High Street, West End Accessibility Improvements

Last update: October 2026

Scheme overview

Hampshire County Council is developing a scheme to improve accessibility, remove barriers to movement, enhance road safety, and encourage walking and cycling in West End village centre. The proposals aim to create a more inclusive environment for all users while supporting the long-term vitality and viability of West End High Street.

The scheme is currently in the Detailed Design stage. Subject to approvals and funding, construction is anticipated to commence in Summer 2027.

Scheme Proposals

The proposed improvements include:

  • A new signal-controlled crossing west of Orchards Close making it safer and easier for people to walk, wheel (wheelchair / mobility scooter users) and cycle across the road.
  • New uncontrolled pedestrian crossing points at several locations throughout the scheme area.
  • A new one-way traffic system on Lower New Road.
  • Raised junction crossings at Lower New Road and Upper New Road.
  • Wider pavements on both sides of the High Street, where space allows.
  • Resurfacing works along the High Street and sections of adjoining side roads.

Traffic Regulation Orders

As part of the scheme, Hampshire County Council is also proposing a number of Traffic Regulation Orders (TROs), which would include:

  • Changes to existing parking restrictions and the introduction of new restrictions where necessary to support road safety and accessibility.
  • A reduction in the speed limit from 30mph to 20mph within the High Street and surrounding side roads.

High Street view

Feedback Survey Results June 2025

The High Street, West End Report summarises key findings from the feedback survey which took place from 27 January 2025 to 9 March 2025. This was an opportunity for local residents and businesses to provide their views on the proposed improvement scheme. You can still read the information pack (Microsoft Sway document). 

Feedback Survey Results - Autumn 2023

The report summarises key findings from the feedback survey which took place from 11 September to 22 October 2023 . This was an opportunity for local residents and businesses to provide their views on the proposed improvement scheme. You can still read the information pack. The feedback from this engagement has been used to inform the next stage of scheme design.

Funding Arrangements
Funding for the transport capital delivery schemes is separate from the County Council’s revenue budget and savings proposals. In the majority of cases funding comes from external grants and / or Section 106 contribution from developers. This funding usually has conditions that strictly control on how, where and when it can be spent.
Roadworks and Travel Advice
Visit Causeway One.Network which is where the planned works are published and is an independent platform that allows real-time monitoring of all the UK’s roadworks and diversions.

My Journey - travel information and travel advice choices in Hampshire.
Contact us
Address
Universal Services
Hampshire County Council
The Castle

Winchester
SO23 8UD