 

BUDGET MONITORING REPORT 2009/10

       
             
 

POSITION AT END July 2009

       
             
             
             
             
             

2008/09

   

2009/10

2009/10

2009/10

2009/10

Actual

LIBRARIES

 

Actual to

Forecast

Current Forecast

     

Budget

end July

Outturn

Variance

     

£' 000

£' 000

£' 000

£' 000

£' 000

           
             

13,195

Employees

12,957

4,372

13,016

59

2,210

Premises

 

2,475

675

2,390

-85

580

Transport

 

606

159

594

-12

3,235

Supplies and services

2,975

286

3,022

47

2,449

Materials

 

2,606

656

2,606

0

175

Central support services

215

-6

215

0

21,844

   

21,834

6,141

21,843

9

1,085

Less recharges to Schools for service level agreements

1,088

1,115

1,088

0

20,759

   

20,746

5,026

20,755

9

1,537

Less income (fines,fees etc)

1,484

527

1,334

150

 

         

 

19,222

Net Current Expenditure

19,262

4,499

19,421

159

             

           

 

CULTURE, COMMUNITIES AND RURAL AFFAIRS

APPENDIX D

 

BUDGET MONITORING REPORT 2009/10

 

 

POSITION AT END July 2009

   

2008/9

2009/10

2009/10

2009/10

2009/10

Actual

HAMPSHIRE LEARNING

   

Actual to

Forecast

Current Forecast

 

Budget

end July

Outturn

Variance

£' 000

£' 000

£' 000

£' 000

       

823

Employees

 

513

318

513

0

5

Premises

 

0

3

0

0

26

Transport

 

17

43

17

0

210

Supplies and services

 

1,984

94

1,984

0

1,279

Support Services

 

0

74

0

0

2,343

   

2,514

531

2,514

0

2,148

Less income(fees and charges)

 

2,263

2,292

2,263

0

 

   

 

 

 

 

195

Net Current Expenditure

 

251

-1,761

251

0

             

 

CULTURE, COMMUNITIES AND RURAL AFFAIRS

 

APPENDIX D

             
 

BUDGET MONITORING REPORT 2009/10

     
             
 

POSITION AT END July 2009

       
             
             
             
             
             

2008/09

   

2009/10

2009/10

2009/10

2009/10

Actual

MUSEUMS MAIN SERVICE

 

Actual to

Forecast

Current Forecast

     

Budget

end July

Outturn

Variance

     

£' 000

£' 000

£' 000

£' 000

             

£' 000

           
             

3,255

Employees

3,189

872

3,176

-13

351

Premises

 

503

140

509

6

202

Transport

 

119

26

119

0

836

Supplies and services

987

97

987

0

87

Central support services

87

0

87

0

4,731

   

4,885

1,135

4,878

-7

94

Add recharges

91

0

91

0

4,637

   

4,794

1,135

4,787

-7

2,171

Less income (JMC contributions etc)

2,346

122

2,346

0

 

   

 

 

 

 

2,466

Net Current Expenditure

2,448

1,013

2,441

-7

             
             

 

CULTURE, COMMUNITIES AND RURAL AFFAIRS

 

APPENDIX D

             
 

BUDGET MONITORING REPORT 2009/10

     
             
 

POSITION AT END July 2009

       
             
             
             
             
             

2008/09

   

2009/10

2009/10

2009/10

2009/10

Actual

MILESTONES

 

Actual to

Forecast

Current Forecast

     

Budget

end July

Outturn

Variance

     

£' 000

£' 000

£' 000

£' 000

             
             

360

Employees

412

157

402

-10

332

Premises

 

379

189

413

34

4

Transport

 

5

2

5

0

397

Supplies and services

363

13

386

23

1,093

   

1,159

360

1,207

48

184

Less Basingstoke contribution

185

47

185

0

909

   

974

314

1,021

48

579

Less income

638

167

648

-10

         

 

 

330

Net Current Expenditure

336

147

373

38

             
             

 

CULTURE, COMMUNITIES AND RURAL AFFAIRS

APPENDIX D

             
 

BUDGET MONITORING REPORT 2009/10

     
             
 

POSITION AT END July 2009

       
             
             
             
             
             

2008/09

   

2009/10

2009/10

2009/10

2009/10

Actual

TOURISM MARKETING AND DESIGN

   

Actual to

Forecast

Current Forecast

     

Budget

end July

Outturn

Variance

     

£' 000

£' 000

£' 000

£' 000

             
             

433

Employees

 

488

138

487.6

-0

0

Premises

 

0

0

0

0

8

Transport

 

10

4

10.2

0

299

Supplies and services

 

257

128

257

-0

 

Central support services

 

0

0

0

0

740

   

755

270

754

-1

160

Less income

 

168

124

167.6

0

 

   

 

 

 

 

580

Net Current Expenditure

587

146

587

-0

             
 

         

 

CULTURE, COMMUNITIES AND RURAL AFFAIRS

APPENDIX D

             
 

BUDGET MONITORING REPORT 2009/10

     
             
 

POSITION AT END July 2009

       
             
             
             

2008/09

   

2009/10

2009/10

2009/10

2009/10

Actual

ARTS

   

Actual to

Forecast

Current Forecast

     

Budget

end July

Outturn

Variance

     

£' 000

£' 000

£' 000

£' 000

             
             

940

Employees

1,233

389

1,234

0

76

Premises

 

82

29

82

-0

20

Transport

 

21

11

21

-1

2,068

Supplies and services

2,327

1,165

2,327

0

56

Central support services

55

0

55

-0

3,160

   

3,718

1,594

3,718

-0

1,044

Less income (fees and charges)

1,468

764

1,468

1

 

   

 

 

 

 

2,116

Net Current Expenditure

2,250

830

2,250

0

             
             

 

CULTURE, COMMUNITIES AND RURAL AFFAIRS

APPENDIX D

             
 

BUDGET MONITORING REPORT 2009/10

     
             
 

POSITION AT END July 2009

       
             
             
             

2008/09

   

2009/10

2009/10

2009/10

2009/10

Actual

COUNTRYSIDE

 

Actual to

Forecast

Current Forecast

     

Budget

end July

Outturn

Variance

     

£' 000

£' 000

£' 000

£' 000

£' 000

           
             

3,571

Employees

4,040

1,231

3,860

-180

437

Premises

 

356

119

451

95

325

Transport

 

316

84

334

18

2,107

Supplies and services

1,331

-35

1,597

266

107

Central support services

110

0

109

0

6,546

   

6,152

1,399

6,350

199

1,503

Less income(fees and charges)

1,182

793

1,355

-173

 

   

 

 

 

 

5,043

Net Current Expenditure

4,970

606

4,995

26

             
             

 

CULTURE, COMMUNITIES AND RURAL AFFAIRS

APPENDIX D

             
 

BUDGET MONITORING REPORT 2009/10

   
             
 

POSITION AT END July 2009

       
             
             
             

2008/09

SPORT, COMMUNITY &

2009/10

2009/10

2009/10

2009/10

Actual

OUTDOOR SERVICES

 

Actual to

Forecast

Current Forecast

     

Budget

end July

Outturn

Variance

     

£' 000

£' 000

£' 000

£' 000

             
             

1,599

Employees

1,671

530

1,672

0

94

Premises

 

67

32

67

-0

97

Transport

 

97

27

97

-0

2,051

Supplies and services

2,118

687

2,119

1

62

Central support services

66

0

65

-0

3,903

   

4,019

1,277

4,019

1

2,013

Less income(fees and charges)

1,942

1,898

1,942

-0

 

   

 

 

 

 

1,890

Net Current Expenditure

2,077

-621

2,077

0

             
             

 

CULTURE, COMMUNITIES AND RURAL AFFAIRS

APPENDIX D

             
 

BUDGET MONITORING REPORT 2009/10

     
             
 

POSITION AT END July 2009

       
             
             
             
             
             

2008/09

   

2009/10

2009/10

2009/10

2009/10

Actual

CALSHOT

 

Actual to

Forecast

Current Forecast

     

Budget

end July

Outturn

Variance

     

£' 000

£' 000

£' 000

£' 000

             
             

1,597

Employees

1,711

532

1,711

0

404

Premises

 

477

144

477

0

49

Transport

 

59

13

59

0

576

Supplies and services

683

158

683

0

4

Central support services

4

5

4

0

2,630

   

2,934

851

2,934

0

2,466

Less income

2,650

1,563

2,650

0

 

   

 

 

 

 

164

Net Current Expenditure

284

-711

284

0

             
             

 

CULTURE, COMMUNITIES AND RURAL AFFAIRS

APPENDIX D

             
 

BUDGET MONITORING REPORT 2009/10

     
             
 

POSITION AT END July 2009

       
             
             
             

2008/09

   

2009/10

2009/10

2009/10

2009/10

Actual

POLICY DEVELOPMENT

 

Actual to

Forecast

Current Forecast

     

Budget

end July

Outturn

Variance

     

£' 000

£' 000

£' 000

£' 000

             
             
             
             

498

)Expanding the user base

597

94

616

19

 

)Innovation & service quality

       
 

)Market Development

       

498

)Staff Development

597

94

616

19

 

Less income (fees and charges)

0

83

0

0

             

498

Net Current Expenditure

597

11

616

19

             

 

CULTURE, COMMUNITIES AND RURAL AFFAIRS

APPENDIX D

             
 

BUDGET MONITORING REPORT 2009/10

       
             
 

POSITION AT END July 2009

       
             
             
             
             
             

2008/09

   

2009/10

2009/10

2009/10

2009/10

Actual

DIRECTOR AND BUSINESS DEVELOPMENT

 

Actual to

Forecast

Current Forecast

     

Budget

end July

Outturn

Variance

     

£' 000

£' 000

£' 000

£' 000

             
             

855

Employees

878

272

858

-20

3

Premises

 

0

0

0

0

23

Transport

 

25

3

25

0

51

Supplies and services

126

44

146

20

0

Central support services

0

0

0

0

932

   

1,029

319

1,029

0

30

Less income (fees and charges)

0

1

1

-1

     

 

 

 

 

902

Net Current Expenditure

1,029

318

1,028

-1

             
             

Appendix E

Participation and Satisfaction

     

Projected year end

     
     

Q1

Target

     

Libraries

2008/9

2009/10

2009/10

2009/10

     
 

Visits per 1,000 population

5,410

5,129

5650

5,129

     

Museums

             
 

Visits per 1,000 population (in person)

326

79

333

305

     
 

Number of pupils visiting in organised groups

37,897

9,547

35,000

       

Outdoor Centres

             
 

Number of users (Bednights)

51,400

16,250

52,000

49,719

     

Countryside

             
 

Number of visits to principal sites

1.52m

468,000

1.55m

1.55m

     

Arts Centres

             
 

Number of box office bookings

75,200

19,000

76,000

79,155