Progress gallery
Images of work being carried out as part of the scheme
Box Structure Construction – Time-Lapse Video
Box Structure Progress

Box construction progress June 2025
Roundabouts

Aerial View of the box construction June 2025

Progress of the four roundabouts June 2025

Construction of the Broadway roundabout, taking place in the field to the west of the A32.

Construction of the Welborne approach roundabout.

Workers air testing within a manhole; constructed as part of the scheme to facilitate drainage.

Construction progress on Broadway Roundabout.
Guide slab

February 2025 - Progress on the Guide Slab

Guide slab drone image.

Applying polythene and grease to the guide slab makes the moving the box structure easier when it is pushed into its final position.

The reinforcement bars (rebar) are manufactured off-site and then hoisted by a crane onto the guide slab for the operatives to fix them together in place on-site.

The reinforcement bars (rebar) are affixed by hand. It acts like a skeleton within the structure. Once the concrete is poured it will give extra support for the box structure to stay strong and stable.

Progress of the guide slab with installation of the cables for pushing the box slide into position.

Ongoing guide slab construction.

Preparation of the guide slab for the box slide. This guide slab is crucial because it provides a stable and level surface on which the box structure will be built and eventually moved.

Construction of the guide slab. The slab will play a critical role in ensuring the underpass can slide accurately into its final position. Construction of the underpass box will begin once the slab is in place.

Ongoing box slide construction.

Preparatory works of the guide slab - drone image.

Artist's impression of the guide slab.
Ecology

December 2024 - The licensed ecologist inspected the dormouse nest boxes, removed old nesting material, and ensured the boxes were ready for the next breeding season.

February 2025 - Repaired reptile fencing south of the M27 and installed new sections north of the M27. Vegetation clearance in selected areas of the embankment to prepare for slip road construction.

March 2025 - New dormouse boxes were installed to comply with ‘European Protected Species Dormouse’ licences.