Development and harbour works
Development and maintenance works within the river require the permission of the Harbour Authority as well as other authorities. This is so the effect of the proposal on navigational safety and the environment can be evaluated.
Current and approved applications
Copyright
You must read and agree to the copyright information below before you access application information.
Plans, drawings and material submitted to the River Hamble Harbour Authority are protected by the Copyright Acts (Section 47, 1988 Act). You may only use material which is downloaded and/or printed for consultation purposes. You must not make further copies without the prior permission of the copyright owner.
The River Hamble Harbour Authority is unable to supply hard copies of plans and drawings, but you may view these at our office by prior arrangement. If hard copies are required, we can request them from the applicant on your behalf, but you are likely to be charged for these.
By opening links to application details, you are confirming you have read and agreed to abide by the terms of this notice.
Application | Description | Status | Dates relevant to application process | Expected construction date |
---|---|---|---|---|
Foulkes & Sons - Quay Wall Refurbishment & Pontoon Works at Riverside Boatyard, Blundell Lane, Bursledon, Southampton SO31 1AA |
Refurbishment of existing quay wall, installation of a pontoon on the existing concrete slipway, and two small extensions to existing pontoons (no piling).
Project details: |
To be determined | Deadline for written comments to RHHA is 2 August 2023 It is anticipated that the application will be discussed at the Management Committee meeting scheduled for 15 September 2023, and determined at the Harbour Board meeting scheduled for 6 October 2023. | TBC after all consents obtained. |
Royal Southern Yacht Club. Pontoon rearrangement at Prince Phillip Yacht Haven, Rope Walk, Hamble-le-Rice, Southampton SO31 4HB |
Minor rearrangement of walkway pontoon and installation of two finger pontoons. Relocation of one pile, removal of another pile. No change in berth numbers. Project details: |
Determined (valid till 6 October 2025) | N/A | TBC |
Retention of Jetty and Ecological Enhancements at Highfield, Green Lane, Lower Swanwick, SO31 7DF |
Retention of existing structure (retrospective application) and installation of new ecological enhancement to existing saltmarsh and intertidal area.
Project details:
|
Determined (valid till 14 July 2025) | N/A | TBC |
Dean & Reddyhoff Ltd. Relocation of existing access bridge and installation of new public access pontoon at Deacons Marina, Bridge Road, Bursledon, SO31 8AZ. |
The proposal is for:
Project details: |
Determined (valid till 7 January 2025) | N/A | TBC |
Replacement of river wall at Swanwick Shore Road car park, SO31 7EF (SU495 092) |
The project seeks to replace and rectify the failed frontage. Project details: |
Determined (valid till 29 July 2024) | N/A | TBC |
John Willment Marine Ltd. Additional Berthing Pontoons at Universal Marina, Crableck Lane, Sarisbury Green, SO31 7ZN |
Universal Marina - Rearrangement of marina berthing and additional berths. Project details: |
Determined (valid till 18 March 2024) | N/A | TBC |
John Willment Marine Ltd. Hoist Dock Pontoon at Universal Marina, Crableck Lane, Sarisbury Green, SO31 7ZN
|
Installation of a landing pontoon to improve vessel launching efficiency Project details: |
Determined (valid till 18 July 2022) | N/A | TBC |
Marina Developments Limited - proposed pier extension Hamble Point Marina, Hamble SO31 4NB |
This work at Hamble Point Marina is planned to extend five of the main piers to allow installation of one additional finger on each side of these piers, creating four extra berths per pier. New floating pontoon walkway sections and finger pontoons will be installed in line with existing infrastructure. Some of the walkway sections and fingers will need additional piles to ensure stability, and some existing piles will be relocated to ensure the piers remain stable. This project will not require any dredging. Project details: |
Time expired (originally approved) | N/A | N/A |
Comments submitted to RHHA will not be displayed online but please call the harbour office if you wish to know more.